Elucidation of the fluvial processes influenced by dams provides better understanding of river protection and basin management. However, less attention has been given to the erosion intensity distribution of riverbeds and its association with channel morphology and hydrological conditions. Based on hydrological and topographic data, the spatial and temporal distributions of erosion intensity (2002–2014) influenced by the Three Gorges Dam (TGD) were analyzed for the Jingjiang reach of the Yangtze River. The mechanisms underlying the distribution of erosion intensity in response to hydrological conditions were investigated. The results are as follows: (1) The erosion intensities of different discharges were not uniform, and moderate flow (10 000–27 000 m3/s) produced the largest erosion magnitude among all flow ranges. Owing to the hydrological changes caused by flood reduction and prolongation of moderate flow duration after the TGD began operating, up to 70% of the erosion amount was caused by moderate flows. (2) The lateral distribution of erosion intensity was extremely uneven, as the proportion of cumulative erosion of the low‐flow channel within the bankfull channel reached 88% in 2013. This caused the channel to become narrower and deeper. (3) The longitudinal distribution of erosion intensity was inhomogeneous. The erosion intensity in the wide reaches was greater than that in the narrow reaches, leading to smaller differences in channel morphology along the river. (4) Changes in hydrological conditions influenced by the TGD, significant reduction of sediment concentration along with flood abatement, and increased duration of moderate flow discharges were the main factors affecting erosion distribution in the post‐dam period. Our conclusions can be applied to the Yangtze River as a basis for riverbed change estimations, and river management strategies. Copyright © 2018 John Wiley & Sons, Ltd.  相似文献   

2.
As with most Italian rivers, the Reno River has a long history of human modification, related also to morphological changes of the lower Po River since Roman times, but in the last decades, significant land use changes in the headwaters, dam construction, torrent control works and extensive bed material mining have caused important channel morphology and sediment budget changes. In this paper, two main types of channel adjustment, riverbed incision and channel narrowing, are analysed. Riverbed degradation is discussed by comparing four different longitudinal profiles surveyed in 1928, 1951, 1970 and 1998 in the 120 km long reach upstream of the outlet. The analysis of channel narrowing is carried out by comparing a number of cross‐sections surveyed in different years across the same downstream reach. Field sediment transport measurements of seven major floods that occurred between 2003 and 2006 are compared with the bedload transport rates predicted by the most renowned equations. The current low bedload yield is discussed in terms of sediment supply limited conditions due to land use changes, erosion‐control works and extensive and out of control bed material mining that have affected the Reno during the last decades. Copyright © 2011 John Wiley & Sons, Ltd.  相似文献   

3.
Using updated hydrological datasets from three stations, including Cuntan, Yichang and Hankou, covering the period of January 1992–December 2008, the influence of Three Gorges Dam (TGD) on streamflow and sediment load of the Yangtze River was investigated. Results indicated that TGD did not seem to exert a significant influence on streamflow occurring at three stations and changes in streamflow can be mainly attributed to streamflows of tributaries. However, a sharp decrease in the sediment load after the impoundment of TGD was observed. Clear water after the impoundment caused erosion of riverbed and resulted in more sediment at the Hankou station than at the Yichang station. No distinct changes in the annual and monthly maximum sediment loads were observed before and after the impoundment. Therefore, annual and monthly maximum sediment load changes should be subjected mainly to river hydraulics. This study has practical relevance for understanding the influence of large hydraulic structures on the hydrological processes of large rivers.  相似文献   

4.
River channel sedimentation in the lower reaches of the Yangtze River can be affected by both changes in sea level and changes in solid discharge from the upper river. To evaluate dynamic changes of sedimentation and erosion in the Jiangsu reach of the Yangtze River (about 330 km in length) from 1959 to 2003, databases were designed and constructed using a digital elevation model (DEM) of channel topography based on the Jiangsu River Relief Map for 1959, 1970, 1985, 1992, and 2003. The results indicated that the main course of the Yangtze River in Jiangsu Province had experienced an obvious switch from sedimentation to erosion status around 1985 because of the decreasing amount of solid load from the upper parts of the river channel after that year. The sedimentation process in the main course of the Jiangsu reach of the Yangtze River demonstrated the propulsive process of ‘downstream‐ward aggradations.’ Between 1985 and 2003, the erosion rate of the lower segment was greater than those of the middle and upper segments; this is probably because both channel flow and tide current had influenced the lower segment. When channel flow combines with tide current in the same direction, channel erosion can be intensified, especially if there is a solid load shortage in the channel. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

5.
以三峡工程为核心的梯级水库群联合调度运用显著改变水沙条件,坝下游河段出现长时间、长距离的冲淤调整,长江中下游沙量平衡分析是合理评估水库群修建对河道影响的重要依据,是河湖管理与保护的关键支撑.本文基于长时间序列原型观测资料,采用沙量平衡法分析长江中下游不同时空尺度泥沙沿程恢复特征,对比断面地形法计算结果,结合河道空间区域性特征,从临底悬沙测验误差、断面代表性及断面间距、河道采砂等多角度深入揭示两种方法计算冲淤量产生差异的主要原因.结果表明:(1)2003-2018年宜昌至大通河段冲刷泥沙10.76亿t,其中粒径d<0.125 mm的泥沙冲刷量占比达90.9%.以螺山为界,宜昌至螺山段"粗细均冲",螺山至大通河段则"细冲粗淤";(2)宜昌至大通河段2003-2018年沙量平衡法与断面地形法计算冲淤量相对偏差为71%,从沿程差异分布来看,距离三峡大坝坝址较近的宜昌至沙市河段两方法计算绝对差值较小,而沙市至大通河段差值较大,占宜昌至大通全河段绝对偏差的近86%;(3)宜昌至沙市河段河道采砂量占实测河床冲刷量的比例约为20%,临底悬沙对输沙量的改正比例为13.2%~26.7%(平均约为20%),修正后,沙量平衡法、断面地形法计算结果吻合相对较好;沙市至大通河段泥沙测验、固定断面布设、河道采砂等是导致沙量平衡法与断面地形法出现差异的主要原因.  相似文献   

6.
Bo Wang  Yi-Jun Xu 《水文研究》2020,34(13):2864-2877
Bed material transport at river bifurcations is crucial for channel stability and downstream geomorphic dynamics. However, measurements of bed material transport at bifurcations of large alluvial rivers are difficult to make, and standard estimates based on the assumption of proportional partitioning of flow and bedload transport at bifurcations may be erroneous. In this study, we employed a combined approach based on observed topographic change (erosion/deposition) and bed material transport predicted from a one-dimensional model to investigate bed material fluxes near the engineering-controlled Mississippi-Atchafalaya River diversion, which is of great importance to sediment distribution and delivery to Louisiana's coast. Yang's (1973) sediment transport equation was utilized to estimate daily bed material loads upstream, downstream, and through the diversion during 2004–2013. Bathymetric changes in these channels were assessed with single beam data collected in 2004 and 2013. Results show that over the study period, 24% of the Mississippi River flow was diverted into the Atchafalaya River, while the rest remained in the mainstem Mississippi. Upstream of the diversion, the bed material yield was predicted to be 201 million metric tons (MT), of which approximately 35 MT (i.e., 17%) passed through the bifurcation channel to the Atchafalaya River. The findings from this study reveal that in the mainstem Mississippi, the percentage of bed material diversion (83%) is larger than the percentage of flow diversion (76%); Conversely, the diversion channel receives a disproportionate amount of flow (24%) relative to bed material supply (17%). Consequently, severe bed scouring occurred in the controlled Outflow Channel to the Atchafalaya River, while riverbed aggradation progressed in the mainstem Mississippi downstream of the diversion structures, implying reduced flow capacity and potential risk of a high backwater during megafloods. The study demonstrates that Yang's sediment transport equation provides plausible results of bed material fluxes for a highly complicated large river diversion, and that integration of the sediment transport equation with observed morphological changes in riverbed is a valuable approach to investigate sediment dynamics at controlled river bifurcations.  相似文献   

7.
The characteristics of water flow and sediment transport in a typical meandering and island-braided reach of the middle Yangtze River is investigated using a two-dimensional (2D) mathematical model. The major problems studied in the paper include the carrying capacity for suspended load, the incipient velocity and transport formula of non-uniform sediment, the thickness of the mixed layer on the riverbed, and the partitioning of bed load and suspended load. The model parameters are calibrated using extensive field data. Water surface profiles, distribution of flow velocities, riverbed deformation are verified with site measurements. The model is applied to a meandering and island-braided section of the Wakouzi-Majiazui reach in the middle Yangtze River, which is about 200 km downstream from the Three Gorges Dam, to study the training scheme of the navigation channels. The model predicts the processes of sediment deposition and fiver bed erosion, changes of flow stage and navigation conditions for the first 20 years of impoundment of the Three Gorges Project.  相似文献   

8.
The southeastern portion of the Yangtze River Estuary (or Yangtze Estuary) was considered to be the deposition center and the mudbank of the Yangtze River Delta.As the fluvial sediment supply began to decline in the 1980s and the reduction accelerated after the completion of the Three Gorge Dam in 2003,more fluvial sediment was trapped decreasing the suspended sediment concentration (SSC) environment in the river mouth area.Moreover,the accretion rate of the mudbank has slowed down in recent dec...  相似文献   

9.
Changes of subaqueous topography in shallow offshore water pose safety risks for embankments,navigation,and ports.This study conducted measurements of subaqueous topography between Datong and Xuliujing in the Yangtze River using a Sea Bat 7125 multi-beam echo sounder,and the channel change from 1998 to 2013 was calculated using historical bathymetry data.The study revealed several important results:(1)the overall pattern of changes through the studied stretch of the river was erosion–deposition–erosion.Erosion with a volume 700×10~6m~3occurred in the upper reach,deposition of about 204×10~6m~3occurred in the middle reach,and erosion of about 602×10~6m~3occurred in the lower reach.(2)Dunes are the most common microtopographic feature,accounting for 64.3%of the Datong to Xuliujing reach,followed by erosional topography and flat river topography,accounting for 27.6%and 6.6%,respectively.(3)Human activities have a direct impact on the development of the microtopography.For instance,the mining of sand formed holes on the surface of dunes with lengths of 20–35 m and depths of 3–5 m.We concluded that the overall trend of erosion(net erosion volume of 468×10~6m~3)occurred in the study area mainly because of the decreased sediment discharge following the closure of the Three Gorges Dam.However,other human activities were also impact factors of topographic change.Use of embankments and channel management reduced channel width,restricted river meandering,and exacerbated the erosion phenomenon.  相似文献   

10.
This paper presents a three-dimensional (3-D) numerical model to simulate morphological changes in alluvial channels due to bank erosion. A method for the simulation of bank erosion is established. This is incorporated into a 3-D mathematical model for turbulent flow and non-uniform, non-equilibrium sediment transport. This model is applied to simulate morphological changes in the Shishou bend of the middle Yangtze River in China, where serious bank erosions occurred during the last two decades. The double-layer sediment structure of the riverbank on the middle Yangtze River is taken into account in the bank erosion module. Both cohesive and non-cohesive bank material in the different layers are considered. The bank erosion module also includes other factors affecting the rate of bank erosion, such as the longitudinal length of failed bank, the thickness of each layer in the double-layer structure, and the erosion-resisting effect of cohesive material from the top layer of failed bank. A locally-adaptive grid system is proposed to efficiently simulate the lateral migration of alluvial channel due to bank erosion. The predictive capability of the 3-D model is examined by laboratory data. Simulated processes of bank erosion agree with field observations in the Shishou bend during the period of October 1996–October 1998, and the bank erosion module plays a significant role in simulating morphological changes of the study reach. In addition, the equivalent channel-forming discharge, which is defined as a constant discharge that can create the same amount of bank erosion in an alluvial channel as that created by natural runoff processes during the same period of time, is proposed to improve calculation efficiency for feasibility studies.  相似文献   

11.
This paper summarizes the latest developments, future prospects, and proposed countermeasures of reservoir sedimentation and channel scour downstream of the Three Gorges Reservoir (TGR) on the Yangtze River in China. Three key results have been found.(1) The incoming sediment load to the TGR has been significantly lower than expected.(2) The accumulated volume of sediment deposition in the TGR is smaller than expected because the overall sediment delivery ratio is relatively low, and the deposition in the near-dam area of the TGR is still developing.(3) River bed scour in the river reaches downstream of the Gezhouba Dam is still occurring and channel scour has extended to reaches as far downstream as the Hukou reach. Significantly, sedimentation of the TGR is less problematic than expected since the start of operation of the TGR on the one hand;on the other hand, the possible increases in sediment risks from dependence on upstream sediment control, deposition in the reservoir, and scour along middle Yangtze River should be paid more attention.(1) Sediment trapped by dams built along the upper Yangtze River and billion tons of loose materials on unstable slopes produced by the Wenchuan Earthquake could be new sediment sources for the upper Yangtze River. More seriously, possible release of this sediment into the upper Yangtze River due to new earthquakes or extreme climate events could overwhelm the river system, and produce catastrophic consequences.(2) Increasing sediment deposition in the TGR is harmful to the safety and efficiency of project operation and navigation.(3) The drastic scour along the middle Yangtze River has intensified the down-cutting of the riverbed and erosion of revetment, it has already led to increasing risk to flood control structures and ecological safety. It is suggested to continue the Field Observation Program, to initiate research programs and to focus on risks of sedimentation.  相似文献   

12.
The sediment load of the Yangtze River (China) is decreasing because of construction of dams, of which the Three Gorges Dam (TGD) is the best known example. The rate of the decline in sediment load is well known, but changes in the sediment grain size distribution have not been given much attention. The TGD mostly traps sand and silt while clay is flushed through the reservoir. A large amount of sand is available in the Yangtze River downstream of the reservoir, and therefore the pre-dam sand concentration is not substantially reduced. The availability of silt on the Yangtze River bed is limited, and it is expected that most silt will be removed from the riverbed within one to two decades. In order to evaluate the impact of the change in grain size distribution on the tidal flats of the Yangtze Estuary, a highly schematized tidal flat model is setup. This model broadly reveals that the observed deposition rates are exceptionally large because of the high sediment concentration, the abundance of silt, the seasonal dominance of waves (shaping a concave profile), and the offshore tidal asymmetry. The model further suggests that deposition rates will be limitedly influenced by reductions in clay or fine silt but strongly impacted by reductions in median to coarse silt. The response of the downstream morphology to reservoir sedimentation therefore strongly depends on the type of trapped sediment. As a consequence, silt-dominated rivers, such as the Yangtze River and the Yellow River may be more strongly impacted than sand-dominated systems.  相似文献   

13.
Upstream damming often causes significant downstream geomorphic adjustments. Remarkable channel changes have occurred in the Jingjiang Reach of the Middle Yangtze River, since the onset of the Three Gorges Project (TGP). Therefore, it is important to investigate the variations in different fluvial variables, for better understanding of the channel evolution characteristics as an example of the Jingjiang Reach. Recent geomorphic adjustments in the study reach have been investigated quantitatively, including variations in sediment rating curve, fluvial erosion intensity, channel deformation volume and bankfull channel geometry. These fluvial variables adjusted in varying degrees in response to the altered flow and sediment regime caused by the TGP operation. A focus of this study has been especially on variation in the bankfull channel geometry. Calculated bankfull dimensions at section‐ and reach‐scale indicate that: (i) there were significant bank‐erosion processes in local regions without bank‐protection engineering, with empirical relations being developed to reproduce the variation in bankfull widths at four typical sections; (ii) the variation in the reach‐scale channel geometry occurred mainly in the component of bankfull depth, owing to the construction of large‐scale bank‐revetment works, with the depth increasing from 13.7 m in 2002 to 15.0 m in 2014, and with an increase in the corresponding bankfull area of about 11%; and (iii) the reach‐scale bankfull channel dimensions responded to the previous 5‐year average fluvial erosion intensity during flood seasons at Zhicheng, with higher correlations for the depth and area being obtained when calibrated by the measurements in 2002–2012. Furthermore, these relations developed for the section‐ and reach‐scale bankfull channel geometry were also verified by the observed data in 2013–2014, with encouraging results being obtained. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

14.
《水文科学杂志》2013,58(2):457-465
Abstract

Periodicity of the runoff and the sediment load, and possible impacts from human activities and climatic changes, in the Yangtze River basin during 1963–2004 are discussed based on the monthly sediment and runoff data, and using the wavelet approach. Research results indicated that: (a) Sediment load changes are severely impacted by the different types of human activity (e.g. construction of water reservoirs, deforestation/afforestation); and the runoff variability is the direct result of climatic changes, e.g. the precipitation changes. (b) The impacts of human activity and climatic changes on the sediment load and runoff changes are greater in smaller river basins (e.g. the Jialingjiang River basin) than in larger river basins. The response of sediment load and runoff changes to the impacts of human activities and climatic changes are prompt and prominent in the Jialingjiang River basin relative to those in the mainstem of the Yangtze River basin. (c) Construction of the Three Gorges Dam has already had obvious impacts on the sediment transport process in the middle and lower Yangtze River basin, but shows no obvious influence on the runoff changes. Construction of the Three Gorges Dam will result in further re-adjustment of the scouring/filling process within the river channel in the middle and lower Yangtze River basin, and have corresponding effects on the altered sediment load because of the Dam's operation for the river channel, ecology, sustainable social economy and even the development of the Yangtze Delta. This will be of concern to local governments and policy makers.  相似文献   

15.
The Ma?a Panew is a meandering river that flows 20 km through a closed forest. During times of high discharge the riverbed and floodplain are transformed under the influence of riparian trees. The changes provide the opportunity to measure the intensity of erosion and sediment accumulation based on tree ages, the dating of coarse woody debris (CWD) in the riverbed, and the dating of eccentric growth of tilting trees and exposed roots. The bed and floodplain in reaches of the Ma?a Panew River with low banks were greatly altered as a result of long periods of flooding between 1960 and 1975. Banks were undercut during these floods and black alders tilted. Those parts of alder crowns or stems which tilt and sink generate small sand shadows. When erosion is intensive alder clumps are undercut from concave banks and become mid‐channel islands, while on the other side of the channel meandering bar levels are created. The reaches with higher banks were altered by large floods, especially in 1985 and 1997. The concave banks are undercut and sediment with CWD is deposited within the riverbed, forming sand shadows behind the CWD. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

16.
The hydrogeomorphology of the Vietnamese Mekong Delta (VMD) has been significantly altered by natural and anthropogenic drivers. In this study, the spatiotemporal changes of the flow regime were examined by analysing the long-term daily, monthly, annual and extreme discharges and water levels from 1980 to 2018, supported by further investigation of the long-term annual sediment load (from the 1960s to 2015), river bathymetric data (in 1998, 2014 and 2017) and daily salinity concentration (from the 1990s to 2015) using various statistical methods and a coupled numerical model. Then, the effects of riverbed incision on the hydrology were investigated. The results show that the dry season discharge (i.e., in March–June) of the Tien River increased by up to 23% from the predam period (1980–1992) to the postdam period (1993–2018) but that the dry season water level at My Thuan decreased by up to −46%. The annual mean and monthly water levels in June at Tan Chau and in January and June–October at My Thuan in the Tien River decreased statistically, even though the respective discharges increased significantly. These decreased water levels instead of the increased discharges were attributed to the accelerated riverbed incision upstream from My Thuan, which increased by more than three times, from a mean rate of −0.16 m/year (−16.7 Mm3/year) in 1998–2014 to −0.5 m/year (−52.5 Mm3/year) in 2014–2017. This accelerated riverbed incision was likely caused by the reduction in the sediment load of the VMD (from 166.7 Mt/year in the predam period to 57.6 Mt/year in the postdam period) and increase in sand mining (from 3.9 Mm3 in 2012 to 13.43 Mm3 in 2018). Collectively, the decreased dry season water level in the Tien River is likely one of the main causes of the enhanced salinity intrusion.  相似文献   

17.
Alluvial rivers are composed of self-formed channels which are sensitive to disturbances in their flow and sediment-supply regimes. Regime changes commonly occur over decadal and longer timescales and can be caused by anthropogenic alterations such as dam construction and removal. Advances in numerical modeling have increased our ability to explore geomorphic adjustments over long timescales; however, many models designed to be run for decades or longer assume that banks are immovable or that channel width is constant. Since river channels often respond to disturbance by adjusting their geometry, this is a significant shortcoming. To investigate the impact of long-term sediment supply alterations on channel geometry and stability, we have adapted MAST-1D, a reach-scale bed evolution model, to incorporate functions for bank erosion, vegetation encroachment, and local avulsions. The model is designed for medium-large, coarse multithreaded rivers and can be run over long (decades–centuries) timescales. Bank erosion is a function of the mobility and transport capacity for structurally-important grains which protect the bank toe. Vegetation growth is proportional to point bar width and occurs during conditions of low shear stress. Local avulsions occur when aggradation causes channel depth to drop below a threshold. We apply the model to the Elwha River in Washington, USA with the goal of investigating if and when the river recovers from dam emplacement and removal. The Elwha was dammed for nearly 100 years, and then two dams were removed, releasing a large pulse of sediment. We have modeled the set of reaches between the two dams. Our simulations suggest that channel response to dam emplacement occurs gradually over several decades but that the channel recovers to near pre-dam conditions within about a decade following the removal. The dams leave a lasting legacy on the floodplain, which does not completely recover, even after two centuries. © 2019 John Wiley & Sons, Ltd.  相似文献   

18.
19.
This study examined the effects of natural and anthropogenic changes in confining margin width by applying remote sensing techniques – fusing LiDAR topography with image‐derived bathymetry – over a large spatial extent: 58 km of the Snake River, Wyoming, USA. Fused digital elevation models from 2007 and 2012 were differenced to quantify changes in the volume of stored sediment, develop morphological sediment budgets, and infer spatial gradients in bed material transport. Our study spanned two similar reaches that were subject to different controls on confining margin width: natural terraces versus artificial levees. Channel planform in reaches with similar slope and confining margin width differed depending on whether the margins were natural or anthropogenic. The effects of tributaries also differed between the two reaches. Generally, the natural reach featured greater confining margin widths and was depositional, whereas artificial lateral constriction in the leveed reach produced a sediment budget that was closer to balanced. Although our remote sensing methods provided topographic data over a large area, net volumetric changes were not statistically significant due to the uncertainty associated with bed elevation estimates. We therefore focused on along‐channel spatial differences in bed material transport rather than absolute volumes of sediment. To complement indirect estimates of sediment transport derived by morphological sediment budgeting, we collected field data on bed mobility through a tracer study. Surface and subsurface grain size measurements were combined with bed mobility observations to calculate armoring and dimensionless sediment transport ratios, which indicated that sediment supply exceeded transport capacity in the natural reach and vice versa in the leveed reach. We hypothesize that constriction by levees induced an initial phase of incision and bed armoring. Because levees prevented bank erosion, the channel excavated sediment by migrating rapidly across the restricted braidplain and eroding bars and islands. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

20.
Retrogressive erosion, a widespread phenomenon of sediment transport in reservoirs, often impacts on both the reservoir capacity and the sedimentation in the downstream river channel. Based on field data from the Sanmenxia Reservoir and the Lower Yellow River over the past decades, three courses of ret-rogressive erosion with distinctive features were analyzed. The results indicate that retrogressive erosion, especially caused by rapid reduction in the water level till the reservoir is empty, often results in the serious siltation of the lower Yellow River and threatens the safety of the flood control in the Lower Yellow River. Unreasonable operation of the reservoir and incoming hyperconcentrated floods accom-panied by retrogressive erosion also aggravate the siltation of the main channel of the river. However, a reasonable operation mode of the reservoir so named"storing the clear (low sediment concentration) water in the non–flood season, and sluicing the muddy(high sediment concentration) water in the flood season" was found, which might mitigate the deposition in both the reservoir and the Lower Yellow River. This operation mode provides important experience for the design and operation of large reser-voirs in other large rivers carrying huge amounts of sediment.  相似文献   