首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 156 毫秒
1.
2.
Geomagnetism and Aeronomy - Analysis of images of the full solar disk obtained by ground-based (BST-2, CrAO RAS) and space-based (SDO/AIA, SDO/HMI) instruments and the potential approximation...  相似文献   

3.
Analysisofforeshocksequenceofthe1975HaichengearthquakeofMs7.3Zhao-RongZUO(左兆荣);Jian-PingWU(吴建平)andZhi-LingWU(巫志玲)(Instituteof...  相似文献   

4.
INTRODUCTIONThe method of probabilistic seismic risk analysis was proposed by Cornell in1968(Cornell,1968).After more than30years development,it has become the main method for seismic riskassessment of engineering sites and seismic zonation,and has been u…  相似文献   

5.
Mathematicalmodellingofnonlinearbehaviourofseismicity杨立明,石特临,郭大庆Li-MingYANG;Te-LinSHIandDa-QingGUO(EarthquakeResearchInstitut...  相似文献   

6.
In the past decade, the most authoritative catalogues of Chinese earthquakes and the most popular with seismologists in China are the following:(1) Gu Gongxu, 1983, Catalogue of Chinese Earthquakes;(2) Min Ziqun, 1988, Concise Catalogue of Chinese Earthquakes;(3) Xie Yusuou, 1989, Catalogue of Chinese Earthquakes (M≥ 4.7) from 1900-1980 with Uniform Magnitudes; and(4) Min Ziqun, 1995, Catalogue of Chinese Historical Strong Earthquakes. Earthquakes that occurred before 1900 are mainly documented in historical records.Since 1950s, more recent earthquakes were documented in two major compilations of historical records finished in 1956 and 1983-1987. Separately this effort resulted in two chronicles: two volumes for the first one and five volumes for the second one. The magnitudes are converted from the maximum intensity. These magnitudes, by convention, are connected with surface wave magnitudes. However, it is clear that they do not have any strict seismological definition.The period of 1900-1962 documen  相似文献   

7.
A method of estimation of occurrence probability of earthquake intensity at a given site from the results of a ten-year scale of earthquake prediction described with a probability of occurrence in a given "prediction cell" is proposed in this paper. 2316 cities and towns in China were analyzed by using this method. The probability of intensity Ⅵ-Ⅸ were given for every city. These results can be used for the earthquake insurance, loss estimation, and planning of disaster protection.  相似文献   

8.
Estimation of seismic hazard for the fast developing coastal area of Pakistan is carried out using deterministic and probabilistic approaches. On the basis of seismotectonics and geology, eleven faults are recognized in five seismic provinces as potential hazard sources. Maximum magnitude potential for each of these sources is calculated. Peak ground acceleration (PGA) values at the seven coastal cities due to the maximum credible earthquake on the relevant source are also obtained. Cities of Gwadar and Ormara with acceleration values of 0.21g and 0.25g respec-tively fall in the high seismic risk area. Cities of Turbat and Karachi lie in low seismic risk area with acceleration values of less than 0.1g. The Probabilistic PGA maps with contour interval of 0.05g for 50 and 100 years return period with 90% probability of non-exceedance are also compiled.  相似文献   

9.
Current practice uses predictive models to extrapolate long-period response spectra based on far-field recordings in moderate and weak earthquakes. However, the spectra are not long enough and the data are often not reliable, which means that the seismic design code cannot accurately define seismic design requirements for long-period structures. The near-field recordings in the main-shock of the Chi-Chi earthquake have a large signal-to-noise ratio (SNR), which makes them suitable for studying the long-period acceleration response spectrum up to 20 sec. The acceleration response spectra from 246 stations within 120 km of the causative fault are statistically analyzed in this paper. The influence of distance and site conditions on long-period response spectrum is discussed, and the shapes of the amplification spectra are compared with the standard spectra specified in the seismic design code of China. Finally, suggestions for future revisions to the code are proposed.  相似文献   

10.
The seismic hazard of research area is evaluated by probabilistic analysis method for three different seismic statistical zone scenarios.The influence of uncertainty in seismic statistical zone delimiting on the evaluation result is discussed too.It can be seen that for those local sites along zone‘s border or within areas with vast change of upper bound magnitude among different scenarios the influence on seismic hazard result should not be neglected.  相似文献   

11.
1 INTRODUCTION Erosion caused by ephemeral flows is a frequent phenomenon in nature and contributes to the shape of the landscape. This type of erosion may cause great soil losses in agricultural areas, which are quickly transferred to the watershed outlets through the rill and gully network (Bennett et al., 2000; Poesen et al., 2003). Concentrated flow erosion is controlled by the erodibility of surface materials, climate, soil use and management, and watershed topography. Several metho…  相似文献   

12.
Factors affecting rill erosion of unpaved loess roads in China   总被引:1,自引:0,他引:1       下载免费PDF全文
This study explores factors that affect road surface erosion in a small watershed on the Loess Plateau. Global positioning system (GPS)‐assisted field surveys and geographical information system methods were applied. The results show that road surface rills in the watershed are more easily formed on main roads, which are disturbed by intensive human activities. Secondary unpaved road networks occupied the largest road surface area and contributed 49% of the total road surface rill volumes. Spatial analysis reveals that roads near residential areas or leading to other human‐disturbed land‐use types are at high risk of soil loss. In each road segment, slope gradient, road segment length and drainage area have impacts on surface rill formation and development. Among these factors, slope gradients have been verified as a controlling factor of rill erosion intensification. Both road segment length (R = 0.83, N = 82) and drainage area (R = 0.72 for road segment and 0.76 for upslope drainage areas, N = 82) significantly influence total road surface rill volumes. The interaction variable of road segment length multiplied by slope is more closely correlated with road segment soil loss than that of the independent variables alone. Linear equations composed of slope gradient, road segment length and upslope drainage area are proposed. The new equation performs much better at predicting surface soil loss from secondary road segments compared with the previous models, which have not considered upslope drainage areas. The relationships and equations from this study will be helpful for road erosion evaluation in a small watershed of the study area. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   

13.
Based on the measuring data and Digital Elevation Data (DEM) in a typical watershed--Hemingguan Watershed, Nanbu County, Sichuan Province of China, a GIS-based distributed soil erosion model was developed particularly for the purple soil type. It takes 20 m × 20 m grid as calculating unit and operates at 10-minute time interval. The required input data to the model include DEM, soil, land use, and time-series of precipitation and evaporation loss. The model enables one to estimate runoff, erosion and sediment yield for each grid cell and route the flow along its flow path to the watershed outlet. Furthermore, the model is capable of calculating the total runoff; erosion and sediment yield for the entire watershed by recursion algorithm. The validation of the model demonstrated that it could quantitatively simulate the spatial distribution of hydrological variables in a watershed, such as runoff, vegetation entrapment, soil erosion, the degree of soil and water loss. Moreover, it can evaluate the effect of land use change on the runoff generation and soil erosion with an accuracy of 80% and 75% respectively. The application of this model to a neighboring watershed with similar conditions indicates that this distributed model could be extended to other similar regions in China.  相似文献   

14.
Erosion caused by concentrated flows in agricultural areas is responsible for important soil losses, and rapid sediment transfer through the channel network. The main factors controlling concentrated flow erosion rates include the erodibility of soil materials, soil use and management, climate and watershed topography. In this paper, two topographic indices, closely related to mathematical expressions suggested by different authors, are used to characterize the influence of watershed topography on gully erosion. The AS1 index is defined as the product of the watershed area and the partial area‐weighted average slope. The AS2 index is similar to the AS1 but uses the swale slope as the weighting factor. Formally, AS2 is the product of the watershed area and the length‐weighted average swale slope. From studies made using different ephemeral gully erosion databases, it is shown that a high correlation consistently exists between the topographic indices and the volume of eroded soil. The resulting relationships are therefore useful to assess soil losses from gully erosion, to identify the most susceptible watersheds within large areas, and to compare the susceptibility to gully erosion among different catchments. This information is also important in studying the response of natural drainage network systems to different rainfall inputs. Copyright © 2005 John Wiley & Sons, Ltd.  相似文献   

15.
A computer model has been used to estimate soil loss and sediment yield from irregular field-size units of small watersheds. Input to the model includes spring data (i.e. relating to February through May) for the independent variables of the Universal Soil Loss Equation, and for factors such as surface roughness, an index of overland runoff, and proximity to the stream. Output from the model includes maps of seasonal estimates of potential soil losses, field sediment delivery ratios, and expected sediment yields. On the basis of selected erosion and sediment yield tolerances, the output information has been analysed to identify watershed areas which (1) exhibit both erosion and sediment yield problems; (2) exhibit only erosion problems; (3) exhibit only sediment yield problems; and (4) exhibit neither erosion nor sediment yield problems. The percentage of the watershed area in each category and the percentage of the watershed soil loss and sediment loads contributed by each category are also identified. Application of the procedure for planning remedial control programs for five watersheds is discussed.  相似文献   

16.
Water runoff and sediment transport from agricultural uplands are substantial threats to water quality and sustained crop production. To improve soil and water resources, farmers, conservationists, and policy‐makers must understand how landforms, soil types, farming practices, and rainfall interact with water runoff and soil erosion processes. To that end, the Iowa Daily Erosion Project (IDEP) was designed and implemented in 2003 to inventory these factors across Iowa in the United States. IDEP utilized the Water Erosion Prediction Project (WEPP) soil erosion model along with radar‐derived precipitation data and government‐provided slope, soil, and management information to produce daily estimates of soil erosion and runoff at the township scale (93 km2 [36 mi2]). Improved national databases and evolving remote sensing technology now permit the derivation of slope, soil, and field‐level management inputs for WEPP. These remotely sensed parameters, along with more detailed meteorological data, now drive daily WEPP hillslope soil erosion and water runoff estimates at the small watershed scale, approximately 90 km2 (35 mi2), across sections of multiple Midwest states. The revisions constitute a substantial improvement as more realistic field conditions are reflected, more detailed weather data are utilized, hill slope sampling density is an order of magnitude greater, and results are aggregated based on surface hydrology enabling further watershed research and analysis. Considering these improvements and the expansion of the project beyond Iowa it was renamed the Daily Erosion Project (DEP). Statistical and comparative evaluations of soil erosion simulations indicate that the sampling density is adequate and the results are defendable. The modeling framework developed is readily adaptable to other regions given suitable inputs. © 2017 The Authors. Earth Surface Processes and Landforms published by John Wiley & Sons Ltd.  相似文献   

17.
Sedimentation from soil erosion is a critical reservoir watershed management issue. Due to the difficulty of field investigations, empirical formulas are commonly used to estimate the soil erosion rate. However, these estimations are often far from accurate. An effective alternative to estimating soil erosion is to analyze the spatial variation of 137Cs inventory in the soil. 137Cs can be adsorbed by the soil and is widely assumed to change its distribution only when disturbed by rainfall and human activities. Thus, 137Cs distributed in soils can be a useful environmental tracer to estimate soil erosion. In this study, the net soil loss estimate is 108,346 t/yr and the gross erosion and net erosion rates are 10.1 and 9 t/ha yr respectively. The sediment delivery ratio is therefore estimated to be 0.9 based on the two erosion rates. Because of the steep hillsides in the watershed, only 10% of the sediment yield stayed in the deposition sites and 90% was transported to the river as the sediment output. Soil erosion estimates from spatial variations of the 137Cs activity in the Baishi river watershed showed satisfactory accuracy when compared to sediment yield data. Using soil 137Cs concentrations is therefore a feasible method for estimating soil loss or deposition in Taiwan. Data sampling, analysis and result of this approach are given in this paper.  相似文献   

18.
Most of the lowland in the central rift valley of Ethiopia is arid or semiarid and in degradation,with frequent occurrence of droughts.Soil erosion by water during the rainy season is a serious problem...  相似文献   

19.
A new, multi‐tracer method is used to track erosion, translocation, and redeposition of sediment in a small watershed, thus allowing for the ?rst time a complete, spatially distributed, sediment balance to be made as a function of landscape position. A 0·68 ha watershed near Coshocton, Ohio, USA was divided into six morphological units, each tagged with one of six rare earth element oxides. Sediment translocation was evaluated by collecting run‐off and by spatially sampling the soil surface. Average measured erosion rate was 6·1 t ha?1, but varied between 40·4 t ha?1 loss from the lower channels to 24·1 t ha?1 gain on the toeslope. With this technique it was possible for the ?rst time to itemize the sediment budget for landscape elements into three components: (1) the soil from the element that left the watershed with run‐off; (2) soil from the element that was redeposited on lower positions, with the spatial distribution of that deposition; and (3) soil originating from the upper positions and deposited on the element, with quanti?cation of relative source areas. The results are incongruous with the current morphology of the watershed, suggesting that diffusion‐type erosion must also play a major role in de?ning the evolution of this landscape. Copyright © 2004 John Wiley & Sons, Ltd.  相似文献   

20.
Abstract

A relatively simple process-oriented, physically-based distributed (PBD) hydrological model, the distributed runoff and erosion assessment model (DREAM), is described, and a validation study conducted in the semi-forested watershed of Pathri Rao, in the Garhwal Himalayas, India, is reported. DREAM takes account of watershed heterogeneity as reflected by land use, soil type, topography and rainfall, measured in the field or estimated through remote sensing, and generates estimates of runoff and sediment yield in spatial and temporal domains. The model is based on simultaneous solution of flow dynamics, based on kinematic wave theory, followed by solution of soil erosion dynamics. As the storm rainfall proceeds, the process of overland flow generation is dependent on the interception storage and infiltration rates. The components of the soil erosion model have been modified to provide better prediction of sediment flow rates and sediment yields. The validation study conducted to test the performance of the model in simulating soil erosion and sediment yield during different storm events monitored in the study watershed showed that the model outputs are satisfactory. Details of a sensitivity analysis, model calibration and the statistical evaluation of the results obtained are also presented and discussed. It is noteworthy that the distributed nature of the model combined with the use of geographical information system (GIS) techniques permits the computation and representation of the spatial distribution of sediment yield for simulated storm events, and a map of the spatial distribution of sediment yield for a simulated storm event is presented to highlight this capability.

Citation Ramsankaran, R., Kothyari, U.C., Ghosh, S.K., Malcherek, A., and Murugesan, K., 2013. Physically-based distributed soil erosion and sediment yield model (DREAM) for simulating individual storm events. Hydrological Sciences Journal, 58 (4), 872–891.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号