首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
桥墩基础冲刷是桥梁毁坏的重要因素,是桥梁基础设计的关键指标之一。目前国内外对于桥墩基础在复杂动力条件下冲刷深度的研究常采用物理模型试验方法,利用正态系列模型方法,在波流水槽中研究了水流、潮流和波流共同作用下青州航道桥索塔基础周围流态变化和局部冲刷特征。研究结果表明,桥墩最大冲刷深度和冲淤范围与水流流速、桥墩轴线与水流夹角和波浪等因素有关;在潮流最大流速和恒定流流速一致情况下,桥墩局部冲刷深度达到平衡后,将会达到与恒定流基本一致的最大冲深;波流共同作用下的最大冲刷深度比恒定流增加10%左右。设计桥墩形状在100年一遇水流和波浪共同作用下桥墩基础局部最大冲刷深度为13.7 m。  相似文献   

2.
Abstract

Because scour is one of the main reasons for bridge failure, this study focuses on accurately predicting the maximum scour depth around different vertical and inclined piers. Scouring is an issue of concern in the bridge design process, as most existing equations for predicting local scour near bridge piers suffer from over- or underprediction issues, resulting in higher foundation costs or bridge failure and inaccurate predictions of the scour around piers. The dimensionless maximum scour depths (ys/D) of vertical and inclined piers were investigated for seven pier shapes with different L/D ratios and four inclination angles (θ) under shallow flow conditions. The inclined pier configuration reduced the ys/D of the piers. The maximum ys/D was observed for a rectangular pier with an L/D of 4.5 in both vertical and inclined configurations (θ of 10, 15 and 21°, respectively). The ys/D was significantly decreased by increasing the angle of the pier from 10 to 30°. The ys/D of the inclined rectangular piers decreased as θ decreased from 30 to 10° and the L/D ratio increased from 1 to 4.5. The best ys/D results were obtained for inclined rectangular piers at a θ value of 30° and an L/D ratio of 7.5 compared to other shapes and inclination angles. New equations were developed to predict the local scour depth for circular, square and rectangular bridge piers. The equations yielded excellent results for predicting the maximum clear water scour depth around vertical and inclined piers with inclination angles of 10, 15, 21 and 30°, respectively.  相似文献   

3.
针对水下桩墩的局部冲刷问题,提出一种适用范围广、防冲促淤效果显著的防护措施。该防护措施把一种相对密度略大于水、几何特征特殊的中性网格结构完全覆盖在冲刷坑或可能出现冲刷坑的床面上,以减弱冲刷坑内水动力,促进泥沙落淤,达到减轻局部冲刷的目的。通过数值模拟和水槽试验探讨了中性网格结构对圆桩周围冲刷坑内水动力及床面形态的影响,并研究了网孔尺寸对防冲促淤效果的影响规律。结果表明:该中性网格结构能显著减小局部冲刷坑内的流速,有效抑制局部冲刷,且对桩前来流来沙的影响微弱。孔径比7.7的网格防护结构可以使无黏性沙床上圆桩的局部冲刷深度减少92%,已存在的冲刷坑则可被修复73%。这些研究成果为桩墩局部冲刷防护提供一种新的思路。  相似文献   

4.
This experimental study presents clear-water scour and deposition patterns around hexagonal arrays of circular cylinders in steady flow conditions. Understanding the scour processes around such configurations could facilitate the design of several hydraulic and marine engineering structures, such as bridge piers and piles. The flow alteration caused by the examined porous obstacles depends on the solid volume fraction of the obstacles and on the angle of attack of the incoming flow, due to the limited number of cylinders constituting the array. Flume experiments with erodible bed were carried out for four array densities (solid volume fractions: 0.14, 0.20, 0.32 and 0.56) under three different orientations (regular, angled and staggered configurations). The scour/deposition characteristics were obtained by means of laser scanner and the results were compared to solid cylinders of equal circumambient diameter. Different angles of attack of the incoming flow lead to different blockage ratios, which have direct impact on the scour characteristics and deposition patterns. The arrays with the higher solid volume fraction generated scour/deposition patterns similar to solid cylinder, while in the arrays with the lower solid volume fractions, local scour around the individual small cylinders became evident. Finally, considering that the load bearing capacity of a pier basically depends on the area of its cross-section, a comparison of the maximum induced scour depth and volume by the cylinder arrays and the solid cylinder with equal solid cross-sectional area is presented, in order to introduce an alternative pier configuration that induces less scour. The results showed that the array of cylinders could generate 27% less scour volume and 22% less scour depth compared to its single solid cylinder counterpart.  相似文献   

5.
6.
针对我国南海某岛礁珊瑚砂地基上的圆形桩基础,采用N-S方程k-ε模型、双向耦合方式跟踪流场中颗粒运动轨迹的方法,对桩周珊瑚砂的冲刷规律进行了求解,分析了桩体周围流体的速度场以及桩体表面剪应力场的分布规律,同时对桩周珊瑚砂冲刷坑的形成过程进行了模拟。计算结果表明,在桩体周围形成的马蹄形漩涡和桩柱后方的尾涡作用下,桩周土体出现了较为明显的冲刷现象,涡旋的释放显著地影响着珊瑚砂地基上桩基的冲刷坑形状;而且,由于珊瑚砂颗粒密度较石英砂小,水动力作用下桩周冲刷坑更容易形成,所以实际工程中需要考虑有效的防护措施。  相似文献   

7.
Experimental Study on Local Scour Around Bridge Piers in Tidal Current   总被引:7,自引:1,他引:7  
Local scour around a bridge pier is an important pm‘mneter for the design of a bridge. Compared with the local scour in a mono-directional current, the local scour in a tidal current has its unique characteristics. In this paper, several aspects of local scour around bridge piers in tidal current, including the scour development process, the plane form of a scour hole and the maximum scour depth, are studied through movable bed flume experiments.  相似文献   

8.
1 .IntroductionWiththedevelopmentofexploitationofmarineresources ,theconstructionofoffshorestructuresdevelopsrapidly ,suchasmarineoilplatforms ,deep waterbreakwaters ,marinebridges ,largehar bors,etc .Thesestructureswillchangesurroundingwaveandcurrentconditionsandleadtolocalscourofseabed ,resultinginstructuraldamage .Therefore ,localscouraroundmarinestructuresaswellastheirprotectionhasdrawnmuchattentionfromrelativeengineeringfields .Manyscholarshaveconduct edtheoreticalanalysisandexperimentals…  相似文献   

9.
Bridge scour is recognized as one of the key factors that causes structure failures, which in turn leads to economic and life loss. In this study, flume tests of four typical arrangements of pier groups embedded in sand under steady clear water conditions were carried out to observe the process and maximum depth around piles of scour. The investigation included single pile, tandem piles, side-by-side piles, and 3 × 3 pile groups. Different conditions including different pile spacing, flow velocity, and water depth are considered. Moreover, the evaluation of design methods from the United States, New Zealand, and China was analyzed and compared through experimental and mathematical methods. The experimental results show that shielding and jetting effects are obvious in pile groups, which become less obvious with the increase of pile spacing. The dynamic process of scour around single pile and pile groups are quite different. Meanwhile, most of the predicted scour depths by these equations tend to be much larger than those from field data, which may lead to overdesign and consequently high construction cost. In addition, data from this study and some laboratory experiment data from previous work were used to derive the correction factors of a new scour prediction equation, which can be used to estimate the scour in a sand bed and agree well with the observations.  相似文献   

10.
Abstract

Sediment has a severe effect on bridge stability, and time-domain reflectometry (TDR) is a suitable method for assessing scour depth. This paper presents a fundamental study to demonstrate the suitability of a circular TDR system to enhance the resolution when monitoring scour depth with consideration of detailed local changes over a wide area around piers. A total of 32 electrodes are vertically installed on a cylinder pier around the circumference at ~7.36?mm intervals. Scour depth is investigated through small-scale laboratory experiments, where a measured waveform reflects the artificially constructed scour depth with high resolution (≈5?mm). Different scour types including circular, mushroom, elliptical, and irregular shapes are developed to verify the application of circular TDR, and shapes are predicted through the detailed local distribution. The influences of the reflected waveform according to water level change, temperature variation, and salinity effect are investigated as additional considerations, and the relative deviation of scour depth is analyzed. This study demonstrates that the proposed circular TDR system achieves better resolution than existing single TDR systems and may provide a better alternative technique for monitoring scour depth.  相似文献   

11.
The local scour around a new pile-group foundation of offshore wind turbine subjected to a bi-directional current was physically modeled with a bi-directional flow flume. In a series of experiments, the flow velocity and topography of the seabed were measured based on a system composed of plane positioning equipment and an ADV. Experimental results indicate that the development of the scour hole was fast at the beginning, but then the scour rate decreased until reaching equilibrium. Erosion would occur around each pile of the foundation. In most cases, the scour pits were connected in pairs and the outside widths of the scour holes were larger than the inner widths. The maximum scour depth occurred at the side pile of the foundation for each test. In addition, a preliminary investigation shows that the larger the flow velocity, the larger the scour hole dimensions but the shorter equilibrium time. The field maximum scour depth around the foundation was obtained based on the physical experiments with the geometric length scales of 1:27.0, 1:42.5 and 1:68.0, and it agrees with the scour depth estimated by the HEC-18 equation.  相似文献   

12.
基于Flow-3D软件,建立抗拖网海床基沙土基床冲刷的三维数学模型,控制水流流速和泥沙粒径,对不同条件下抗拖网海床基周围沙土基床的冲刷进行数值模拟,并分析了抗拖网海床基最大冲刷深度随这两种因素改变的趋势。结果表明,抗拖网海床基沙土基床冲刷坑深度随海流流速增大而增加,在设定其他条件不改变的情况下,冲刷坑的加深速度随着流速增大会逐渐减缓,最终达到冲淤平衡。同时,由于海底环境复杂多变,导致模型与实际情况有一定的差异,还需在后续的研究中进一步进行优化。  相似文献   

13.
1 IntroductionSubmarine pipelines are important ocean engi-neeringequipm ents, especiallyfortheoiland gasin-dustries. M anyresearchershavebeendedicatedtotheproblem of local scour around the submarinepipelines, butmostoftheirwork arelaboratory testsand foc…  相似文献   

14.
海上风电基础局部冲刷会影响风电结构的稳定,对海上风电的安全运行至关重要。以四腿群桩导管架基础为研究对象,对潮流条件下基础局部冲刷开展试验研究。试验结果表明:0°水流条件下,最大冲刷深度为1.05倍桩径;45°水流条件下,最大冲刷深度为0.97倍桩径。并探索了新型蜂巢结构在群桩基础防冲刷中的应用,设计了蜂巢格室防护方案,发现在蜂巢防护情况下,两个流向作用于四腿群桩基础时最大冲刷深度仅为无防护情况下的27.3%和25.9%,表明蜂巢格室在海上风电基础的冲刷防护方面具有良好效果,在实际工程中具有较大的应用潜力。  相似文献   

15.
Existence of debris structures inevitably ascends the rate of scour process around bridge piers and flow area not only lead into remarkable deviation of flow but also increase the velocity around bridge piers. A myriad of experimental and field studies to understand effective parameters on the scour depth with debris effects were conducted. To reach permissible values of the scour depth for the practical uses, relationships extracted in previous investigations suffer from lack of generalization for experimental data ranges. In this way, neuro-fuzzy group method of data handling (NF-GMDH)-based self-organized models is applied to evaluate the pier scour depth. In this study, NF-GMDH network is implemented using evolutionary algorithms listed particle swarm optimization (PSO), gravitational search algorithm (GSA), and genetic algorithm (GA). In all, 243 experimental datasets including a wide range of input and output parameters to develop the proposed models were compiled from various literature. The efficiency of NF-GMDH networks for training and testing stages was perused. NF-GMDH-PSO model provided the scour depth with more precise predictions (root mean squared error (RMSE)?=?0.388 and scatter index (SI)?=?0.343) in comparison with NF-GMDH-GA (RMSE?=?0.402 and SI?=?0.361) and NF-GMDH-GSA (RMSE?=?0.456 and SI?=?0.407) networks. In addition, blockage ratio (ΔA) was taken into account as the most sumptuous parameter with utmost level of effectiveness using the sensitivity analysis.  相似文献   

16.
《Coastal Engineering》2001,44(2):153-190
This paper summarizes the results of the European Union Marine Science and Technology (EU MAST) III project “Scour Around Coastal Structures” (SCARCOST). The summary is presented under three headings: (1) Introduction; (2) Flow and scour processes with the subheadings: flow and scour processes around vertical cylinders; flow and scour processes at detached breakwaters; flow and scour processes at submerged breakwaters; and the effect of turbulence on sediment transport; and (3) Sediment behaviour close to the structure with the subheadings: field measurement and analysis of wave-induced pore pressures and effective stresses around a bottom seated cylinder; non-linear soil modelling with respect to wave-induced pore pressures and gradients; wave-induced pressures on the bottom for non-linear coastal waves, including also wave kinematics; development of a numerical model (linear soil modelling) to calculate wave-induced pore pressures—the effect of liquefaction on sediment transport; penetration of blocks in non-consolidated fine soil; and cyclic stiffness of loose sand.The paper also includes a discussion of the role of scale effects in laboratory testing and the applicability of the results obtained in supporting engineering design.  相似文献   

17.
The present paper was aimed at presenting the time-averaged velocity and turbulence intensity at the initial plane from a ship's propeller. The flow characteristics of a ship's propeller jet are of particular interest for the researchers investigating the jet induced seabed damage as documented in the previous studies. Laser Doppler Anemometry (LDA) measurements show that the axial component of velocity is the main contributor to the velocity magnitude at the initial plane of a ship's propeller jet. The tangential component contributes to the rotation while the radial component which contributes to the diffusion, are the second and third largest contributors to the velocity magnitude. The maximum tangential and radial velocity components at the initial plane are approximately 82% and 14% of the maximum axial velocity component, respectively. The axial velocity distribution at the initial plane shows two peaked ridges with a low velocity core at the rotation axis. The turbulence intensity distribution shows a three-peaked profile at the initial plane.  相似文献   

18.
强潮流作用下桥墩不对称“双肾型”冲刷地貌特征与机理   总被引:1,自引:0,他引:1  
本文在海图地形资料分析桥轴线附近的海床自然冲刷的基础上,利用多波束测深技术研究大桥主墩附近局部冲刷地形。结果表明,该大桥桥位附近地形冲刷较显著,且大桥主墩位置有持续冲刷的趋势;主墩上、下游群桩最大冲刷深度呈上游最深、中部淤积、下游渐深的不对称形态,最大局部冲刷深度为4 m;桥墩整体冲刷坑形态呈南北“双肾型”;潮流流向与桥墩迎流面存在偏南的入射角,使得各桥墩南侧的最大冲深和冲刷范围均大于北侧。  相似文献   

19.
The reliable estimation of the local scour depth at a bridge pier is essential for proper design and maintenance of bridge piers. Most local scour formulae have been developed based on the results of laboratory experiments. The formulae based on laboratory data do not often produce reasonable predictions for field piers because laboratory investigations are apt to oversimplify or ignore many of the complexities of the flow fields around the bridge piers. Validation of the formulae is necessary in order to ascertain which of the formulae are able to provide reasonable estimates of the local scour depth. In this study, six commonly cited formulae based on laboratory data or field data were selected for validation using 180 laboratory data sets gathered from the literature and 446 field data sets collected from four countries. The six formulae validated in this paper are the Colorado State University (CSU), Neill, Froehlich, Breuser, Laursen, and simplified Chinese formulae. Comparisons between the predicted and measured depths were performed using scour from the laboratory and field data. An artificial neural network technique was also applied in order to compare the tendencies between the field and laboratory data sets.  相似文献   

20.
This study presents new application of group method of data handling (GMDH) to predict scour depth around a vertical pier in cohesive soils. Quadratic polynomial was used to develop GMDH network. Back propagation algorithm has been utilized to adjust weighting coefficients of GMDH polynomial thorough trial and error method. Parameters such as initial water content, shear strength, compaction of cohesive bed materials, clay content of cohesive soils, and flow conditions are main factors affecting cohesive scour. Performances of the GMDH network were compared with those obtained using several traditional equations. The results indicated that the proposed GMDH-BP has produced quite better scour depth prediction than those obtained using traditional equations. To assign the most significant parameter on scour process in cohesive soils, sensitivity analysis was performed for the GMDH-BP network and the results showed that clay percentage was the most effective parameter on scour depth. The error parameter for three classes of IWC and Cp showed that the GMDH-BP model yielded better scour prediction in ranges of IWC = 36.3–42.28% and Cp = 35–100%. In particular application, the GMDH network was proved very successful compared to traditional equations. The GMDH network was presented as a new soft computing technique for the scour depth prediction around bridge pier in cohesive bed materials.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号