首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 46 毫秒
1.
Mine waste debris flows continue to occur in China, and the disaster prevention and mitigation of these flows faces severe challenges since the mechanisms determining erosion and transport of mine waste along gullies are not yet fully understood. The erosion and delivery process of mine waste heaps was reproduced through flume experiments with the method based on field survey data of the Daxicha mine waste debris flow gully in the Xiaoqinling gold mining area. The results showed that the erosion and movement of mine wastes could be divided into three modes: minimal sediment movement, sediment sorting and delivery, and a large amount of sediment transfer. Moreover, there was an obvious amplification effect on peak discharge along with the formation and failure of temporary landslide dams during the erosion process. The correlation between the coefficient of peak discharge amplification and three dimensionless influencing factors, flume gradient, dimensionless volume, and dimensionless particle size, were comprehensively analyzed. An empirical formula for the coefficient of peak discharge amplification was proposed and verified based on 16 sets of experimental data. These preliminary results can provide a scientific reference for future research on disaster prevention and mitigation of mine waste debris flows.  相似文献   

2.
Accurate prediction of the hydrographs of outburst floods induced by landslide dam overtopping failure is necessary for hazard prevention and mitigation. In this study, flume model tests on the breaching of landslide dams were conducted. Unconsolidated soil materials with wide grain size distributions were used to construct the dam. The effects of different upstream inflow discharges and downstream bed soil erosion on the outburst peak discharge were investigated. Experimental results reveal that the whole hydrodynamic process of landslide dam breaching can be divided into three stages as defined by clear inflection points and peak discharges. The larger the inflow discharge, the shorter the time it takes to reach the peak discharge, and the larger the outburst flood peak discharge. The scale of the outburst floods was found to be amplified by the presence of an erodible bed located downstream of the landslide dam. This amplification decreases with the increase of upstream inflow. In addition, the results show that the existence of an erodible bed increases the density of the outburst flow, increasing its probability of transforming from a sediment flow to a debris flow.  相似文献   

3.
《山地科学学报》2020,17(1):156-172
Loose deposits, rainfall and topography are three key factors that triggering debris flows.However, few studies have investigated the effects of loose deposits on the whole debris flow process.On June 28, 2012, a catastrophic debris flow occurred in the Aizi Valley, resulting in 40 deaths.The Aizi Valley is located in the Lower Jinsha River,southwestern Sichuan Province, China. The Aizi Valley debris flow has been selected as a case for addressing loose deposits effects on the whole debris flow process through remote sensing, field investigation and field experiments. Remote sensing interpretation and laboratory experiments were used to obtain the distribution and characteristics of the loose deposits, respectively. A field experiment was conducted to explore the mechanics of slope debris flows, and another field investigation was conducted to obtain the processes of debris flow formation, movement and amplification. The results showed that loose deposits preparation, slope debris flow initiation,gully debris flow confluence and valley debris flow amplification were dominated by the loose deposits.Antecedent droughts and earthquake activities may have increased the potential for loose soil sources in the Aizi Valley, which laid the foundation for debris flow formation. Slope debris flow initiated under rainfall, and the increase in the water content as well as the pore water pressure of the loose deposits were the key factors affecting slope failure. The nine gully debris flows converged in the valley, and the peak discharge was amplified 3.3 times due to a blockage and outburst caused by a large boulder. The results may help in predicting and assessing regional debris flows in dry-hot and seismic-prone areas based on loose deposits, especially considering large boulders.  相似文献   

4.
In the Wenchuan Earthquake area,many co-seismic landslides formed blocking-dams in debris flow channels. This blocking and bursting of landslide dams amplifies the debris flow scale and results in severe catastrophes. The catastrophic debris flow that occurred in Qipan gully(Wenchuan,Southwest China) on July 11,2013 was caused by intense rainfall and upstream cascading bursting of landslide dams. To gain an understanding of the processes of dam bursting and subsequent debris flow scale amplification effect,we attempted to estimate the bursting debris flow peak discharges along the main gully and analyzed the scale amplification process. The results showed that the antecedent and triggering rainfalls for 11 July debris flow event were 88.0 mm and 21.6 mm,respectively. The event highlights the fact that lower rainfall intensity can trigger debris flows after the earthquake. Calculations of the debris flow peak discharge showed that the peak discharges after the dams-bursting were 1.17–1.69 times greater than the upstream peak discharge. The peak discharge at the gully outlet reached 2553 m~3/s which was amplified by 4.76 times in comparison with the initial peak discharge in the upstream. To mitigate debris flow disasters,a new drainage channel with a trapezoidal V-shaped cross section was proposed. The characteristic lengths(h1 and h2) under optimal hydraulic conditions were calculated as 4.50 m and 0.90 m,respectively.  相似文献   

5.
A colluvial landslide in a debris flow valley is a typical phenomena and is easily influenced by rainfall. The direct destructiveness of this kind of landslide is small, however, if failure occurs the resulting blocking of the channel may lead to a series of magnified secondary hazards. For this reason it is important to investigate the potential response of this type of landslide to rainfall. In the present paper, the Goulingping landslide, one of the colluvial landslides in the Goulingping valley in the middle of the Bailong River catchment in Gansu Province, China, was chosen for the study. Electrical Resistivity Tomography (ERT), Terrestrial Laser Scanning (TLS), together with traditional monitoring methods, were used to monitor changes in water content and the deformation of the landslide caused by rainfall. ERT was used to detect changes in soil water content induced by rainfall. The most significant findings were as follows:(1) the water content in the centralupper part (0~41 m) of the landslide was greater than in the central-front part (41~84 m) and (2) there was a relatively high resistivity zone at depth within the sliding zone. The deformation characteristics at the surface of the landslide were monitored by TLS and the results revealed that rainstorms caused three types of deformation and failure: (1) gully erosion at the slope surface; (2) shallow sliding failure; (3) and slope foot erosion. Subsequent monitoring of continuous changes in pore-water pressure, soil pressure and displacement (using traditional methods) indicated that long duration light rainfall (average 2.22 mm/d) caused the entire landslide to enter a state of creeping deformation at the beginning of the rainy season. Shear-induced dilation occurred for the fast sliding (30.09 mm/d) during the critical failure sub-phase (EF). Pore-water pressure in the sliding zone was affected by rainfall. In addition, the sliding L1 parts of the landslide exerted a discontinuous pressure on the L2 part. Through the monitoring and analysis, we conclude that this kind of landslide may have large deformation at the beginning and the late of the rainy season.  相似文献   

6.
Natural dams are formed when landslides are triggered by heavy rainfall during extreme weather events in the mountainous areas of Taiwan.During landslide debris movement, two processes occur simultaneously: the movement of landslide debris from a slope onto the riverbed and the erosion of the debris under the action of high-velocity river flow. When the rate of landslide deposition in a river channel is higher than the rate of landslide debris erosion by the river flow, the landslide forms a natural dam by blocking the river channel. In this study, the effects of the rates of river flow erosion and landslide deposition(termed the erosive capacity and depositional capacity, respectively) on the formation of natural dams are quantified using a physics-based approach and are tested using a scaled physical model.We define a dimensionless velocity index vde as the ratio between the depositional capacity of landslide debris(vd) and the erosive capacity of water flow(ve).The experimental test results show that a landslidedam forms when landslide debris moves at high velocity into a river channel where the river-flow velocity is low, that is, the dimensionless velocity index vde 54. Landslide debris will not have sufficient depositional capacity to block stream flow when the dimensionless velocity index vde 47. The depositional capacity of a landslide can be determined from the slope angle and the friction of the sliding surface, while the erosive capacity of a dam can be determined using river flow velocity and rainfall conditions. The methodology described in this paper was applied to seven landslide dams that formed in Taiwan on 8 August 2009 during Typhoon Morakot,the Tangjiashan landslide dam case, and the YingxiuWolong highway K24 landslide case. The dimensionless velocity index presented in this paper can be used before a rainstorm event occurs to determine if the formation of a landslide dam is possible.  相似文献   

7.
滑坡稳定性评价是滑坡防治中关键问题之一, 滑坡失稳破坏判据研究可为滑坡稳定性评价提供支持。为了提高滑坡稳定性评价的精度, 以滑坡深部位移监测数据为基础的滑坡失稳破坏判据不失为一种有效方法。基于滑坡深部位移监测数据, 引入滑带完整性指标, 推导得到了滑带完整性指标与滑坡抗剪强度参数之间呈正比例关系; 运用滑坡稳定性计算方法和三峡库区堆积层滑坡简化模型, 获得了滑带完整性指标与滑坡的稳定性系数之间呈正比例关系。建立了考虑滑带完整性指标的三峡库区堆积层滑坡失稳破坏判据, 即: 当滑坡滑带土完整性指标大于滑坡滑带土完整性指标的临界值时, 滑坡处于稳定状态; 当滑坡滑带土完整性指标小于滑坡滑带土完整性指标的临界值时, 滑坡发生失稳破坏。以三峡库区典型堆积层滑坡——五尺坝滑坡为例, 通过实例分析发现该判据具备可靠性, 对堆积层滑坡适用性好。研究成果表明, 滑带完整性指标失稳破坏判据可以用于评价滑坡的稳定状态, 为滑坡失稳破坏判据研究提供了一种新思路。   相似文献   

8.
动水驱动型顺层岩质滑坡数量多、灾害频发、危害大, 是滑坡地质灾害领域的研究重点, 但目前对于滑坡启滑机制的认识仍不充分, 滑坡的准确预报还面临巨大挑战。鉴于此, 以含软弱夹层的中倾角顺层岩质滑坡为研究对象, 通过构建理想的单层滑带滑坡物理模型, 开展了一系列动水作用下的滑坡模型试验研究。结果表明, 动水作用下顺层岩质滑坡从开始变形至失稳滑动需经历初始变形、缓慢变形、加速变形和失稳破坏4个阶段, 而各个阶段的演化特征与滑面粗糙度和倾角密切相关。滑面倾角越大或粗糙度越小, 滑坡体从开始变形至失稳滑动所需的时间则越短; 相应地, 坡体加速变形阶段越不明显, 滑坡破坏的突发性越强。滑带内的渗流冲蚀作用会使滑带土中的骨料流失, 导致其抗剪强度降低, 进而引发坡体滑动。与此同时, 上覆坡体的压剪作用以及变形演化过程亦将反过来影响冲蚀强度。基于滑带土黏聚力随水力梯度和冲蚀时间的变化关系, 提出了渗流驱动下滑带土黏聚力演化模型, 可较好地描述滑带土黏聚力的退化过程。滑面粗糙度的存在不仅显著影响了滑带的冲蚀劣化规律, 还改变了滑带不同区域的破坏模式。此外, 通过考虑滑面粗糙度对滑带不同区域破坏模式的影响, 开展了动水多效应关联分析, 建立了滑坡地质体力学分析模型, 实现了动水作用下顺层岩质滑坡动态稳定性的有效评估。本研究成果可为实际动水驱动型顺层岩质滑坡的预测和防治提供理论参考。   相似文献   

9.
On-spot observation and field reconnaissance of debris flows have revealed that inflexion points in the longitudinal profile of a movable channel may easily become unstable points that significantly affect their entrainment behavior. In this study, small-scale flume experiments were performed to investigate the entrainment characteristics of debris flows over two types of inflexion points, namely, a convex point, which has an upslope gradient that is less than the downslope gradient; and a concave point, which has an upslope gradient that is greater than the downslope gradient. It was observed that when debris flowed over a convex point, the entrainment developed gradually and progressively from the convex point in the downstream direction, and the primary control factors were the slope gradient and friction angle. Conversely, when debris flowed over a concave point, the entrainment was characterized by impacting and impinging erosion rather than traditional hydraulic erosion, and the impingement angle of the flow significantly determined the maximum erosion depth and outflow exit angle. An empirical relationship between the topography change and the control factors was obtained from the experimental data.  相似文献   

10.
边坡条分法物理意义是以强度折减表征材料峰值强度的下降程度。以不平衡推力部分强度折减法为例,推广传统假设,应用理想弹塑性模型和全过程剪应力-应变模型,在峰值剪应力和峰值应变相等条件下,模拟边坡的渐进破坏过程;提出了临界状态决定法,随着临界状态逐步移动,边坡不平衡力和驱动力越来越大,抗滑力越来越小,直至整体处于破坏状态。以湖北省恩施州稻池村边坡为例,以3种数值(部分强度折减、理想弹塑性和全过程剪应力-应变本构)模型揭示边坡渐进破坏过程中各参量变化特征。结果表明:3种数值条块法均能描述稻池村边坡渐进破坏过程,基于条分法和理想弹塑性模型部分强度折减系数大于全过程剪应力-应变本构模型稳定系数。   相似文献   

11.
大量穿越山地丘陵区的高压输电线路杆塔基础常位于滑坡灾害高易发斜坡地段, 施加适当防护措施提高其稳定性, 是保障输电线路持续安全运行的关键。为研究不同防护措施对杆塔基础滑坡的防护效果, 以湖北省巴东县燕子滑坡为地质原型, 设计制作物理试验模型, 分别开展了极端降雨条件下滑坡在无防护、施加抗滑桩与格构护坡时的物理模型试验, 从试验角度揭示了滑坡变形破坏特征与不同防护措施的防护效果。试验结果表明: 在2种极端降雨工况(50, 100 mm/h)下, 无防护的滑坡体历经了坡表冲刷、裂缝扩展、局部垮塌变形与整体滑动的演化过程; 抗滑桩措施对滑坡整体的防护效果显著, 滑坡整体处于稳定状态, 杆塔基础变形较小, 杆塔倾斜率满足规范, 但坡表会出现冲刷垮塌现象; 格构护坡措施能有效减少坡面冲刷和坡脚垮塌风险, 但在持续强降雨条件下对杆塔基础的整体稳固作用稍弱。物理模型试验结果与滑坡历史变形和实际治理效果吻合, 试验结论可为类似杆塔基础滑坡的破坏机理研究与防护工程设计提供借鉴。   相似文献   

12.
降雨过程中降雨强度的变化会影响土体渗透率及饱和过程, 从而改变土体的力学性质, 影响泥石流起动模式及破坏规模。为探究不同降雨模式对震后泥石流起动机制的影响, 自制了小比例模型槽, 结合可控雨型的降雨模拟系统, 进行了人工降雨诱发泥石流的室内模型试验; 基于不同降雨模式下泥石流的起动过程分析, 对坡体内部含水率和孔隙水压力的变化规律进行了研究。研究结果表明: 递增型降雨模式下泥石流发生突然, 呈整体滑坡转化为泥石流起动模式, 坡体破坏规模最大; 递减型降雨模式下表现为后退式溃散失稳起动模式; 均匀型降雨模式下则表现为溯源侵蚀起动模式; 中峰型降雨模式下以局部滑坡转化为泥石流起动模式; Ⅴ型降雨模式下则由坡面侵蚀加剧转化为泥石流启动模式, 破坏规模最小。研究结果可以为九寨沟地区泥石流的预报预警提供参考。   相似文献   

13.
Although information regarding the initiation processes of debris flows is important for the development of mitigation measures,field data regarding these processes are scarce.We conducted field observations of debris-flow initiation processes in the upper Ichinosawa catchment of the Ohya landslide,central Japan.On 19 June 2012,our videocamera monitoring systems recorded the moment of debris-flow initiation on channel deposits(nine surges) and talus slopes(eight surges).The initiation mechanisms of these surges were classified into three types by analyzing the video images: erosion by the surface flow,movement of deposits as a mass,and upward development of the fluid area.The first type was associated with the progress of surface flow from the upper stream on unsaturated channel deposits.The second type was likely caused by an increase in the pore water pressure associated with the rising in the groundwater level in channel deposits;a continuous water supply from the upper stream by the surface flow might have induced this saturation.The third type was associated with changes in the downstream topography caused by erosion.The flow velocity of most surges was less than 3 m s~(-1) and they usually stopped within 100 m from the initiation point.Surges with abundant pore fluid had a higher flow velocity(about 3- 5 m s~(-1)) and could travel for alonger duration.Our observations indicate that the surface flow plays an important role in the initiation of debris flows on channel deposits and talus slopes.  相似文献   

14.
The phenomenon of debris flow is intermediate between mass movement and solid transport. Flows can be sudden, severe and destructive. Understanding debris flow erosion processes is the key to providing geomorphic explanations, but progress has been limited because the physical-mechanical properties, movement laws and erosion characteristics are different from those of sediment-laden flow. Using infinite slope theory, this research examines the process and mechanism of downcutting erosion over a moveable bed in a viscous debris flow gully. It focuses specifically on the scour depth and the critical slope for viscous debris flow,and formulas for both calculations are presented.Both scour depth and the critical conditions of downcutting erosion are related to debris flow properties(sand volume concentration and flow depth) and gully properties(longitudinal slope,viscous and internal friction angle of gully materials,and coefficient of kinetic friction). In addition, a series of flume experiments was carried out to characterize the scouring process of debris flows with different properties. The calculated values agreed well with the experimental data. These theoretical formulas are reasonable, and using infinite slope theory to analyze down cutting erosion from viscous debris flow is feasible.  相似文献   

15.
汶川地震触发的最大滑坡——大光包滑坡是受控于斜坡先期层间构造错动带(软弱层)的大型地震滑坡, 该软弱层不但遭受了强烈的历史构造碎裂, 还在地震中产生了大面积新生震裂, 其成因及对大光包滑坡启动的贡献一直是国内外研究焦点。以大光包滑坡为地质原型, 将层间构造错动带概化为含软弱层单元地质体模型, 基于地震波射线理论, 建立了垂直P波入射过程考虑软弱层顶底界面波场转换和时间延迟的动力响应理论模型, 开展了垂直振动作用下含软弱层单元地质体振动台模型试验, 获得了软弱层应力放大特征及受地震强度和频率的影响规律, 揭示振动波在软弱层顶底界面的波场转换和能量分配产生了振幅衰减, 以及因软弱层与上下硬层介质属性差异造成的时间延迟, 共同导致应力分异和叠加, 促使软弱层应力放大; 从而认为, 强震过程中大光包滑坡先期层间构造错动带应力放大导致了带内岩体碎裂, 降低了滑带岩体抗剪强度, 从而促使强震过程中滑坡快速启动。   相似文献   

16.
Dike failure caused by overtopping is likely to result in major casualties and property losses. Aiming at this fact, a series of physical model experiments were conducted on stable thickness of masonry block on the inner slope of the dike. According to the erosion of block embankment with different thicknesses, the relation between the stable thickness of masonry block pitching of the inner slope and the average overtopping discharge is discussed. New equations subject to irregular waves are presented for average overtopping discharge, based upon the analysis of mean overtopping discharge and comparison of present overtopping discharge formulas at domestic and abroad. Finally, a calculation equation of the stable thickness of the dry masonry block stone of inner slope subject to irregular waves is given. In conclusion, the formula matches well with the experiment result, which is capable of functioning as an important reference for structure designs of the dike in China.  相似文献   

17.
In order to calculate the suspended sediment discharge of the flood debris flows into the main river,a small scale flume test was designed to simulate the process of confluence of Jiangjia Ravine and Xiangjiang River in Yunnan province,China.By test observation and data analysis,suspended sediment discharge of Debris flow after its entry into the main river was found to have a close relation with the bulk density,the confluence angle of the Debris flow and the main river,the ratio between per unit width discharge of Debris flow and main river.Based on the measured and simulated results,and statistical analysis,an empirical formula was proposed for the suspended SDR(Sediment Delivery Ratio) of the main river after the confluence of Debris flow.Compared with the observed results of Debris flow in 2009,the error between the data calculated by the empirical formula and the monitored data is only about 10%.  相似文献   

18.
Beam dams are a highly effective and commonly used open-type check dam in debris-flow hazard mitigation. In this study, dimensional analysis was used to obtain empirical equations for quantitatively determining the sediment-trapping and flow-regulating characteristics of a beam dam. To determine the coefficients of the empirical equations, flume experiments were conducted to simulate the trapping and regulating processes. The flow pattern, trapping, and regulating characteristics were investigated when debris flows passed through a beam dam. Debris-flow bulk density and peak discharge, and sediment-trapping ratios, were measured directly and indirectly. The results showed that three blocking actions occurred, and that blockage-breaking considerably influenced the trapping and regulating performance of the beam dam. The relative opening size and the sediment concentration were the two main factors affecting the performance of the beam dam. The ratio of trapping sediment decreased with relative opening, and increased with sediment concentration as well as reducing ratio of bulk density and reducing ratio of peak discharge. The sediment concentration and relative opening were the leading factors influencing the trapping and regulating sediment of a beam dam, followed by flume gradient. The results showed that the calculated values obtained using empirical equations were in good agreement with the values derived from the experiments, and that the deviation was acceptable. Finally, taking Zechawa Gully as an example, using the empirical equations we designed the opening size of a beam dam aimed to trap sediment and regulate peak discharge of debris flow in the main gully.  相似文献   

19.
Field investigations and aerial photography after the earthquake of May 12,2008 show a large number of geo-hazards in the zone of extreme earthquake effects.In particular,landslides and debris flows,the geo-hazards that most threaten post-disaster reconstruction,are widely distributed.We describe the characteristics of these geo-hazards in Beichuan County using high-resolution remote sensing of landslide distribution,and the relationships between the area and volume of landslides and the peak-discharges of debris flows both pre-and post-earthquake.The results show:1) The concentration(defined as the number of landslide sources per unit area:Lc) of earthquaketriggered landslides is inversely correlated with distance from the earthquake(DF) fault.The relationship is described by the following equation:Lc = 3.2264exp(-0.0831DF)(R2 = 0.9246);2) 87 % of the earthquake-triggered landslides were less than 15×104 m2 in area,and these accounted only for 50% of the total area;84% of the landslide volumes were less than 60×104 m3,and these accounted only for 50% of the total volume.The probability densities of the area and volume distributions are correlated:landslide abundance increases with landslide area and volume up to maximum values of 5 × 104 m2 and 30 × 104 m3,respectively,and then decreases exponentially.3) The area(AL) and volume(VL) of earthquake-triggered landslides are correlated as described with the following equation:VL=6.5138AL1.0227(R2 = 0.9131);4) Characteristics of the debris flows changed after the earthquake because of the large amount of landslide material deposited in the gullies.Consequently,debris flow peak-discharge increased following the earthquake as described with the following equation:Vpost = 0.8421Vpre1.0972(R2 = 0.9821)(Vpre is the peak discharge of pre-earthquake flows and the Vpost is the peak discharge of post-earthquake flows).We obtained the distribution of the landslides based on the above analyses,as well as the magnitude of both the landslides and the post-earthquake debris flows.The results can be useful for guiding post-disaster reconstruction and recovery efforts,and for the future mitigation of these geo-hazards.However,the equations presented are not recommended for use in site-specific designs.Rather,we recommend their use for mapping regional seismic landslide hazards or for the preliminary,rapid screening of sites.  相似文献   

20.
动水驱动型滑坡状态识别能更有效地辅助分析滑坡形变规律, 实现滑坡状态的准确识别对深入展开动水驱动型滑坡状态研究具有重要意义。针对目前动水驱动型滑坡突变状态研究较少, 难以获得相关特征, 从而导致状态识别性能不佳的问题, 提出了一种应用于动水驱动型滑坡状态识别的生成对抗网络学习方法。本方法通过构建滑坡状态监测数据矩阵, 依据少量数据样本设计合理的生成器网络完成对滑坡状态的数据扩增并设计判别器网络实现扩增数据的筛选, 通过对抗生成网络实现对滑坡状态的分类, 达到滑坡状态识别的目的。以三峡库区白水河滑坡为研究对象, 将降雨、库水位、深部位移和地表位移等多源监测数据进行了规范化处理, 设计生成器网络和对抗器网络完成了对滑坡状态数据的扩增, 设计滑坡状态识别生成对抗网络完成了对滑坡状态的分类和识别。结果表明, 生成对抗网络对滑坡状态识别具有较高的准确率。研究结果证实本方法能够对目标区域内的动水驱动型滑坡状态进行准确识别和分类, 可直接应用于工程实际。   相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号