首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
In the blasting operation, risk of facing with undesirable environmental phenomena such as ground vibration, air blast, and flyrock is very high. Blasting pattern should properly be designed to achieve better fragmentation to guarantee the successfulness of the process. A good fragmentation means that the explosive energy has been applied in a right direction. However, many studies indicate that only 20–30 % of the available energy is actually utilized for rock fragmentation. Involvement of various effective parameters has made the problem complicated, advocating application of new approaches such as artificial intelligence-based techniques. In this paper, artificial neural network (ANN) method is used to predict rock fragmentation in the blasting operation of the Sungun copper mine, Iran. The predictive model is developed using eight and three input and output parameters, respectively. Trying various types of the networks, it was found that a trained model with back-propagation algorithm having architecture 8-15-8-3 is the optimum network. Also, performance comparison of the ANN modeling with that of the statistical method was confirmed robustness of the neural networks to predict rock fragmentation in the blasting operation. Finally, sensitivity analysis showed that the most influential parameters on fragmentation are powder factor, burden, and bench height.  相似文献   

2.
Except for very deep-seated deposits, open cast mining method has been recognized as the safest and most productive mode for mining minerals. Ever growing demand in minerals and coal has compelled the mine operators to increase the size of mine, which has resulted in an increasing trend towards large capacity open cast projects. Explosives and blasting techniques play a significant role in efficient opencast mining operations. There have been constant technological developments towards safer, faster, economical and more efficient blasting systems. Further, globally increased competitiveness has necessitated to carryout blasts in such a way that the desired degree of fragmentation is achieved in the primary blast, with minimum undesired side effects such as ground vibration, air blast/noise, flyrock, generation of oversize boulders, formation of toe, and over break or back break. Hence, the ultimate objective of the blasting engineer is to ensure that the blasts are carried out in an eco-friendly manner. This paper presents a case study of limestone mine where a controlled blasting was conducted near a green structure of wagon tippler (at 2 m) being constructed for foundation work of belt conveyor as the mine management wants to double the existing production. This paper deals with controlled blast design and its implementation using electronic detonators with signature hole technique.  相似文献   

3.
The influence of air deck blasting on blast performance and blast economics and its feasibility has been studied in the production blasting of soft and medium strength sandstone overburden rocks in an open pit coal mine in India. The air deck blasting technique was very effective in soft and medium strength rocks. Its main effects resulted in reducing fines, in producing more uniform fragmentation and in improving blast economics. The fines were reduced by 60–70% in homogeneous sandstones. Oversize boulders were reduced by 80% and shovel loading efficiency was improved by 20–40% in blocky sandstones. The explosive cost was reduced by 10–35% dependent on the type of rock mass. Throw, backbreak and ground vibration were reduced by 10–35%, 50–80% and 30–94% respectively. For a particular rock mass and blast design environment, air deck length (ADL) significantly influenced the fragmentation. ADL as represented by air deck factor (ADF) in the range of 0.10–0.35 times the original charge length (OCL) produced optimum results. ADF beyond 0.35 resulted in poor fragmentation and in inadequate burden movement.  相似文献   

4.
Flyrock is one of the most hazardous events in blasting operation of surface mines. There are several empirical methods to predict flyrock. Low performance of such models is due to complexity of flyrock analysis. Existence of various effective parameters and their unknown relationships are the main reasons for inaccuracy of the empirical models. Presently, application of new approaches such as artificial intelligence is highly recommended. In this paper, an attempt has been made to predict and control flyrock in blasting operation of Sangan iron mine, Iran incorporating rock properties and blast design parameters using artificial neural network (ANN) method. A three-layer feedforward back-propagation neural network having 13 hidden neurons with nine input parameters and one output parameter were trained using 192 experimental blast datasets. It was also observed that in ascending order, blastability index, charge per delay, hole diameter, stemming length, powder factor are the most effective parameters on the flyrock. Reducing charge per delay caused significant reduction in the flyrock from 165 to 25 m in the Sangan iron mine.  相似文献   

5.
The main objective in production blasting is to achieve a proper fragmentation. In this paper, rock fragmentation the Sarcheshmeh copper mine has been predicted by developing a model using artificial neural network. To construct the model, parameters such as burden to spacing ratio, hole-diameter, stemming, total charge-per-delay and point load index have been considered as input parameters. A model with architecture 9-8-5-1 trained by back propagation method was found to be optimum. To compare performance of the neural network, statistical method was also applied. Determination coefficient (R 2) and root mean square error were calculated for both the models, which show absolute superiority of neural network over traditional statistical method.  相似文献   

6.
Backbreak is one of the destructive side effects of the blasting operation. Reducing of this event is very important for economic of a mining project. Involvement of various parameters has made the backbreak analyzing difficult. Currently there is no any specific method to predict or control the phenomenon considering all the effective parameters. In this paper, artificial neural network (ANN) as a powerful tool for solving such complicated problems is used to predict backbreak in blasting operation of the Sangan iron mine, Iran. Network training was fulfilled using a collected database of the practiced operation including blast design details and rock condition. Trying various types of the networks, a network with two hidden layers was found to be optimum. Performance of the ANN model was compared with statistical analysis using datasets which were kept apart from the original database. According to the obtained results, for the ANN model there existed a higher correlation (R2 = 0.868) and lesser error (RMSE = 0.495) between the predicted and measured backbreak as compared to the regression model. Also, sensitivity analysis revealed that the inputs rock factor and number of rows are the most and the least sensitive parameters on the output backbreak, respectively.  相似文献   

7.
龚敏  文斌  王德胜 《岩土力学》2012,33(6):1822-1828
穿层抽放是一些高突矿井常用的瓦斯治理手段,在穿层抽放时采用爆破技术已被证明具有良好的抽放效果。以重庆市南桐矿穿层爆破为背景,建立了穿层深孔爆破数学模型;利用数值计算和现场实测抽放数据相结合的方法,分别研究了各爆破孔、控制孔动应力的变化以及爆破应力场强度与抽放效果的关系。研究结果表明,穿层抽放的特点决定了爆破孔与抽放孔的布孔方式。由于炮孔斜穿煤层,煤层各断面动应力场分布极不均匀,药包中心控制孔所受动应力为控制孔中最大。在南桐矿薄煤层试验条件下,药包长度为3.2 m的爆破孔平均破坏半径为0.57 m,较其他两排炮孔大20%以上。炮孔中药包长度是影响瓦斯抽放量的重要因素。爆破孔的平均单孔抽放量较控制孔高55%,爆破钻场较非爆破钻场平均单孔流量大49%。  相似文献   

8.
Excavation of coal, overburden, and mineral deposits by blasting is dominant over the globe to date, although there are certain undesirable effects of blasting which need to be controlled. Blast-induced vibration is one of the major concerns for blast designers as it may lead to structural damage. The empirical method for prediction of blast-induced vibration has been adopted by many researchers in the form of predictor equations. Predictor equations are site specific and indirectly related to physicomechanical and geological properties of rock mass as blast-induced ground vibration is a function of various controllable and uncontrollable parameters. Rock parameters for blasting face and propagation media for blast vibration waves are uncontrollable parameters, whereas blast design parameters like hole diameter, hole depth, column length of explosive charge, total number of blast holes, burden, spacing, explosive charge per delay, total explosive charge in a blasting round, and initiation system are controllable parameters. Optimization of blast design parameters is based on site condition and availability of equipment. Most of the smaller mines have predesigned blasting parameters except explosive charge per delay, total explosive charge, and distance of blast face from surface structures. However, larger opencast mines have variations in blast design parameters for different benches based on strata condition: Multivariate predictor equation is necessary in such case. This paper deals with a case study to establish multivariate predictor equation for Moher and Moher Amlohri Extension opencast mine of India. The multivariate statistical regression approach to establish linear and logarithmic scale relation between variables to predict peak particle velocity (PPV) has been used for this purpose. Blast design has been proposed based on established multivariate regression equation to optimize blast design parameters keeping PPV within legislative limits.  相似文献   

9.
The purpose of this article is to evaluate and predict the blast induced ground vibration using different conventional vibration predictors and artificial neural network (ANN) at a surface coal mine of India. Ground Vibration is a seismic wave that spread out from the blast hole when detonated in a confined manner. 128 blast vibrations were recorded and monitored in and around the surface coal mine at different strategic and vulnerable locations. Among these, 103 blast vibrations data sets were used for the training of the ANN network as well as to determine site constants of various conventional vibration predictors, whereas rest 25 blast vibration data sets were used for the validation and comparison by ANN and empirical formulas. Two types of ANN model based on two parameters (maximum charge per delay and distance between blast face to monitoring point) and multiple parameters (burden, spacing, charge length, maximum charge per delay and distance between blast face to monitoring point) were used in the present study to predict the peak particle velocity. Finally, it is found that the ANN model based on multiple input parameters have better prediction capability over two input parameters ANN model and conventional vibration predictors.  相似文献   

10.
In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting is an important step in this process chain and it's results such as fragmentation, muckpile shape and looseness, dilution, damage and rock softening effect the efficiency of downstream processes. The value created per ton of broken ore is the difference between the price it commands when sold as the final product and the cost to produce it. Traditionally, the total process in the mining industry is classified into two groups as mining and milling. These are managed as separate cost centres inspite of the interdependency. Each process has a budget and production target and emphasis is usually on maximising production (tons) and minimising cost rather than the overall profitability of the whole business unit. The efficiency of each process is considered to be satisfactory as long as they are within budget and meet the production targets. The mine and mill managers usually try to optimise each process independently rather than the entire process. This paper discusses the potential pitfalls of decreasing the drilling and blasting cost per ton of broken rock without considering its impact on downstream processes. It introduces a holistic approach to blast optimisation by identifying and measuring the leverage that blast results have on different downstream processes and then optimising the blast design to achieve the results that maximise the overall profitability rather than just minimising the drilling and blasting costs. This paper demonstrates the benefits of such a holistic approach to blasting based on computer model simulations and field studies from metal and open cut coal mining.  相似文献   

11.
In blasting with air decks, repeated oscillation of shock waves within the air gap increases the time over which it acts on the surrounding rock mass by a factor at between 2 and 5. The ultimate effect lies in increasing the crack network in the surrounding rock and reducing the burden movement. Trials of air deck blasting in the structurally unfavourable footwall side of an open pit manganese mine has resulted in substantial improvements in fragmentation and blast economics. Better fragmentation resulted in improved shovel loading efficiency by 50–60%. Secondary blasting was almost eliminated. Use of ANFO explosive with this technique reduced explosive cost by 31.6%. Other benefits included reductions in overbreak, throw and ground vibration of the order of 60–70, 65–85 and 44% respectively. This paper reviews the theory of air deck blasting and describes in detail the air deck blast trials conducted in a manganese open pit mine in India. The blast performance data have been analysed to evaluate the benefits of air decking over conventional blasting.  相似文献   

12.
A programme of blast improvement was initiated at the Mt Whaleback iron ore mine by BHPIO management in early-1998. One component of that work was the need to improve wall control blasting practices to better achieve the designed pit slope elements. This paper describes the geological conditions in which pit walls are developed, the mine operating equipment, the blast design concepts applied to minimise blast damage, the techniques applied in an assessment of the blast performance and the operational procedures developed to ensure that the blast concepts are effectively implemented in the production environment. Substantial changes have been implemented in both technical and operational aspects of the mining operation in order to achieve the improvements in pit wall condition, in particular recognising the need for a more flexible approach to limits blasting in response to highly variable and complex geology. The benefits to the mine are not only an improved wall condition, but increased confidence on the part of mine management that mine plans may be implemented on design and on schedule.  相似文献   

13.
Wall control blasting practices arc necessary to reduce the impact of blasting on mine faces but can also have a significant negative impact on mine productivity and operating costs. The conventional practice in deep open pit mines is to use so-called trim blasts adjacent to pit walls. To provide burden relief these trim blasts have fewer rows than full production blasts and are fired to a cleared free-face: hence they are termed 'unchoked.' This practice leads to scheduling constraints on the pit operations and can cause ore dilution due to excessive muckpile movement. The use of such trim blasts stems from the perception that increased wall damage results from 'choked' blasts. These concerns are based on the unproven assumptions that blast vibration levels and explosive gas penetration increase with increased blast burden and face confinement. This paper describes work undertaken as part of a major investigation into wall control blasting at the KCGM Fimiston Mine, Kalgoorlie, Western Australia. It details a study to assess damage effects due to blast burden. Borehole air pressure measurements and borehole video camera inspections owere done behind a series of single blastholes drilled owith varying burden distances, as owell as behind a dedicated trim blast and a full production blast. It was found that the measured damage effects, including visible rock cracking, dilation, and the limited extent of gas penetration behind the blastholes, did not vary significantly with burden or blast type for the cases tested. This result was in complete agreement with detailed vibration measurements conducted by Blair and Armstrong [1] during the study, which found that vibration was independent of blast burden. As a result of these investigations, changes to the blasting practices at the mine were implemented. Dedicated trim blasts and free-face blasting have been replaced by modified production blasts and the practice of 'choking' blasts has been introduced. This has resulted in a significant improvement in productivity and cost savings without compromising pit wall integrity.  相似文献   

14.
北京西山地区地应力场特征及地质灾害关系研究   总被引:1,自引:2,他引:1  
本文研究了北京西山地区现今构造应力场及因煤矿开采引起的岩爆和地面塌限两类地质灾害的特征。发现岩爆及地面塌陷严重的矿均处于高应力值区及拉应力区。认为岩爆和地面塌陷的生成条件和影响因素不尽相同,但它们都是因煤矿开采,围岩体应力平衡状态受到破坏而引起的。  相似文献   

15.
Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold Mines' Eldridge Pit. Until trials began in 1999 most final wall designs utilised large diameter blastholes up to the presplit row to achieve the wall angle. The berm crests were being lost, wall support requirements were increasing and affecting mining schedules and several fault areas were putting pit access at risk. Standard designs had been determined during the early mining years and while periodic modifications had been made there was a need for major blast pattern revision. This paper traces the development of wall control blasting programs over the years, relating designs to the geology and the evidence in the walls with the theories of the day and includes the recent trials that were conducted in what is a most unforgiving geology. Trials and improvements to ensure the walls were safe were conducted even as the mine neared its economic life. Instrumented monitoring of trials blasts has greatly increased the understanding of the damage criteria and enabled rapid revision of designs. Recent changes included reduction in presplit energy, charge redistribution and use of smaller blastholes for the trim patterns. Determination of a minimum proximity-to-final wall limit for production blastholes, establishment of the correct standoff to berm crests and walls and selective use of presplitting techniques for protecting crests have resulted in cost effectiveness, improved bench crest retention and an overall reduction in visible wall damage.  相似文献   

16.
Investigating the propagation and attenuation of blast vibration in rock slopes is the key point to assess the influence of underground mine blasting on overlaying open pit slopes stability and determining the potential risk. In this paper, Daye Iron Mine in China has been chosen as the case to study the effect of blast vibrations on overlaying open pit slopes due to underground mine blast. Firstly, the characteristics of blast loadings are analyzed by the dynamic finite element method. Then, a three dimensional (3D) numerical model of the open pit and the underground mine is made, which is verified by the field monitoring data to prove its reliability. The effect of blast vibration on overlaying open pit slope due to underground mine blasting are discussed based on the peak particle velocity (PPV) and the peak effective tensile stress (PETS) distribution characteristics which are calculated and analyzed by inputting the obtained blast vibration data into the numerical model. The results show that the effect of present mining blasting on the stability of pit slopes are limited because the simulated maximum PPV and PETS of monitoring point on slopes are all < 0.747 cm/s and 0.738 MPa. At last, according to numerical simulations of the underground mine blasting, the PPV predicting formulas for the slopes in Daye Open Pit Iron Mine is proposed based on the classic Sadaovsk formula.  相似文献   

17.
New Prediction Models for Mean Particle Size in Rock Blast Fragmentation   总被引:2,自引:1,他引:1  
The paper refers the reader to a blast data base developed in a previous study. The data base consists of blast design parameters, explosive parameters, modulus of elasticity and in situ block size. A hierarchical cluster analysis was used to separate the blast data into two different groups of similarity based on the intact rock stiffness. The group memberships were confirmed by the discriminant analysis. A part of this blast data was used to train a single-hidden layer back propagation neural network model to predict mean particle size resulting from blast fragmentation for each of the obtained similarity groups. The mean particle size was considered to be a function of seven independent parameters. An extensive analysis was performed to estimate the optimum value for the number of units for the hidden layer for each of the obtained similarity groups. The blast data that were not used for training were used to validate the trained neural network models. For the same two similarity groups, multivariate regression models were also developed to predict mean particle size. Capability of the developed neural network models as well as multivariate regression models was determined by comparing predictions with measured mean particle size values and predictions based on one of the most applied fragmentation prediction models appearing in the blasting literature. Prediction capability of the trained neural network models as well as multivariate regression models was found to be strong and better than the existing most applied fragmentation prediction model. Diversity of the blasts data used is one of the most important aspects of the developed models.  相似文献   

18.
Summary This paper focuses on the methodology and techniques developed to characterize the rock fragments produced by blasting in an underground environment. This work formed part of an integrated approach to the optimization of blasting design at a Canadian mine. Details are given of the photographic and image analysis techniques adopted, together with data from a program of full scale, study blasts in the mine. Features of the observed fragmentation are reviewed which related to controlled variation in the blast designs, together with other factors which were observed both to influence fragmentation characteristics and to interact with loading equipment productivity.  相似文献   

19.
针对煤层底板突水预测问题,在总结现有突水预测方法和理论的基础上,通过特征选择实验得出水压、距工作面距离、砂岩段厚度、煤层厚度、煤层倾角、断层落差、裂隙带、开采面积、采高、走向长度是影响突水发生的主要因素,这些因素具有复杂、非线性的特点。提出基于长短时记忆(LSTM)神经网络构建的突水预测模型,将煤矿突水实例的数据作为样本数据对模型进行训练。最后,将LSTM神经网络模型与遗传算法-反向传播(GA-BP)神经网络模型和反向传播(BP)神经网络模型进行对比实验。实验结果表明,LSTM神经网络模型在测试集上的预测正确率更高,稳定性更好,更适用于煤层底板突水预测。   相似文献   

20.
Far-field peak particle velocity (PPV) measurements were made in the roof while blasting in coal development drivages at Tandsi Mine, Western Coalfields Limited, India. The roof was fragile at this mine and was posing constant support problems for mining, resulting in low productivity. The PPV measurements have been used to decipher the damage zone in the roof. The extent of damage obtained has been compared to establish the threshold limits for the damage zone. Conversely, the maximum charge per delay that can be exploded is calculated and a suitable blast design has been recommended for maintaining the roof stability and pull. A roof vibration predictor equation has been developed that shows a consistent trend indicating that it may have future use in a similar geo-mining setup. The blast pattern recommended has reduced the damage extent, though marginally, but helped in improving pull. Critical PPV for incipient rock damage in underground coal mine development drivages under fragile roof were computed. The PPV level for incipient crack growth was found to vary from 500 to 800 mm/s while for overbreak it varied from 800 to 1200 mm/s. It was also observed that the location of cut holes, charge concentration and firing sequence were found to be responsible for the difference in their damage potential.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号