首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
The pressure grouting of drilled shaft tips has become popular worldwide due to its effectiveness in mobilizing a larger portion of the available tip resistance under service displacements. This paper presents experimental and numerical studies on the load transfer mechanism and factors controlling the axial response of base grouted drilled shafts in cohesionless soils. The study found that the increased axial capacity of grout-tipped drilled shafts under service loads and displacements depended mainly on preloading effects and the increased tip area provided by the grouting process. A simple prediction approach for estimating the tip capacity of grouted shafts utilizing cone penetration resistance was suggested based on the results of the study. The validity of the proposed approach was verified by the analysis of full-scale case studies of grouted shafts reported in the literature.  相似文献   

2.
Hasan  Md. Rakib  Yu  Xinbao  Abu-Farsakh  Murad 《Acta Geotechnica》2021,16(2):491-506

Load tests of drilled shafts are often performed using Osterberg cell (O-cell) testing, a popular load test method for drilled shafts, which measures both side and tip resistance. However, it is common that only one of the resistance components can be fully mobilized. Therefore, extrapolation of the partially mobilized resistance is often required to determine the total resistance or the equivalent top-down curve. The extrapolation tends to introduce errors to the constructed total resistance values, which subsequently affect the calibrated resistance factors required for the LRFD design of drilled shafts. In this study, eight O-cell tests of drilled shafts with total measured resistances close to the failure criteria defined by FHWA, 5% of the shaft diameter (B), were collected among 64 drilled shaft load tests from Louisiana and Mississippi. For each of the eight cases, extrapolation was performed on both tip and side movement curves for the construction of the equivalent top-down load-settlement (ELT) curves. Data points from the measured side or tip movement curve were removed systematically to create a total of 80 cases with partially mobilized movement curves, and extrapolation exercises were performed on each fabricated case to obtain its equivalent top-down curve. The error of bias for each fabricated case was determined for statistical analyses. Multiple linear regression analysis was performed on the bias errors to model the bias errors caused by extrapolation. Calibrated resistance factors were determined and compared between the original database and fabricated database needing extrapolation. A correction method is proposed, based on a linear regression relationship, to estimate and minimize the extrapolation error of bias for less mobilized databases.

  相似文献   

3.
The load distribution and deformation of rock-socketed drilled shafts subjected to axial loads are evaluated by a load transfer method. The emphasis is on quantifying the effect of coupled soil resistance in rock-socketed drilled shafts using 2D elasto-plastic finite element analysis. Slippage and shear-load transfer behavior at the pile–soil interface are investigated by using a user-subroutine interface model (FRIC). It is shown that the coupled soil resistance acts as pile-toe settlement as the shaft resistance is increased to its ultimate limit state. Based on the results obtained, the coupling effect is closely related to the ratio of the pile diameter to soil modulus (D/Es) and the ratio of total shaft resistance against total applied load (Rs/Q). Through comparison with field case studies, the 2D numerical analysis reasonably estimated load transfer of pile and coupling effect, and thus represents a significant improvement in the prediction of load deflections of drilled shafts.  相似文献   

4.
珊瑚礁灰岩层中桩基承载特性的研究是岩土工程的热点问题。基于某跨海大桥工程开展的珊瑚礁灰岩层中桩端后压浆桩现场静载荷试验,对比分析了压浆前后的实测结果,研究了桩端后压浆的预压作用对桩阻力的影响,并在桩端后压浆试验结果分析的基础上,进一步研究了后压浆桩增强效应作用机制。结果表明,桩端后压浆技术可应用于珊瑚礁灰岩地层中,能有效地提高桩基承载力和减小沉降量;钻孔取芯试验明确了压力浆液在桩端以下一定范围内的分布情况,并证实了压力浆液对珊瑚礁灰岩的孔隙有充填作用;桩端压浆后,在桩端未能消散的压力产生负摩阻力,使负摩阻力在竖向荷载作用下提前发挥,并增大了压浆桩的侧阻力。此外,桩端后压浆的预压作用提高了桩端阻力,并减小了桩端位移,改善了桩基的承载性状。  相似文献   

5.
This paper presents a shear load transfer function and an analytical method for estimating the load transfer characteristics of rock-socketed drilled shafts subjected to axial loads. A shear load transfer (f–w) function of rock-socketed drilled shafts is proposed based on the constant normal stiffness (CNS) direct shear tests. It is presented in terms of the borehole roughness and the geological strength index (GSI) so that the structural discontinuities and the surface conditions of the rock mass can be considered. An analytical method that takes into account the coupled soil resistance effects is proposed using a modified Mindlin’s point load solution. Through comparisons with load test results, the proposed methodology is in good agreement with the general trend observed in in situ measurements and represents an improvement in the prediction of the shear behavior of rock-socketed drilled shafts.  相似文献   

6.
The paper presents a numerical study on the side resistance of a drilled shaft in granular materials. The numerical result is used to develop new design equations for the side resistance of drilled shafts in granular soils. The Discrete Element Method (DEM) is used to model a drilled shaft in granular material. The granular material is represented as assemblies of ellipsoidal particles. Nominal side resistance is represented as the product of a parameter (β) and vertical stress. The numerical result shows that the relationship between β and void ratio can be described by a hyperbolic function for a given vertical stress. DEM result is also compared with three design equations. Although these design equations capture the decrease of β with depth, deviation is observed between the DEM results and the design equations. Finally, new design equations based on state parameter are proposed.  相似文献   

7.
Osterberg-Cell (O-Cell) tests are widely used to predict the load–settlement behavior of large-diameter drilled shafts socketed in rock. The loading direction of O-Cell tests for shaft resistance is opposite to that of conventional downward load tests, meaning that the equivalent top load–settlement curve determined by the summation of the mobilized shaft resistance and end bearing at the same deflection neglects the pile-toe settlement caused by the load transmitted along the pile shaft. The emphasis is on quantifying the effect of coupled shaft resistance, which is closely related to the ratios of pile diameter to soil modulus (D/Es) and total shaft resistance to total applied load (Rs/Q) in rock-socketed drilled shafts, using the coupled load-transfer method. The proposed analytical method, which takes into account the effect of coupled shaft resistance, was developed using a modified Mindlin’s point load solution. Through comparisons with field case studies, it was found that the proposed method reasonably estimated the load-transfer behavior of piles and coupling effects due to the transfer of shaft shear loading. These results represent a significant improvement in the prediction of load–settlement behaviors of drilled shafts subjected to bi-directional loading from the O-Cell test.  相似文献   

8.
Load displacement analysis of drilled shafts can be accomplished by utilizing the “t-z” method, which models soil resistance along the length and tip of the drilled shaft as a series of springs. For non-linear soil springs, the governing differential equation that describes the soil-structure interaction may be discretized into a set of algebraic equations based upon finite difference methods. This system of algebraic equations may be solved to determine the load–displacement behavior of the drilled shaft when subjected to compression or pullout. By combining the finite difference method with Monte Carlo simulation techniques, a probabilistic load–displacement analysis can be conducted. The probabilistic analysis is advantageous compared to standard factor of safety design because uncertainties with the shaft–soil interface and tip properties can be independently quantified. This paper presents a reliability analysis of drilled shaft behavior by combining the finite difference technique for analyzing non-linear load–displacement behavior with Monte Carlo simulation method. As a result we develop probabilistic relationships for drilled shaft design for both total stress (undrained) and effective stress (drained) parameters. The results are presented in the form of factor of safety or resistance factors suitable for serviceability design of drilled shafts.  相似文献   

9.
丁扬  熊晔  陈孜孜  吴晓寒  王小波 《岩土力学》2022,43(Z2):640-646
结合某风洞建设项目现场桩基动力特性试验,采用三维有限差分模拟软件FLAC3D建立双桩模型基础进行计算机仿真,分析结果与试验数据吻合良好,验证了基于桩−土−结构共同作用开展数值模拟求解设备荷载作用下桩基础动力响应方法的合理性。进一步建立灌注桩后注浆模型,探讨采取不同桩侧阻力和桩端阻力增强系数对桩基动力特性的影响。结果表明:灌注桩后注浆对竖向振动的共振频率没有影响,对水平回转振动的共振频率、最大振幅、地基抗剪刚度系数和地基水平转向第1振型阻尼比的影响均很小;灌注桩后注浆能起到提高桩基抗压刚度、减少桩基最大振幅的效果,但相对于未注浆其效果有限。  相似文献   

10.
The drilled shafts have been widely used to support lateral loads (active load case) or as a means to stabilize an unstable slope (passive load case) due to their large lateral load resistance and structural capacity for shear and bending moments. However, there is a need to develop an analytical procedure that can use the actual measured deflection data of a drilled shaft subject to either active or passive load case to interpret the soil‐drilled shaft interaction behavior. The mathematical formulation and the accompanied numerical procedure based on the principle of superposition were developed in this paper to allow for deducing the relevant soil‐drilled shaft interaction behavior under the applied lateral load (i.e. net soil reaction force on the drilled shaft, the shear and bending moment in the shaft) from the measured deflection data. Both compatibility and force equilibrium conditions were utilized in formulating the mathematical equations for common single drilled shaft boundary conditions (free head and fixed bottom). The current application is limited to small deformation to meet the requirement that the drilled shaft responds in a linear elastic range. A total of three theoretical cases, along with two actual field cases, were used to demonstrate the validity of the proposed method and its engineering applications. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

11.
黄土地区后压浆钻孔灌注桩承载力特性试验研究   总被引:2,自引:0,他引:2  
马天抒  龚维明  戴国亮 《岩土力学》2009,30(Z2):362-366
通过对西安地区某工程中采用桩端后压浆的2根钻孔灌注桩压浆前、压浆后单桩竖向静载荷试验和桩身轴力测试的对比,分析了黄土地基中后压浆钻孔灌注桩桩身轴力的传递规律、桩侧阻力及桩端阻力的发挥性状,探讨了后压浆技术对提高黄土地基中钻孔灌注桩承载力的影响  相似文献   

12.
In this paper, a modeling procedure is carried out to numerically analyze the end bearing capacity of drilled shafts in sand. The Mohr–Coulomb elastic plastic constitutive law with stress dependent elastic parameters is used for all numerical analyses performed in this study. The numerical results are compared with the available experimental equations. It is seen that numerical results are in good agreement with experimental equations. The variation of the end bearing capacity of drilled shafts versus embedment depth is also studied. Numerical results show that with increase in pile embedment depth, the end bearing capacity increases. However, the rate of increase becomes smaller as the pile embedment depth increases. Also, numerical analyses show that, for equal settlement, the end bearing decreases with increase in the pile diameter. Finally, a sensitivity analysis is performed to obtain the separate effect of each sand parameter on the end bearing capacity of drilled shafts, and the parameters that are most influential are identified.  相似文献   

13.
Two‐dimensional slope stability analysis for a slope with a row of drilled shafts needs a mechanism to take into account the three‐dimensional effect of the soil arching due to the spaced drilled shafts on slope. To gain a better understanding of the arching mechanisms in a slope with evenly spaced drilled shafts socketed into a stable stratum (or a rock layer), the three‐dimensional finite element modelling technique was used for a comprehensive parametric study, where the nonlinear and plastic nature of the soil and the elastic behavior of the drilled shafts as well as the interface frictions were modelled. Various factors were varied in the parametric study to include (1) the rigidity of the drilled shafts as influenced by its diameter, modulus of elasticity, and total length; (2) shafts spacing and location on the slope; (3) the material properties of rock and the socket length of shaft; and (4) the soil movement and strength parameters. Evidences of soil arching and reduction in the stresses and displacements through the load transfer mechanisms due to the presence of the drilled shafts were elucidated through the finite element method (FEM) simulation results. Design charts based on regression analysis of FEM simulation results were created to obtain a numerical value of the load transfer factor for the arching mechanism provided by the drilled shafts on the slope. Observations of the arching behavior learned from the FEM simulations provide an insight into the behavior of drilled shafts stabilized slope. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

14.
The increase of pile resistance with time is referred to as ‘set-up’. This behaviour of driven piles has been widely discussed in many studies by researchers. Meanwhile, there has been little, if any, information regarding this aspect for drilled shafts. Performing a bearing capacity test for a shaft over time, however, requires higher costs and more complicated rigs compared to a driven pile. A database including results from five Osterberg cell-tested drilled shafts conducted at two different stages is considered, from which the set-up effect is statistically analysed. The reliability-based analysis technique using Monte Carlo simulation (MCS) is used to develop separate resistance factors to account for different degrees of uncertainties associated with the predicted reference resistance and the predicted set-up resistance in the framework of the load and resistance factor design (LRFD) method. By incorporating set-up into design, shaft length or number of shafts can be reduced and economical design of drilled shafts can be achieved.  相似文献   

15.
Drilled shafts are, typically, designed by considering the axial ultimate limit state. In this design methodology, the axial displacement requirements are verified once the design is completed. As an alternative, drilled shafts may be designed by considering the axial service limit state. Service limit state foundation design is more efficient when done using the load and resistance factor design (LRFD) approach. Furthermore, reliability may be rationally incorporated into the design process that utilizes the LRFD method. In this paper, we develop probabilistic approaches for axial service limit state analysis of drilled shafts. The variability of shaft-soil interface properties is modeled by lognormal probability distribution functions. The probability distributions are combined with a closed-form analytical relationship of axial load-displacement curves for drilled shafts. The closed-form analytical relationship is derived based upon the “t–z” approach. This analytical relationship is used with the Monte Carlo simulation method to obtain probabilistic load-displacement curves, which are analyzed to develop methods for determining the probability of drilled shaft failure at the service limit state. The developed method may be utilized to obtain resistance factors that can be applied to LRFD based service limit state design.  相似文献   

16.
17.
The use of drilled shafts to stabilize an unstable slope has been a widely accepted practice. There are two basic design and analysis issues involved: one is to determine the global factor of safety of the drilled shafts stabilized slope and the other one is to determine the design earth thrust on the drilled shafts for structural design of the shafts. In this paper, a limiting equilibrium method of slices based solution for calculating global factor of safety (FS) of a slope with the presence of a row of drilled shafts is developed. The arching mechanisms due to the presence of the drilled shafts on slope were taken into account by a load transfer factor. The method for calculating the net force applied to the drilled shaft from the soil mass was also developed. The interrelationships among the drilled shaft location on the slope, the load transfer factor, and the global FS of the slope/shaft system were derived utilizing the developed numerical closed‐form solution. An illustrative example is presented to elucidate the use of the solution in optimizing the location of the drilled shafts on slope to achieve the desired global factor of safety of the slope/shaft system. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

18.
后压浆钻孔灌注桩的荷载传递机理研究   总被引:37,自引:7,他引:30  
黄生根  张晓炜  曹辉 《岩土力学》2004,25(2):251-254
后压浆技术可大幅提高钻孔灌注桩的承载力,在不同的土层条件下,后压浆的加固机理会表现出不同的形式。软土中长桩承载力的提高主要来源于摩阻力的提高。根据软土中应用后压浆技术的钻孔灌注桩的静载试验及桩身应力测试结果,考虑到土体的连续性引起的变形,对各桩段实测的摩阻力与位移关系进行了修正,并用传递函数对摩阻力与位移关系进行拟合,得出各桩段的摩阻力极限值,从而真实反映出压浆后摩阻力沿桩身的分布规律。  相似文献   

19.
邓玮婷  丁选明  彭宇 《岩土力学》2020,41(8):2814-2820
为研究珊瑚砂地基下膨胀混凝土桩竖向承载特性,开展了室内单桩竖向静载模型试验,分析了膨胀混凝土桩的单桩荷载-位移曲线以及轴力、桩侧摩阻力等沿桩长分布特性,与PLAXIS 3D软件数值模拟结果进行对比并探究了线膨胀率对承载特性的影响。结果表明:珊瑚砂中膨胀混凝土桩的荷载位移曲线呈现缓变型,在加载过程中,荷载主要由桩侧摩阻力承担,轴力随着深度的增加而减小,桩侧摩阻力随深度先增加后逐渐减小,随荷载的增加逐渐发挥作用。随着膨胀剂用量的增加,桩身线膨胀量逐渐增加,桩-土相互作用更加明显。添加25% HCSA型膨胀剂可提高近20%的极限承载力和56%的极限侧阻力,提高桩体线膨胀率可以有效提高桩的极限承载力和侧摩阻力。该研究可为珊瑚砂桩基工程设计提供参考。  相似文献   

20.
在唐山LNG罐区对9根大直径钢筋混凝土灌注桩进行了竖向荷载现场试验,其中桩端后注浆工艺试桩3根,三岔双向挤扩工艺试桩3根,挤扩支盘工艺试桩3根。基于现场静荷载和桩身应力测试结果,分析了3种不同施工工艺钻孔灌注桩竖向荷载传递规律。试验结果表明:3种不同施工工艺的大直径深长钻孔灌注桩试桩荷载-沉降曲线没有明显拐点,后注浆工艺试桩荷载传递过程表现为摩擦桩的特性,桩侧阻力几乎承担全部荷载,而三岔双向挤扩支盘工艺和挤扩支盘工艺试桩荷载传递过程表现为端承摩擦桩的特性,桩端阻力占总荷载的20%~30%;3种不同施工工艺试桩的轴力及桩-土相对位移变化规律基本相似,桩侧桩端阻力非同步发挥且相互影响,桩侧摩阻力均表现出强化现象。对整个罐区要求单桩承载力特征值不小于8 100 kN。3种施工工艺的钻孔灌注桩承载力均能满足要求。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号