A database of ground vibration due to blasting at 27 limestone quarries, located in various parts of India, has been created. The database contains peak particle velocity (PPV), frequency, other vibration related and blast design parameters. Regression analysis of the data is carried out to derive site constants of the USBM predictor equation for individual quarries. It is found that these site constants are correlated with each other. By combining all the data, a generalised predictor equation is developed to assess and control ground vibration. In addition, mean zone of attenuation has been delineated using the predictor equations of the individual quarries. The dominant frequency of ground vibration with respect to distance and the possibility of modifying it by changing delay intervals in production blasts are also examined.  相似文献   

2.
Most blasting operations are associated with various forms of energy loss, emerging as environmental side effects of rock blasting, such as flyrock, vibration, airblast, and backbreak. Backbreak is an adverse phenomenon in rock blasting operations, which imposes risk and increases operation expenses because of safety reduction due to the instability of walls, poor fragmentation, and uneven burden in subsequent blasts. In this paper, based on the basic concepts of a rock engineering systems (RES) approach, a new model for the prediction of backbreak and the risk associated with a blast is presented. The newly suggested model involves 16 effective parameters on backbreak due to blasting, while retaining simplicity as well. The data for 30 blasts, carried out at Sungun copper mine, western Iran, were used to predict backbreak and the level of risk corresponding to each blast by the RES-based model. The results obtained were compared with the backbreak measured for each blast, which showed that the level of risk achieved is in consistence with the backbreak measured. The maximum level of risk [vulnerability index (VI) = 60] was associated with blast No. 2, for which the corresponding average backbreak was the highest achieved (9.25 m). Also, for blasts with levels of risk under 40, the minimum average backbreaks (<4 m) were observed. Furthermore, to evaluate the model performance for backbreak prediction, the coefficient of correlation (R 2) and root mean square error (RMSE) of the model were calculated (R 2 = 0.8; RMSE = 1.07), indicating the good performance of the model.  相似文献   

3.
Environmental impact of blasting at Drenovac limestone quarry (Serbia)   总被引:1,自引:1,他引:0  
In present paper, the blast-induced ground motion and its effect on the neighboring structures are analyzed at the limestone quarry "Drenovac" in central part of Serbia. Ground motion is examined by means of existing conventional predictors, with scaled distance as a main influential parameter, which gave satisfying prediction accuracy (R > 0.8), except in the case of Ambraseys–Hendron predictor. In the next step of the analysis, a feed-forward three-layer back-propagation neural network is developed, with three input units (total charge, maximum charge per delay and distance from explosive charge to monitoring point) and only one output unit (peak particle velocity). The network is tested for the cases with different number of hidden nodes. The obtained results indicate that the model with six hidden nodes gives reasonable predictive precision (R ≈ 0.9), but with much lower values of mean-squared error in comparison to conventional predictors. In order to predict the influence level to the neighboring buildings, recorded peak particle velocities and frequency values were evaluated according to United States Bureau of Mines, USSR standard, German DIN4150, Australian standard, Indian DMGS circular 7 and Chinese safety regulations for blasting. Using the best conventional predictor, the relationship between the allowable amount of explosive and distance from explosive charge is determined for every vibration standard. Furthermore, the effect of air-blast overpressure is analyzed according to domestic regulations, with construction of a blasting chart for the permissible amount of explosive as a function of distance, for the allowable value of air-blast overpressure (200 Pa). The performed analysis indicates only small number of recordings above the upper allowable limit according to DIN4150 and DMGS standard, while, for all other vibration codes the registered values of ground velocity are within the permissible limits. As for the air-blast overpressure, no damage is expected to occur.  相似文献   

4.
This study evaluates the impacts resulting from quarry-blasting operation on nearby buildings and structures as it generates ground vibration, air blast, and fly rocks. In this paper, first blasting operation and its possible environmental effects are defined. Then the methods of blast-vibration prediction and commonly accepted criteria to prevent damage were introduced. A field experimental work was conducted to minimize the vibration effects at Saribayir quarry as it is an identical case for the many quarries situated in and around Istanbul, Turkey. Although the local surrounding geology and rock mechanics have great influence on vibrations as uncontrollable parameter, the charge weight per delay, delay period, geometric parameters of the blasts were changed to solve the existing vibration problem in the studied quarry. To obtain a realistic result, 10 blasts were carried out and 30 seismic records were made in different places mainly very close the buildings and the other vulnerable structures around the quarry. The evaluation is performed whether the vibration level are within safe limits or not. The prediction equation based on scaled distance concept is also determined, however, it is a site-specific model and need to be updated when the quarry advances. The safe blast parameters which minimize the environmental effect were determined for the Saribayir quarry.  相似文献   

5.
This paper presents the results of ground vibration measurements carried out in Hisarcik Boron open pit mine located on the west side of central Anatolia near Kütahya province in Turkey. Within the scope of this study to predict peak particle velocity (PPV) level for this site, ground vibration components were measured for 304 shots during bench blasting. In blasting operations, ANFO (blasting agent), gelatin dynamite (priming), and delay electric detonators (firing) were used as explosives. Parameters of scaled distance (charge quantity per delay and the distance between the source and the station) were recorded carefully and the ground vibration components were measured for all blast events using two different types of vibration monitors (one White Mini-Seis and one Instantel Minimate Plus Model). The absolute distances between shot points and monitor stations were determined using GPS. The equation of square root scaled distance extensively used in the literature was taken into consideration for the prediction of PPV. Then, the data pairs of scaled distance and particle velocity obtained from the 565 event records were analyzed statistically. At the end of statistical evaluation of the data pairs, an empirical relation which gives 50% prediction line with a reasonable correlation coefficient was established between PPV and scaled distance.  相似文献   

6.
Air gap in an explosive column has long been applied in open-pit blasting as a way of reducing explosive charge, vibration, fly rock and improve fragment size. In conventional blasting a greater amount of explosive energy is lost in the generation of oversize fragments. Oversize fragments reduces loading and hauling efficiencies of equipment which requires secondary blasting. Recurring oscillation of shock waves in the air gap increases the time over which it acts on the adjacent rock mass by factor of 2–5. Top air deck blasting technique trial conducted with an application of gas bags at Chimiwungo pit resulted in an improved fragmentation of about 94 % less than 950 mm. Results obtained from the analysis of muckpile images using split-desktop exhibited that the mean fragment size was 264.81 mm and F20, F80 and top-size were 41.99, 683.18 and 1454.69 mm respectively. Optimum crusher feed size was as large as 1200 mm and crushed down to the 40 mm and only a small percent of the material was above 1200 mm. Gas bag application resulted in a significant reduction in explosives load in production holes without loss in fragmentation or movement of the collar zone. This reduced total cost of charging as compared to conventional blasts with a variance of $20, powder factor was dropped to an average of 0.86 kg/bcm. The technique reduced the cost of bulk blend explosive by 15 %, reduced overall cost of charging per hole by 12 %, enhanced premature ejections. The overall blast results were satisfactory, 443,624 tonnes of blasted material from the block which represented 90 % of the total muckpile material was within 900 mm size. The overall muckpile blasted was well fragmented.  相似文献   

7.
岭澳核电站二期工程基岩爆破安全阈值分析   总被引:2,自引:1,他引:1  
夏祥  李海波  李俊如  朱莅  刘博  王晓炜 《岩土力学》2008,29(11):2945-2951
核电站基础爆破开挖过程中必须严格控制岩体爆破损伤深度,确保建基面安全。以广东岭澳核电站二期工程基础爆破开挖为例,通过现场爆破振动监测、岩体声波试验以及数值模拟,综合分析了岩体爆炸振动衰减规律和损伤特征,研究了距爆源一定距离处岩体振动速度与损伤特征的关系,提出了岭澳核电站二期工程岩体爆炸损伤深度的控制方法,确定了相应的安全阈值。分析结果表明,岭澳核电站二期工程基础爆破开挖时,当距爆源30 m处的岩体质点振动速度不超过5 cm/s时,可保证下卧基岩的损伤深度小于2 m,确保建基岩完整性。  相似文献   

8.
以三峡堤防工程基础开挖为研究对象,对堤防工程基础开挖爆破地震波的振动监测方法和监测物理量的选择进行了研究。通过对爆破振动监测结果的回归分析,确立了爆破振动速度的传播衰减规律。结合工程实际,对基础开挖爆破产生的地震波的振动频率与爆区周围建(构)筑物的自振频率进行了对比分析;经对比分析,此次开挖工程爆破引起的振动频率远大于周围民房结构的自振频率,从而保证了周围建(构)筑物的安全。同时,结合该堤防工程开挖爆破施工,从建(构)筑物的安全振动速度和爆破振动的安全距离两个方面确定了爆破振动安全控制建议标准。研究分析表明,本次爆破工程的振动速度和安全距离都在爆破振动安全控制标准的范围内,从而说明了本次爆破工程圆满安全地完成了施工任务,保证了爆破时周边建(构)筑物的安全;其研究对指导基础开挖爆破施工和保证地面建筑物安全起到了重要作用。  相似文献   

9.
Investigations were carried out at seven underground coal mines in India to characterise the responses of roof and pillars of underground workings to the vibrations induced by adjacent open-pit blasting. The roof rocks of the selected underground instrumented panels were having RMR between 36.7 to 57. Monitoring of strata behaviour was carried out before and after blasts. Arrangements were made to mount the transducers of seismographs in roof and pillars to monitor the vibration. Attempts were made to monitor the vibration simultaneously, for a blast, in the pillar and at the junction of the roof or away from the junction in the gallery. 102 sets of such vibration data were recorded in the underground mines. It was observed that the roof of underground roadways vibrated with higher peak particle velocity (PPV) compared to pillars. The amplification of vibration in the roof compared to pillars, away from the junction, was 1.02 to 2.58 times whereas at the junctions, it was 2.04 to 5.57 times.  相似文献   

10.
This research was performed on the quarry that will be opened to produce aggregates and rock filling material at Catalagzi region at Zonguldak province in Turkey. However, there are some structures which can be adversely affected by blasting at the quarry. These structures are a methane exploration drill hole and a house at the distances of 340 and 390 m, respectively. One of the main goals of this study is to perform a preliminary assessment of possible damage effect of ground vibrations induced by blasting on these structures by risk analysis based on ground vibration measurements. In order to propose a preliminary blast design models separately for aggregate and rock filling material production, six test shots with different maximum charge per delay were planned and fired at the quarry. In these shots, 90 events were recorded. To predict peak particle velocity (PPV), the relationship between the recorded peak particle velocities and scaled distances were investigated. During this investigation, the data pairs were statistically analyzed and a PPV prediction equation specific to this site with 95% prediction line were obtained. And also, this equation was used in the derivation of the practical blasting charts specific to this site as a practical way of predicting the peak particle velocity and maximum charge per delay for future blasting. A risk analysis was performed by using this equation. In the light of this analysis, preliminary blast design models were proposed to be used in this quarry for aggregate and rock filling material production.  相似文献   

11.
浅埋大跨隧道施工爆破监测与减震技术   总被引:4,自引:1,他引:3  
以沪-蓉线庙垭分岔隧道工程为背景,研究了其浅埋大跨段掘进爆破的地表震动效应及大断面开挖减震控制技术,并结合爆破监测数据的回归分析,确立了地震波垂向衰减规律的数学模型。综合分析地表及洞内地震波的震动特性发现,地表质点振动主振频率主要集中在低频段;由于表土的滤波作用,主振频率随距离的增加而减小的趋势并不明显;洞内混凝土衬砌减弱了爆破对围岩的冲击,高频地震波衰减极快;开挖区上部的地表振速通常大于未开挖区的振速,浅埋大跨隧道爆破安全控制应以已开挖区顶部的地表振速为准。  相似文献   

12.
The safety and stability of concrete and masonry dams is a great concern when blasting has to be conducted close to these dams in order to construct small hydro-electric projects. There is a danger of ground vibration amplification to those residential-type buildings that are built close to these dams.

Responses of three concrete and masonry dams were measured directly by conducting a number of blasts and by monitoring vibration in the ground as well as on the dams. The amplitudes and frequencies of the motions were analysed and vibration attenuation relations were derived. These relations were used to compare the vibration levels on the dams with those in the ground.

Because of close-in construction blasts that produced high frequency ground vibrations, there was no amplification of the ground vibrations by these dams. The measured amplitudes of ground vibration were comparable to those of the dams.  相似文献   

13.
The vibrations of existing service tunnels induced by blast-excavation of adjacent tunnels have attracted much attention from both academics and engineers during recent decades in China. The blasting vibration velocity (BVV) is the most widely used controlling index for in situ monitoring and safety assessment of existing lining structures. Although numerous in situ tests and simulations had been carried out to investigate blast-induced vibrations of existing tunnels due to excavation of new tunnels (mostly by bench excavation method), research on the overall dynamical response of existing service tunnels in terms of not only BVV but also stress/strain seemed limited for new tunnels excavated by the full-section blasting method. In this paper, the impacts of blast-induced vibrations from a new tunnel on an existing railway tunnel in Xinjiang, China were comprehensively investigated by using laboratory tests, in situ monitoring and numerical simulations. The measured data from laboratory tests and in situ monitoring were used to determine the parameters needed for numerical simulations, and were compared with the calculated results. Based on the results from in situ monitoring and numerical simulations, which were consistent with each other, the original blasting design and corresponding parameters were adjusted to reduce the maximum BVV, which proved to be effective and safe. The effect of both the static stress before blasting vibrations and the dynamic stress induced by blasting on the total stresses in the existing tunnel lining is also discussed. The methods and related results presented could be applied in projects with similar ground and distance between old and new tunnels if the new tunnel is to be excavated by the full-section blasting method.  相似文献   

14.
隧道近距下穿山坡楼房爆破振动测试研究   总被引:3,自引:0,他引:3  
管晓明  傅洪贤  王梦恕 《岩土力学》2014,35(7):1995-2003
以成渝客运专线新红岩隧道为工程背景,测试了隧道近距下穿山坡楼房爆破时引起的地面振动。通过对隧道浅埋侧(隧道地表斜坡下部)和深埋侧(隧道地表斜坡上部)的地表振动数据分析,研究了地表的振动速度、振动主频及振动安全评价方法。结果表明:在浅埋隧道爆破的近区,入射纵波为主要载体,地表水平和竖直方向振动的主要成分可以认为是入射纵波在水平和竖直方向的投影,浅埋侧和深埋侧地表水平和竖直方向振速的大小取决于爆心距和入射纵波与竖直方向的夹角两个因素;隧道采用电子雷管进行单孔连续起爆,相比非电雷管爆破,可以有效降低地表振动强度,同时能够提高地表振动主频;地表振动主频方面,地表竖直方向振动主频普遍高于水平方向,而且浅埋侧地表竖直和水平方向主频大多高于深埋侧地表对应方向的主频;隧道近距下穿山坡楼房进行爆破施工时,建议在浅埋侧和深埋侧地表同时布置爆破振动监测测点,并根据浅埋侧和深埋侧地表测点的峰值振速、爆破振动主频与建筑物固有频率的关系对地表振动安全进行评价,以减少隧道施工爆破对地表环境和周围建筑物造成的振动破坏。  相似文献   

15.
There is a common belief within the blasting community that increasing the burden will increase the blast vibration. In order to test this belief in a direct sense, it would be desirable to fire single blastholes with various burdens and monitor the vibrations at many locations. A review of past literature indicates that such direct tests are rare and only scant data is available. Nevertheless, a detailed analysis of this and associated past work (on small-scale blocks and choke blasts) shows no convincing evidence of an influence of burden on blast vibration. On the other hand, by considering the role of reflected waves in a simple analytical model, reasoning is given to show that the vibration might well be insensitive to burden. In view of the scant data available, it was decided to conduct trials of a direct nature, in which 13 single blastholes were fired to a free face. The burdens chosen were 2.6 m, 5.2 m and 10.4 m, and the vibration was measured at typically 10 locations over the range 5 m to 50 m from each hole. The results clearly show that the vibration is independent of such burdens. Furthermore, a side-by-side comparison of a choke blast with a free-face blast showed that the vibration from the holes in the choke blast was not higher than the vibration from the holes in the free-face blast. The present work also shows that vibration, although insensitive to burden, is not insensitive to the condition (i.e., the degree of damage) of the surrounding rock mass. In this regard, blastholes in undamaged ground produce a significantly higher vibration than blastholes in damaged ground. This might well be the reason why pre splits and drop-cuts are observed to produce relatively high vibrations, i.e., it is not because such blasts typically involve large burdens, but rather that they are usually initiated in relatively undamaged ground.  相似文献   

16.
Blasting constitutes a beneficial industrial technology, used in quarries and mining production processes, which ensures the achievement of the expected results in a short period of time with relatively low cost. Nevertheless, a significant part of the used blasting energy is wasted in the form of ground vibration and air blast. Hence, blasting-induced ground vibrations are one of the fundamental problems in the mining industry which may cause severe damage to structures and plants nearby. Therefore, a vibration control study plays an important part in the minimization of the environmental effects of blasting in mines. This study represents an investigation reporting ground motion (measured in terms of peak particle velocity (mm/s)) and air blast overpressure measurements around the open-pit phosphate mine near Metlaoui area (southwestern Tunisia). It aimed to calculate the site’s constants: K (ground transmission coefficient) and n (site attenuation curve slope). The obtained site parameters allowed determining the propagation equation of the blast-induced seismic waves in the study area. The scope of this study was to predict the peak particle velocity when the amount of explosive charge and/or the distance were altered with minimum spoil to the environment. Also, a frequency overview of the study area revealed the dominance of low frequencies (>?40 Hz). Such values can cause damage to the nearby structures when a specific peak particle velocity value is reached by blasting. Moreover, this study demonstrated that all overpressure magnitudes were less than 134 dB, which is the safe limit of air blast level.  相似文献   

17.
Tsaoling is located in Southwestern Taiwan, 10 km east of the frontal thrusts of the mountain belt. Five large historical landslide events were recorded from 1862 to 1999. No details of the earliest landslide event (1862) are available, thus this paper deals with the 1941 landslide event. Using the Particle Flow Code in two dimensions (PFC 2D) to simulate the mechanism of the Tsaoling landslide in 1941, this study shows that the landslide block developed cracks and slid down 0.2–1.8 m on the sliding plane. The cracks concentrated in certain zones, which corresponded to future landslide detachment planes. During the vibration simulation, the cracks spread from the shear plane to ground surface. Monitoring the variations of the displacements, velocity, and stress during vibration simulation showed that the peak velocity and stress in the transition zones occurred at 3 s. The displacement of the left part of the block exceeded 1.3 m, and the displacement of the right part was less than 1.3 m during vibration simulation. These results suggest that the left part of the block was pushed down by the right part, ultimately inducing a landslide during an earthquake.  相似文献   

18.
采矿爆破振动波在岩溶区的传播影响因素分析   总被引:1,自引:1,他引:0  
为研究不同情况下爆破振动强度衰变规律和振动对岩溶塌陷的影响,为当地矿山合理开采及减少地面塌陷灾害的发生提供可靠依据,对湖南水口山铅锌矿区进行现场爆破振动测试,并利用古丹铅锌矿实测数据作对比分析;试验矿区共布设4条测线,接收8组爆破振动数据。采用萨道夫斯基修正公式对采集的数据进行计算,以爆破产生的振动波频率及振动速度作为测试指标,对实测数据进行提取、处理,确定爆破振动波的频率及其在介质中的传播速度及地震波引发的质点振动峰值振速。试验结果表明:采矿活动是岩溶地面塌陷的主要影响因素;爆破振动波的频率衰减强度与其在岩土体中的传播距离和断层有关,振动波的传播速度受到岩土体性质、岩层结构特征、岩层走向等因素的影响。   相似文献   

19.
The drill and blast method (D&B) is perhaps the most common excavation method for rock mass, and intense blasting vibrations would induce an excavation damage zone (EDZ) around the excavated space. The tensile failure of rock mass in EDZ at diverse rupture velocities results in various geological disasters in engineering practices. The objective of this paper is to investigate the effect of blasting on the tensile strength of sandstone rock and the influence of loading rate on the disk specimens affected by blasting. We firstly performed a D&B exercise on a sandstone block with a size of 600 mm × 600 mm × 120 mm. Then, a total number of 49 standard disk specimens were prepared from large fragments of this blasting sandstone block and an undamaged block. A series of Brazilian split tests was carried out using these specimens to determine their indirect tensile strength, and to assess the effects of the distance from the blasting source and loading rate (varying from 1.67 × 10?5 to 8.33 × 10?2 mm s?1). The results show that the tensile strength of specimens exhibits an upward trend with increasing distance from the blasting source, to approach that of undamaged rock, following a power function with a positive exponent (0~1). The loading rate affects the tensile mechanical behaviors of disks, in terms of the convergence of microscopic defects, the main load-bearing area, and the absorbed energy at the fracture moment of specimens. Both the tensile strength and absorbed energy have positive linear correlations with the natural logarithm of the loading rate. In addition, the fragmentation degree of disk specimens also increases due to an increasing brittleness of sandstone with the loading rate.  相似文献   

20.
The Hatshepsut Temple at Luxor, southern Egypt was built as a garden for Amun, and the first court indeed had exotic trees and vegetations. The pathway to the temple was along a sphinx-lined causeway linking the valley to pylons, which are missing now. As an effort to outline remains of the vanished garden and missing pylons and any other possible archaeological structures at this first court site, an extensive integrated magnetic/ground-penetrating radar (GPR) geophysical survey was conducted. The magnetic survey covered the entire area of the first court (100?×?60 m), while the GPR survey covered only an area of 50?×?50 m. The acquired GPR data were processed and presented as 2-D depth sections providing a reasonable vertical/horizontal resolution for the upper 6 m of the investigated site. The acquired magnetic data was processed and presented as 2-D image. The integrated interpretation of the acquired GPR and magnetic data revealed some archaeological features including a rectangular depression which is presumably an ancient man-made pond in the garden of the temple, a rectangular feature that may be a foundation of the missing pylon of the temple, and a suite of aligned anomalies that could be the remnants of sphinx. Such findings reflect the archaeological potentiality of the surveyed site and outline the extension of the temple. Meanwhile, these results necessitate further geophysical investigation or archaeological excavation to be confirmed.  相似文献   