首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Raise Beck is a mountain torrent located in the central Lake District fells, northern England (drainage area of 1·27 km2). The torrent shows evidence of several major flood events, the most recent of which was in January 1995. This event caused a major channel avulsion at the fan apex diverting the main flood flow to the south, blocking the A591 trunk road and causing local flooding. The meteorological conditions associated with this event are described using local rainfall records and climatic data. Records show 164 mm of rainfall in the 24 hours preceding the flood. The peak flood discharge is reconstructed using palaeohydrological and rainfall–runoff methods, which provide discharge values of 27–74 m3 s?1, and 4–6 m3 s?1, respectively. The flood transported boulders with b‐axes up to 1400 mm. These results raise some important general questions about flood estimation in steep mountain catchments. The geomorphological impact of the event is evaluated by comparing aerial photographs from before and after the flood, along with direct field observations. Over the historical timescale the impact and occurrence of flooding is investigated using lichenometry, long‐term rainfall data, and documentary records. Two major historical floods events are identified in the middle of the nineteenth century. The deposits of the recent and historical flood events dominate the sedimentological evidence of flooding at Raise Beck, therefore the catchment is sensitive to high magnitude, low frequency events. Following the 1995 flood much of the lower catchment was channelized using rip‐rap bank protection, re‐establishing flow north towards Thirlmere. The likely success of this management strategy in containing future floods is considered, based on an analysis of channel capacities. It is concluded that the channelization scheme is only a short‐term solution, which would fail to contain the discharge of an event equivalent to the January 1995 flood. Copyright © 2002 John Wiley & Sons, Ltd.  相似文献   

2.
Geomorphic evidence along bedrock-confined reaches of the Salt River in east-central Arizona provides a record of the river's largest flood events. Fine-grained flood slackwater deposits accumulated at channel margin irregularities several metres above the low-flow channel. Discharges associated with flow events responsible for the deposits were estimated by computer flow modelling. These estimates document flood magnitudes in excess of gauged historic streamflows. Relative and radiocarbon dating suggest that a flood record in excess of 600 y is preserved in the slackwater sequences. A prominent flood scar cut into grussy hillslope soils allows the extension of the prehistoric flood record to several thousand years. A maximum discharge estimate of 4600 m3s?1 affixed to the flood scar represents the largest flood event in the record, and is given a minimum recurrence interval of 1000–2000 y. The 1952 flood is the largest historic flow event experienced along the study reach and is estimated at 2900 m3s?1. Two palaeoflood events preserved in the slackwater stratigraphy exceed the 1952 event, and are given recurrence intervals of 300 and 600 y. The latter flood event had an estimated discharge of 3200 m3s?1. It is apparent that discharge estimates affixed to these infrequent, large-magnitude flood events approach a maximum with decreased probabilities (large recurrence intervals). This suggests that a physical limit on discharge may exist within the Salt River drainage basin and is perhaps directly related to drainage basin size.  相似文献   

3.
This paper describes and analyses a hillslope–channel slope failure event that occurred at Wet Swine Gill, Lake District, northern England. This comprised a hillslope slide (180 m3, c. 203 ± 36 t), which coupled with the adjacent stream, resulting in a channelized debris flow and fluvial flood. The timing of the event is constrained between January and March 2002. The hillslope failure occurred in response to a rainfall/snowmelt trigger, on ground recently disturbed by a heather moorland fire and modified by artificial drainage. Slide and flow dynamics are estimated using reconstructed velocity and discharge values along the sediment transfer path. There is a rapid downstream reduction in both maximum velocity, from 9·8 to 1·3 m s?1; and maximum discharge, ranging from 33·5 to 2·4 m3 s?1. A volumetric sediment budget quantified a high degree of coupling between the hillslope and immediate channel (~92%: 167 m3), but virtually all of the sediment was retained in the first‐order tributary channel. Approximately 44% (81 m3) of the slide volume was retained in the run‐up deposit, and termination of the debris flow prior to the main river meant that the remainder did not discharge into the fluvial system downstream. These results suggest poor transmission of sediment to the main river at the time of the event, but importantly an increase in available material for post‐event sediment transfer processes within the small upland tributary. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

4.
Large woody material (LWM) transported by rivers may be entrapped at critical stream geometry configurations (e.g. bridges) and therefore dramatically increase the destructive power of floods. This was the case in a Spanish mountain river where a flood event with a high degree of LWM transport took place in 1997. The aim of this study was to simulate a bridge clogging process and reconstruct the wood deposit patterns, modelling individual pieces of wood moving with the water flow and interacting among them and with the bridge. A two‐dimensional numerical model was developed to simulate the transport of LWM and its effect on hydrodynamics. Different scenarios for the wood transport rate allowed us to study the influence of inlet boundary conditions on bridge clogging. For the studied event, the scenario which best reproduced the bridge clogging effect and flood characteristics was one in which 60% of the total wood entered before the peak discharge. This dropped to 30% at the peak itself, and finally fell to 10% during the recession curve. In addition, the accumulation patterns of LWM along the reach were computed and compared with post‐event field photographs, showing that the model succeeded in predicting the deposition patterns of wood and those areas prone to form wood jams. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

5.
Geomorphological evidence and recent trash lines were used as stage indicators in a step-backwater computer model of high discharges through an ungauged bedrock channel. The simulation indicated that the peak discharge from the 26.7 m2 catchment was close to 150m3s?1 during the passage of Hurricane Charlie in August 1986. This estimate can be compared with an estimate of 130–160 m3s?1 obtained using the Flood Studies Report (FSR) unit hydrograph methodology. Other palaeostage marks indicate that higher stages have occurred at an earlier time associated with a discharge of 200 m3s?1. However, consideration of both the geometry of a plunge pool and transport criteria for bedrock blocks in the channel indicates that floods since 1986 have not exceeded 150 m3s?1. Given that the estimated probable maximum flood (PMF) calculated from revised FSR procedure is at least 240 m3s?1, it is concluded that compelling evidence for floods equal to the PMF is lacking. Taking into consideration the uncertainty of the discharge estimation, the 1986 flood computed using field evidence has a minimum return period of 100 years using the FSR procedure. This may be compared with a return period for the same event in the neighbouring gauged River Greta of > 100 years and a rainfall return period of 190 years. In as much as discharges of similar order to FSR estimates are indicated, it is concluded (a) that regional geomorphological evidence and flood simulation within ungauged catchments may be useful as a verification for hydrological estimates of recent widespread flood magnitude and (b) that palaeohydraulic computation can be useful in determining the magnitude of the local maximum [historic] flood when determining design discharges for hydraulic structures within specific catchments.  相似文献   

6.
A spatially distributed, physically based, hydrologic modeling system (MIKE SHE) was applied to quantify intra‐ and inter‐annual discharge from the snow and glacierized Zackenberg River drainage basin (512 km2; 20% glacier cover) in northeast Greenland. Evolution of snow accumulation, distribution by wind‐blown snow, blowing‐snow sublimation, and snow and ice surface melt were simulated by a spatially distributed, physically based, snow‐evolution modelling system (SnowModel) and used as input to MIKE SHE. Discharge simulations were performed for three periods 1997–2001 (calibration period), 2001–2005 (validation period), and 2071–2100 (scenario period). The combination of SnowModel and MIKE SHE shows promising results; the timing and magnitude of simulated discharge were generally in accordance with observations (R2 = 0·58); however, discrepancies between simulated and observed discharge hydrographs do occur (maximum daily difference up to 44·6 m3 s?1 and up to 9% difference between observed and simulated cumulative discharge). The model does not perform well when a sudden outburst of glacial dammed water occurs, like the 2005 extreme flood event. The modelling study showed that soil processes related to yearly change in active layer depth and glacial processes (such as changes in yearly glacier area, seasonal changes in the internal glacier drainage system, and the sudden release of glacial bulk water storage) need to be determined, for example, from field studies and incorporated in the models before basin runoff can be quantified more precisely. The SnowModel and MIKE SHE model only include first‐order effects of climate change. For the period 2071–2100, future IPCC A2 and B2 climate scenarios based on the HIRHAM regional climate model and HadCM3 atmosphere–ocean general circulation model simulations indicated a mean annual Zackenberg runoff about 1·5 orders of magnitude greater (around 650 mmWE year?1) than from today 1997–2005 (around 430 mmWE year?1), mainly based on changes in negative glacier net mass balance. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

7.
There is still wide uncertainty about past flash‐flood processes in mountain regions owing to the lack of systematic databases on former events. This paper presents a methodology to reconstruct peak discharge of flash floods and illustrates a case in an ungauged catchment in the Spanish Central System. The use of dendrogeomorphic evidence (i.e. scars on trees) together with the combined use of a two‐dimensional (2D) numerical hydraulic model and a terrestrial laser scan (TLS) has allowed estimation of peak discharge of a recent flash flood. The size and height distribution of scars observed in the field have been used to define three hypothetical scenarios (Smin or minimum scenario; Smed or medium scenario; and Smax or maximum scenario), thus illustrating the uncertainty involved in peak‐discharge estimation of flash floods in ungauged torrents. All scars analysed with dendrogeomorphic techniques stem from a large flash flood which took place on 17 December 1997. On the basis of the scenarios, peak discharge is estimated to 79 ± 14 m3 s?1. The average deviation obtained between flood stage and expected scar height was ? 0·09 ± 0·53 m. From the data, it becomes obvious that the geomorphic position of trees is the main factor controlling deviation rate. In this sense, scars with minimum deviation were located on trees growing in exposed locations, especially on unruffled bedrock where the model predicts higher specific kinetic energy. The approach used in this study demonstrates the potential of tree‐ring analysis in palaeohydrology and for flood‐risk assessment in catchments with vulnerable goods and infrastructure. Copyright © 2010 John Wiley & Sons, Ltd.  相似文献   

8.
Flooding associated with tropical storms can cause extreme perturbations in riverine and coastal ecosystems. Measuring isotope variability of tropical storm events can help investigate the impacts of flooding. We measured the water isotope composition (δD and δ18O) of rain and associated floodwater collected during two storms and subsequent major and minor flooding events in the subtropical coast of eastern Australia. Compared with baseline regional rainfall isotope values of ?15.0 ± 1.9‰ for δD and ?3.3 ± 0.2‰ for δ18O, floodwater had lower values with ?33.8 ± 2.5‰ δD and ?5.1 ± 0.4‰ δ18O for the major flood and ?29.4 ± 1.0‰ δD and ?4.6 ± 0.1‰ δ18O for the minor flood. The low isotope composition of the floodwater was associated with the transport of large quantities of suspended sediments, with sediment loads 30 to 70 times larger than during base flow conditions. Floods carried up to 35% of the annual phosphorus and up to 208% of the currently calculated average annual nitrogen load of the Brisbane River. The dramatic changes caused by a rapid increase in discharge from 2 to 2015 m3 s?1 over 2 days in the major flood would have major consequences in riverine and coastal ecosystems of the region. These changes could potentially be traced using the isotope composition of the floodwaters. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

9.
Bifurcations are key geomorphological nodes in anabranching and braided fluvial channels, controlling local bed morphology, the routing of sediment and water, and ultimately defining the stability of their associated diffluence–confluence unit. Recently, numerical modelling of bifurcations has focused on the relationship between flow conditions and the partitioning of sediment between the bifurcate channels. Herein, we report on field observations spanning September 2013 to July 2014 of the three‐dimensional flow structure, bed morphological change and partitioning of both flow discharge and suspended sediment through a large diffluence–confluence unit on the Mekong River, Cambodia, across a range of flow stages (from 13 500 to 27 000 m3 s?1). Analysis of discharge and sediment load throughout the diffluence–confluence unit reveals that during the highest flows (Q = 27 000 m3 s?1), the downstream island complex is a net sink of sediment (losing 2600 ± 2000 kg s?1 between the diffluence and confluence), whereas during the rising limb (Q = 19 500 m3 s?1) and falling limb flows (Q = 13 500 m3 s?1) the sediment balance is in quasi‐equilibrium. We show that the discharge asymmetry of the bifurcation varies with discharge and highlight that the influence of upstream curvature‐induced water surface slope and bed morphological change may be first‐order controls on bifurcation configuration. Comparison of our field data to existing bifurcation stability diagrams reveals that during lower (rising and falling limb) flow the bifurcation may be classified as unstable, yet transitions to a stable condition at high flows. However, over the long term (1959–2013) aerial imagery reveals the diffluence–confluence unit to be fairly stable. We propose, therefore, that the long‐term stability of the bifurcation, as well as the larger channel planform and morphology of the diffluence–confluence unit, may be controlled by the dominant sediment transport regime of the system. © 2017 The Authors. Earth Surface Processes and Landforms published by John Wiley & Sons Ltd.  相似文献   

10.
《水文科学杂志》2013,58(4):655-664
Abstract

Palaeohydraulic modelling is presented for Athabasca Vallis, the youngest known catastrophic flood channel on Mars. This modelling incorporates three significant advantages over previous modelling of Martian channels: a step-backwater hydraulic model; more accurate topography; and improved flood height indicators. The maximum modelled palaeodischarge is between 1 × 106 and 2 × 106m3s?1 depending on the friction coefficient selected. An anomalously high palaeostage indicator suggests a region of ponded backwater in the channel in which streamlined forms were created through deposition, with the additional possibility of post-flood subsidence/lowering of the channel slope due to magma extrusion.  相似文献   

11.
Arid regions generally lack surface water records for developing flood characteristics for hydraulic design purposes. Consequently good records of floods, particularly large ones, are a data asset to arid zone hydrology. A large rainfall and runoff event which occurred on 23 April 1985 has been fully recorded on Wadi Ghat, a 597 km2 catchment in southwest Saudi Arabia. Maximum point rainfall intensity was 115.4 mm hr?1. The peak discharge was 3200 m3 s?1. Point rainfall has an expected frequency of occurrence in excess of once every 200 years. The peak discharge is expected to occur on an average once in 143 years.  相似文献   

12.
On 29 August, 2003, an intense convective storm system affected the Fella River basin, in the eastern Italian Alps, producing rainfall peaks of approximately 390 mm in 12 h. The storm triggered an unusually large debris flow in the ungauged Rio Cucco basin (0·65 km2), with a volume of approximately 78 000 m3. The analysis of the time evolution of the rainstorm over the basin has been based on rainfall estimates from radar observations and data recorded by a raingauge network. Detailed geomorphological field surveys, carried out both before and after the flood of August 2003, and the application of a distributed hydrological model have enabled assessment of flood response, estimation of erosion volumes and sediment supply to the channel network. The accounts of two eyewitnesses have provided useful elements for reconstructing the time evolution and the flow processes involved in the event. Liquid peak discharge estimates cluster around 20 m3 s?1 km?2, placing this event on the flood envelope curve for the eastern Italian Alps. The hydrological analysis has shown that the major controls of the flood response were the exceptional cumulated rainfall amount, required to exceed the large initial losses, and the large rainfall intensities at hourly temporal scales, required to generate high flood response at the considered basin scale. Observations on the deposits accumulated on the alluvial fan indicate that, although the dominant flow process was a debris flow, sheetflood also contributed to fan aggradation and fluvial reworking had an important role in winnowing debris‐flow lobes and redistributing sediment on the fan surface. This points out to the large discharge values during the recession phase of the flood, implying an important role for subsurface flow on runoff generation of this extreme flash flood event. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

13.
The influence of sea level variations due to tides and wave setup on turbulent kinetic energy (TKE) was observed at a point source submarine groundwater discharge in a fringing coral reef lagoon. Tidal and wave setup variations modulated speed, TKE, TKE dissipation, and water temperature and salinity at the buoyant jet. The primary driver of jet TKE and speed variations was tides, while wave setup was a minor contributor. An inverse relationship between surface elevation and TKE was explained with an exponential equation based on sea level variations. During low tides, peak jet speeds (up to 0.3 m s?1) and TKE per unit mass (up to 0.4 m2 s?2) were observed. As high tide approached, the jet produced minimum TKE of ~0.003 m2 s?2 and TKE dissipation ranged from 2 to 8×10?4 m2 s?3. This demonstrated the sensitivity of the jet discharge to tides despite the small tidal range (<20 cm). Jet temperatures and salinities displayed semidiurnal oscillations with minimum salinity and temperature values during maximum discharge. Jet salinities increased throughout low tides while temperatures decreased. This pattern suggested the jet conduit was connected to a stratified cavity within the aquifer containing cool fresh water over cool salty water. As low tides progressed, jet outflow increased in salinity because of the mixing within the conduit, while lower jet temperatures suggested water coming from further or deeper in the aquifer. The presence of such a cavity has been recently confirmed by divers.  相似文献   

14.
“The Ekman Drain”: a conduit to the deep ocean for shelf material   总被引:1,自引:1,他引:0  
A long (167 days) acoustic Doppler current profiler time series from the European continental slope west of Scotland has been analysed to investigate the influence of bathymetric steering on the slope current and the extent of down-slope transport in the bottom boundary layer. Within an interior region between the surface and bottom boundary layers, the direction of the flow is found to be remarkably consistent as required by the Taylor-Proudman theorem for geostrophic flow. The mean value of this interior flow direction is taken to be the effective direction of the bathymetry in controlling the geostrophic flow and so defines the rotation of coordinates required to determine along and cross-flow transports. Within a bottom boundary layer (BBL) of thickness ~100 m, the direction of the flow was deflected increasingly to the left with the mean veering angle ~12.5° at 12 mab and a down-slope speed of 2.6 cm s?1. The corresponding integrated transport (the “Ekman drain”) had an average value of ~1.6 m2 s?1 over the full observation period. This down-slope flow was significantly correlated (at 0.1 % level), with the stress applied by the along-slope flow although with considerable scatter (r.m.s. ~1 m2 s?1) which suggests the influence of other forcing mechanisms. Combining the BBL volume transport with an estimate of the mean concentration of suspended particulate material indicates an annual down-slope flux of 3.0?±?0.6 tonnes m?1 year?1, of which ~0.36?±?0.1 tonnes m?1 year?1 is carbon. Biogeochemical measurements indicate that the carbon flux in the Ekman drain predominates over settlement of organic material through the water column over the slope and provides for relatively rapid delivery of material to deep water.  相似文献   

15.
泥沙问题是三峡工程建设与运行中的关键技术问题之一,只有妥善处理好泥沙问题,才能保证三峡工程长期有效使用,维持水库功能的全面发挥。本文首先结合实测水文、河道地形观测资料,对三峡水库运行近20年来的泥沙淤积特性及水库排沙比进行了较为全面的分析研究,并与已有研究成果进行了对比;其次,围绕防洪、航运以及坝前段的泥沙淤积等方面,进一步分析了水库淤积产生的影响。结果表明:三峡水库蓄水以来,在不考虑区间来沙的情况下,三峡水库共淤积泥沙20.484亿t,近似年均淤积1.102亿t,水库排沙比为23.6%,水库年均淤积量为原论证预测值的33%。其中,库区干流段累计淤积泥沙17.835亿m3(变动回水区冲刷0.694亿m3;常年回水区淤积18.529亿m3),淤积在水库防洪库容内的泥沙为1.648亿m3(干、支流分别淤积1.517亿m3和0.131亿m3),占水库防洪库容的0.74%,“十一五”攻关阶段研究得出的多年平均淤积量及排沙比较实测值均偏大,变动回水区冲淤则出现反向的...  相似文献   

16.
Floods have become increasingly important in fluvial export of water, sediment and carbon (C). Using high-frequency sampling, the export of water, sediment and C was examined in the Wuding River catchment on the Chinese Loess Plateau. With groundwater as an important contributor to runoff all year round, floods were relatively less important in the export of water. However, large floods were disproportionately important in exporting sediment and inorganic C (DIC) and organic C (DOC and POC). The three largest floods in each year transported 53.6–97.3 and 41.4–77% of the annual sediment and C fluxes, respectively. An extreme flood in 2017 alone contributed 94.6 and 73.1% of the annual sediment and C fluxes, respectively, in just 7 days, which included 20.3, 92.1 and 35.7% of the annual DOC, POC and DIC fluxes, respectively. A stable carbon isotope (δ13C) analysis of POC indicated that modern soils and C3 plants were its primary source. Furthermore, floods greatly accelerated CO2 degassing due to elevated gas transfer velocity, although stream water CO2 partial pressure (pCO2) exhibited a decreasing trend with flow discharge. Although these results illustrated that increasing runoff diluted pCO2, the timing and magnitude of floods were found to be critical in determining the response of pCO2 to flow dynamics. Low-magnitude floods in the early wet season increased pCO2 because of enhanced organic matter input, while subsequent large floods caused a lower pCO2 due to greatly reduced organic matter supply. Finally, continuous monitoring of a complete flood event showed that the CO2 efflux during the flood (2348 ± 664 mg C m–2 day–1) was three times that under low-flow conditions (808 ± 98 mg C m–2 day–1). Our study suggests that infrequent, heavy storm events, which are predicted to increase under climate change, will greatly alter the transport regimes of sediment and C. © 2020 John Wiley & Sons, Ltd.  相似文献   

17.
In recognition of the non‐linear relationship between storage and discharge existing in most river systems, non‐linear forms of the Muskingum model have been proposed, together with methods to calibrate the model parameters. However, most studies have focused only on routing a typical hypothetical flood hydrograph characterized by a single peak. In this study, we demonstrate that the storage–discharge relationship adopted for the non‐linear Muskingum model is not adequate for routing flood hydrographs in natural channels, which are often characterized by multiple peaks. As an alternative, an evolutionary algorithm‐based modelling approach, i.e. genetic programming (GP), is proposed, which is found to route complex flood hydrographs accurately. The proposed method is applied for constructing a routing model for a channel reach along the Walla Walla River, USA. The GP model performs extremely well with a root‐mean‐square error (RMSE) of 0·73 m3 s?1 as against an RMSE of 3·26 m3 s?1 for routing the multi‐peaked hydrograph. The advantage of GP lies in the fact that, unlike other models, it establishes the routing relationship in an easy and simple mathematical form. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

18.
This paper investigates the impact of a 1000‐year flood in August 2002 on floodplains and valley morphology of an Austrian mixed alluvial bed rock river. Discharges with a recurrence interval between 500 and 2000 years caused distinctive overbank scouring and material deposition in the floodplains. After the 1000‐year flood, those morphologically affected areas were at random intervals documented over the whole longitudinal profile. In addition to overbank erosion in curved sections (cut‐offs), the river bed locally widened, floodplain stripping occurred and local overbank scours were documented along straight parts of the river. A hydrodynamic‐numerical model, combined with field measurements, was used to analyse the cause of these erosional landforms. Based on the modelled hydraulic conditions for a one‐year flood (30–78 ms–1) and the catastrophic 2002 event (700–800 ms–1), the numerical results allowed a cause‐effect study with 19 parameters. Deterministic and statistical analysis (ANOVA, discriminant analysis) showed that the morphodynamic effects of the 2002 flood were influenced by the variability of valley morphology of the Kamp River, which led partially to supercritical flow during flood constriction. These processes were in some cases also anthropogenically influenced. Lateral constriction and expansion of the valley geometry over short distances led to scouring and aggradation within the inundated areas during the event. These morphological features were therefore responsible for the elongated scour holes in the floodplains. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

19.
Sediment loads have been measured in six Swiss mountain torrents over several decades. Most of these torrent catchments are situated in the prealpine belt. They have catchment areas of between 0·5 and 1·7 km2. Bedslopes at the measuring sites vary between 5 and 17 per cent, and peak discharges up to 12 m3 s−1 have been recorded. Geophone sensors installed in the Erlenbach stream allow bedload transport activity to be monitored and sediment volumes associated with each flood event to be determined. A detailed analysis of the measurements in this stream results in an empirical equation in which the sediment load per flood event is expressed as a function of the effective runoff volume (discharges above the threshold for bedload motion) and of the normalized peak discharge. For the total of 143 investigated flood events in the Erlenbach stream, the deviation of the predicted from the measured value is within a factor of two for more than two-thirds of all events. A distinction can be made between summer and winter events in analysing the bedload transport events. The summer events, mainly caused by thunderstorms, transport comparatively larger sediment loads than the winter events. For the other investigated streams, the periods of the deposited sediment volume surveys cover in general several flood events. An analysis is performed analogous to that for the Erlenbach stream. The sediment loads show a similar dependency on the two factors effective runoff volume and normalized peak discharge. However, the exponents of these factors in the power law expressions differ from stream to stream. A comparison of the investigated stream shows that some of the variation can be explained by considering the bedslope above the measuring site. The inclusion of a bedslope factor is in agreement with laboratory investigations on bedload transport. © 1997 John Wiley & Sons, Ltd.  相似文献   

20.
On the evening of the 7 August 1996 an intense storm occurred over the Arás catchment near Biescas in the central Pyrenees. Eighty-seven people were killed as a result of the subsequent flood, which hit a campsite located on the alluvial fan at the outlet of the 18·8 km2 catchment. This paper presents the main results of a hydromorphological study of the event. The Betés subcatchment received the most intense rainfall, estimated at somewhat in excess of 250 mm, which resulted in a peak flow from this tributary of 300 m3 s−1. Just downstream from the Betés river junction, flow in the main channel reached 400 m3 s−1, increasing to around 500 m3 s−1 further downstream. Rainfall in the larger Aso tributary was less intense, and in the head reaches flow remained within-bank, representing a one in two-year return period event. Flow from this tributary did not exceed 100 m3 s−1, indicating that the Betés subcatchment supplied some 75% of the flow from just 28·7% of the catchment area. The extreme flows caused the collapse of a series of sediment trap dams in the Arás channel downstream of the Betés junction. This resulted in the addition of 68 000 m3 of sediment to an already disastrous event. Data from other rain gauges in the area showed both the extremely local nature of the event, and the problems of return period analysis for such storms, whose peaks are rarely observed at gauges. Together with the high geomorphological risks of the zone, this leads to the conclusion that a new method of spatial and temporal risk analysis is required for infrastructure planning. © 1997 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号