This paper summarizes the latest developments, future prospects, and proposed countermeasures of reservoir sedimentation and channel scour downstream of the Three Gorges Reservoir (TGR) on the Yangtze River in China. Three key results have been found.(1) The incoming sediment load to the TGR has been significantly lower than expected.(2) The accumulated volume of sediment deposition in the TGR is smaller than expected because the overall sediment delivery ratio is relatively low, and the deposition in the near-dam area of the TGR is still developing.(3) River bed scour in the river reaches downstream of the Gezhouba Dam is still occurring and channel scour has extended to reaches as far downstream as the Hukou reach. Significantly, sedimentation of the TGR is less problematic than expected since the start of operation of the TGR on the one hand;on the other hand, the possible increases in sediment risks from dependence on upstream sediment control, deposition in the reservoir, and scour along middle Yangtze River should be paid more attention.(1) Sediment trapped by dams built along the upper Yangtze River and billion tons of loose materials on unstable slopes produced by the Wenchuan Earthquake could be new sediment sources for the upper Yangtze River. More seriously, possible release of this sediment into the upper Yangtze River due to new earthquakes or extreme climate events could overwhelm the river system, and produce catastrophic consequences.(2) Increasing sediment deposition in the TGR is harmful to the safety and efficiency of project operation and navigation.(3) The drastic scour along the middle Yangtze River has intensified the down-cutting of the riverbed and erosion of revetment, it has already led to increasing risk to flood control structures and ecological safety. It is suggested to continue the Field Observation Program, to initiate research programs and to focus on risks of sedimentation.  相似文献   

3.
《国际泥沙研究》2019,34(6):537-549
Dam removal can generate geomorphic disturbances, including channel bed and bank erosion and associated abrupt/pulsed release and downstream transfer of reservoir sediment, but the type and rate of geomorphic response often are hard to predict. The situation gets even more complex in systems which have been impacted by multiple dams and a long and complex engineering history. In previous studies one-dimensional (1-D) models were used to predict aspects of post-removal channel change. However, these models do not consider two-dimensional (2-D) effects of dam removal such as bank erosion processes and lateral migration. In the current study the impacts of multiple dams and their removal on channel evolution and sediment delivery were modeled by using a 2-D landscape evolution model (CAESAR-Lisflood) focusing on the following aspects: patterns, rates, and processes of geomorphic change and associated sediment delivery on annual to decadal timescales. The current modeling study revealed that geomorphic response to dam removal (i.e., channel evolution and associated rates of sediment delivery) in multiple dam settings is variable and complex in space and time. Complexity in geomorphic system response is related to differences in dam size, the proximity of upstream dams, related buffering effects and associated rates of upstream sediment supply, and emerging feedback processes as well as to the presence of channel stabilization measures. Modeled types and rates of geomorphic adjustment, using the 2-D landscape evolution model CAESAR-Lisflood, are similar to those reported in previous studies. Moreover, the use of a 2-D method showed some advantages compared to 1-D models, generating spatially varying patterns of erosion and deposition before and after dam removal that provide morphologies that are more readily comparable to field data as well as features like the lateral re-working of past reservoir deposits which further enables the maintenance of sediment delivery downstream.  相似文献   

4.
Construction of large dams is attractive because of their great benefits in flood control,hydropower generation,water resources utilization,navigation improvement,etc.However,dam construction may bring some negative impacts on sediment transport and channel dynamics adjustments.Due to the effects of recent water and soil conservation projects,sediment retention in the newly constructed large upstream reservoirs,and other factors,the sedimentation in the Three Gorges Reservoir(TGR)is quite different from the amount previously predicted in the demonstration stage.Consequently,based on the measured data,characteristics of sedimentation and the related channel deformation in the TGR were analyzed.The results imply that sediment transport tended to be reduced after the Three Gorges Project(TGP).Sedimentation slowed dramatically after 2013 and indicated obvious seasonal characteristics.Due to the rising water level in the TGR in the flood season,the yearly sediment export ratio(Eratio)was prone to decrease.The water level near the dam site should be reasonably regulated according to the flow discharge to improve the sediment delivery capacity and reduce sedimentation in the TGR,and to try to avoid situations where the flood retention time is close to 444 h.The depositional belt was discontinuous in the TGR and was mainly distributed in the broad reaches,and only slight erosion or deposition occurred in the gorge reaches.Sedimentation in the broad and gorge reaches accounted for 93.8% and 6.2% of the total sedimentation,respectively.The estuarine reach located in the fluctuating backwater area experienced alternate erosion-deposition,with a slight accumulative deposition in the curved reach.Sedimentation mainly occurred in the perennial backwater area.The insight gained in this study can be conducive to directly understanding of large reservoir sedimentation and mechanism of channel adjustment in the reservoir region in the main channel of large river.  相似文献   

5.
The process of dam removal establishes the channel morphology that is later adjusted by high-flow events. Generalities about process responses have been hypothesized, but broad applicability and details remain a research need. We completed laboratory experiments focused on understanding how processes occurring immediately after a sediment release upon dam removal or failure affect the downstream channel bed. Flume experiments tested three sediment mixtures at high and low flow rates. We measured changes in impounded sediment volume, downstream bed surface, and rates of deposition and erosion as the downstream bed adjusted. Results quantified the process responses and connected changes in downstream channel morphology to sediment composition, temporal variability in impounded sediment erosion, and spatial and temporal rates of bedload transport. Within gravel and sand sediments, the process response depended on sediment mobility. Dam removals at low flows created partial mobility with sands transporting as ripples over the gravel bed. In total, 37% of the reservoir eroded, and half the eroded sediment remained in the downstream reach. High flows generated full bed mobility, eroding sands and gravels into and through the downstream reach as 38% of the reservoir eroded. Although some sediment deposited, there was net erosion from the reach as a new, narrower channel eroded through the deposit. When silt was part of the sediment, the process response depended on how the flow rate influenced reservoir erosion rates. At low flows, reservoir erosion rates were initially low and the sediment partially exposed. The reduced sediment supply led to downstream bed erosion. Once reservoir erosion rates increased, sediment deposited downstream and a new channel eroded into the deposits. At high flows, eroded sediment temporarily deposited evenly over the downstream channel before eroding both the deposits and channel bed. At low flows, reservoir erosion was 17–18%, while at the high flow it was 31–41%.  相似文献   

6.
In mixed bedrock–alluvial rivers, the response of the system to a flood event can be affected by a number of factors, including coarse sediment availability in the channel, sediment supply from the hillslopes and upstream, flood sequencing and coarse sediment grain size distribution. However, the impact of along-stream changes in channel width on bedload transport dynamics remains largely unexplored. We combine field data, theory and numerical modelling to address this gap. First, we present observations from the Daan River gorge in western Taiwan, where the river flows through a 1 km long 20–50 m wide bedrock gorge bounded upstream and downstream by wide braidplains. We documented two flood events during which coarse sediment evacuation and redeposition appear to cause changes of up to several metres in channel bed elevation. Motivated by this case study, we examined the relationships between discharge, channel width and bedload transport capacity, and show that for a given slope narrow channels transport bedload more efficiently than wide ones at low discharges, whereas wider channels are more efficient at high discharges. We used the model sedFlow to explore this effect, running a random sequence of floods through a channel with a narrow gorge section bounded upstream and downstream by wider reaches. Channel response to imposed floods is complex, as high and low discharges drive different spatial patterns of erosion and deposition, and the channel may experience both of these regimes during the peak and recession periods of each flood. Our modelling suggests that width differences alone can drive substantial variations in sediment flux and bed response, without the need for variations in sediment supply or mobility. The fluctuations in sediment transport rates that result from width variations can lead to intermittent bed exposure, driving incision in different segments of the channel during different portions of the hydrograph. © 2020 The Authors. Earth Surface Processes and Landforms published by John Wiley & Sons Ltd  相似文献   

7.
I INTRODUCTIONThe number of dam constructions has increased during the last decades, pafticularly in the tropics andsemi-arid areas where high sediment yields are prominent, and therefore also the problems of reservoirsedimentation. In 1900 there were 42 large dams, i.e. higher than 15 m, while in 1950 and 1986 therewere 5,268 and about 39,000 respectively (ICOLD, 1988). In the period 1975 to 1990, the regions withthe largest increase of large dams were Central and South America, Asia …  相似文献   

8.
Channel cross‐sectional changes since construction of Livingston Dam and Lake Livingston in 1968 were studied in the lower Trinity River, Texas, to test theoretical models of channel adjustment, and to determine controls on the spatial extent of channel response. High and average flows were not significantly modified by the dam, but sediment transport is greatly reduced. The study is treated as an opportunistic experiment to examine the effects of a reduction in sediment supply when discharge regime is unchanged. Channel scour is evident for about 60 km downstream, and the general phenomena of incision, widening, coarsening of channel sediment and a decrease in channel slope are successfully predicted, in a qualitative sense, by standard models of channel response. However, there is no consistent channel response within this reach, as various qualitatively different combinations of increases, decreases or no change in width, depth, slope and roughness occur. These multiple modes of adjustment are predicted by the unstable hydraulic geometry model. Between about 60 km and the Trinity delta 175 km downstream of the dam, no morphological response to the dam is observed. Rather than a diminution of the dam's effects on fluvial processes, this is due to a fundamental change in controls of the fluvial system. The downstream end of the scour zone corresponds to the upstream extent of channel response to Holocene sea level rise. Beyond 60 km downstream, the Trinity River is characterized by extensive sediment storage and reduced conveyance capacity, so that even after dam construction sediment supply still exceeds transport capacity. The channel bed of much of this reach is near or below sea level, so that sea level rise and backwater effects from the estuary are more important controls on the fluvial system than upstream inputs. Copyright © 2005 John Wiley & Sons, Ltd.  相似文献   

9.
The sediment load of the Yangtze River (China) is decreasing because of construction of dams, of which the Three Gorges Dam (TGD) is the best known example. The rate of the decline in sediment load is well known, but changes in the sediment grain size distribution have not been given much attention. The TGD mostly traps sand and silt while clay is flushed through the reservoir. A large amount of sand is available in the Yangtze River downstream of the reservoir, and therefore the pre-dam sand concentration is not substantially reduced. The availability of silt on the Yangtze River bed is limited, and it is expected that most silt will be removed from the riverbed within one to two decades. In order to evaluate the impact of the change in grain size distribution on the tidal flats of the Yangtze Estuary, a highly schematized tidal flat model is setup. This model broadly reveals that the observed deposition rates are exceptionally large because of the high sediment concentration, the abundance of silt, the seasonal dominance of waves (shaping a concave profile), and the offshore tidal asymmetry. The model further suggests that deposition rates will be limitedly influenced by reductions in clay or fine silt but strongly impacted by reductions in median to coarse silt. The response of the downstream morphology to reservoir sedimentation therefore strongly depends on the type of trapped sediment. As a consequence, silt-dominated rivers, such as the Yangtze River and the Yellow River may be more strongly impacted than sand-dominated systems.  相似文献   

10.
1 INTRODUCTION Increasing attention is being given to sedimentation hazards downstream from reservoirs as dams built during the past century accumulate progressively greater volumes of sediment. The sediment storage both decreases reservoir capacity and operating efficiency of the dam, and creates a 搒ediment-shadow?downstream where sediment-starved flows commonly erode channel boundaries and create long-term channel instabilities. Numerous studies have documented downstream channel change…  相似文献   

11.
The rates and styles of channel adjustments following an abrupt and voluminous sediment pulse are investigated in the context of site and valley characteristics and time‐varying sediment transport regimes. Approximately 10.5 x 106 m3 of stored gravel and sand was exposed when Barlin Dam failed during Typhoon WeiPa in 2007. The dam was located on the Dahan River, Taiwan, a system characterized by steep river gradients, typhoon‐ and monsoon‐driven hydrology, high, episodic sediment supply, and highly variable hydraulic conditions. Topography, bulk sediment samples, aerial photos, and simulated hydraulic conditions are analyzed to investigate temporal and spatial patterns in morphology and likely sediment transport regimes. Results document the rapid response of the reservoir and downstream channel, which occurred primarily through incision and adjustment of channel gradient. Hydraulic simulations illustrate how the dominant sediment transport regime likely varies between study periods with sediment yield and caliber and with the frequency and duration of high flows. Collectively, results indicate that information on variability in sediment transport regime, valley configuration, and distance from the dam is needed to explain the rate and pattern of morphological changes across study periods. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

12.
1 INTRODUCTIONNdsral rivers entering reservoirs carry also sediment, partly as bedload and patly in suspension. At theentrance of the reservoir flow velocity is considerably reduced and the capability of sediment transport isdrashcally fading. Bedload maerial is deposited totally at the reservoir entrance fondng a delta, material...in suspension is cAned further intO the reservoir ulh.. it is partly deposited and partly dischargedthrough the dam towards downstreaxn (depending on the trapp…  相似文献   

13.
The characteristics of water flow and sediment transport in a typical meandering and island-braided reach of the middle Yangtze River is investigated using a two-dimensional (2D) mathematical model. The major problems studied in the paper include the carrying capacity for suspended load, the incipient velocity and transport formula of non-uniform sediment, the thickness of the mixed layer on the riverbed, and the partitioning of bed load and suspended load. The model parameters are calibrated using extensive field data. Water surface profiles, distribution of flow velocities, riverbed deformation are verified with site measurements. The model is applied to a meandering and island-braided section of the Wakouzi-Majiazui reach in the middle Yangtze River, which is about 200 km downstream from the Three Gorges Dam, to study the training scheme of the navigation channels. The model predicts the processes of sediment deposition and fiver bed erosion, changes of flow stage and navigation conditions for the first 20 years of impoundment of the Three Gorges Project.  相似文献   

14.
1 INTRODUCTIONIn Anstria reservoirs are frequentiy multi-purpose schemes, being used for power generation, floodprotechon and for wate suPPly downstream. These reservoirs have some adVerse imPaCts on theenvironment around the reservoir and also on the dOwnstream pat:. in rivers with mean annual discharge above 30 m3ls about 36 % of the total length of l884 lQn isimpounded, and only 35% remains as free flowing sections (Muhar, l992),. flooding has been, and continues to be, a serious pr…  相似文献   

15.
筑坝拦截对黑河河道沉积物粒度空间分布的影响   总被引:2,自引:1,他引:1  
河流沉积物对流域环境变化具有敏感响应,其粒度参数能反映沉积环境中物质来源和水动力环境.本文以黑河流域上中游为研究区域,探究河流沉积物粒度对流域环境变化的响应.从黑河上中游干流22个主要控制断面采集河床沉积物样品,采用筛分法和吸管法对沉积物样品粒度参数进行测定,并分析其空间分布规律对筑坝拦截为主的环境改变响应.研究结果表明:受梯级水库建设影响,黑河上中游泥沙粒径大小差异显著.干流库区泥沙粒径较自然河段明显减小,分选很好,呈正偏或极正偏尖锐分布,而且在库区不同沉积高度上表现出分层沉积特征;坝下游河段因遭受强烈冲刷,较自然河段泥沙粒径粗化显著,分选变差,偏态趋向极正偏,峰态尖锐化;水库回水区受水库壅水及下泄清水的双重制约,泥沙粒度参数介于自然河段和坝下游河段之间,整体分选中等,呈极正偏尖锐分布;沉积环境分析表明,上游支流河段沉积物粒度特征受泥沙供给和物源特征的影响较水动力条件显著,干流河段沉积物粒度特征主要受水动力条件控制.研究结果既符合河流上中游沉积物粒度分布规律,也反映了河流环境变化对沉积物粒度组成的影响.  相似文献   

16.
Dam removal has been demonstrated to be one of the most frequent and effective fluvial restoration actions but at most dam removals, especially of small dams, there has been little geomorphological monitoring. The results of the geomorphological monitoring implemented in two dams in the rivers Urumea and Leitzaran (northern Spain) are presented. The one from the River Urumea, originally 3.5 m high and impounding 500 m of river course, was removed instantaneously whereas that in the River Leitzaran, 12.5 m high, and impounding 1500 m of river course, is in its second phase of a four‐stage removal process. Changes in channel morphology, sediment size and mobility and river bed morphologies were assessed. The monitoring included several different techniques: topographical measurements of the channel, terrestrial laser scanner measurements of river bed and bars, sediment grain size and transport; all of them repeated in four (May, August, November 2011 and May 2012) and five (July and September 2013, April and August 2014 and June 2015) fieldwork campaigns in the River Urumea and River Leitzaran, respectively. Geomorphic responses of both dam removals are presented, and compared. Morphological channel adjustments occurred mainly shortly after dam removals, but with differences among the one removed instantaneously, that was immediate, whereas that conducted by stages took longer. Degradational processes were observed upstream of both dams (up to 1.2 m and 4 m in the River Urumea and River Leitzaran, respectively), but also aggradational processes (pool filling), upstream of Inturia Dam (2.85 m at least). Less evident aggradational processes were observed downstream of the dams (up to 0.37 m and 0.50 m in the River Urumea and River Leitzaran, respectively). Flood events, especially a 100 year flood registered during the monitoring period of Mendaraz Dam removal, reactivated geomorphological processes as incision and bank erosion, whereas longitudinal profile recovery, grain‐size sorting and upstream erosion took longer. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

17.
Human activities have increasingly strong impacts on the sediment dynamics of watersheds, directly, for example through water abstraction and sediment extraction, but also indirectly through climate change. This study aims at disentangling these impacts on natural sediment fluxes for the Borgne River, located in the Alps of southwest Switzerland, using two approaches: First, an assessment of contemporary sediment sources and their relative contribution to the sediment delivered to the catchment outlet is undertaken by geochemical fingerprinting and a mixing model. Second, a spatially distributed conceptual model of suspended sediment production and transfer is used to quantify the contribution of different portions of the catchment to the total sediment yield. The model describes the influence of hydroclimatic variables (rainfall, snowmelt, and ice melt), water diversions and reservoir trapping on the sediment yield accounting for the erodibility of the different land covers present in the catchment. The analysis of different scenarios based on this conceptual model aids the interpretation of the fingerprinting results and the identification of the most important factors controlling sediment fluxes. Although the conceptual model overestimates the contribution of the downstream source area and underestimates the contribution of the upstream source area, the results allow us to qualitatively assess the impacts of different drivers influencing the sediment yield at the catchment scale. The results suggest: (1) high sediment yield from the uppermost part of the catchment due to sediment delivery by glacial ice melt; (2) delayed sediment transfer from areas impacted by water abstraction; and (3) reduced sediment contribution from areas upstream of a major hydropower reservoir that intercepts and traps sediment. Although process (1) and processes (2) and (3) serve to counter one another, our study emphasizes that the relative impacts of Anthropocene climate change and human impacts on sediment delivery may be disentangled through multi-proxy approaches. © 2019 John Wiley & Sons, Ltd. © 2019 John Wiley & Sons, Ltd.  相似文献   

18.
I. INTRODUCTIONWhen a sediment--laden flow reaches the backwater zone of a reservoir, the suddenreduction of flow velocity causes sediment particles to settle toward the river bed. Undercertain circumstsnces, it will plunge and form a layer of sediment--water mixture flowingbeneath the water surface. This flowing layer is called the turbidity current. A turbiditycurrent is relatively stable and has important impacts on reservoir sedimentation.In the case of deep reservoirs, due to temper…  相似文献   

19.
Sediment causes a serious problem in relation to dam function. A cooperative sediment sluicing operation has been under way since 2017 to prevent sediment from accumulating in dams in the Mimi River,Miyazaki, Japan. To achieve a smooth and stable operation, it is very important to determine the sediment source and a sediment transport system to maintain the dam’s function. In the current study, the source and transport of sediment from the Mimi River basin have been analyzed with X-ray diffracti...  相似文献   

20.
The Tongariro Power Development Scheme (TPDS) is used to regulate flow in the headwaters of the largest catchment on the North Island of New Zealand (the Waikato). Two small dams, the Rangipo Dam and the Poutu Intake Dam, were constructed in 1973 and 1983. The flow regime of the river is managed to divert freshes into the power scheme, but allows flows larger than 100 m3 s?1 to be released, to rework and transport sediment through the catchment. Analysis of aerial photos and maps spanning 1928 to 2007, alongside field measurements, show that there have been few hydrogeomorphic adjustments since dam construction. This includes limited changes to channel geometry, channel planform and bed material organization immediately downstream of the dams. In addition, offsite effects are minimal, both 500 m downstream of each dam, and in the more sensitive, less confined reaches in the lower catchment (11 km downstream of the Poutu Intake dam). The limited changes can be attributed to the locations of the dams within reaches characterised by bedrock gorges and confined within terraces. These locations act to flush sediments and impose margins that allow minimal adjustment of the channel. Bed material within this reach is characterised by the presence of a boulder lag. This is sourced from long-term incision into lahar deposits, and acts to limit the rate of incision, creating a steep and stable base upon which active fractions are transported. Just as importantly, significant storage in the low-relief volcanic plateau located in the upper catchment acts to disconnect and store the high sediment yields generated by active volcanic cones in the western sub-catchment upstream of the dams. This limits the rate of sediment supply to regulated reaches. Findings from this study show that analysis of reach-scale controls is essential in framing dam site locations in relation to the distribution of reaches and landscape units across the catchment. In this instance, tributary inputs downstream of the dams do not replenish the sediment and flow removed at the dam locations, as has been observed in other regulated systems. Rather, the river itself is resilient to change and flow variability is well managed allowing geomorphically effective floods to occur. Landscape setting is a key consideration in determining the hydrogeomorphic impact of flow regulation.  相似文献   