A micro-seismic network was used for monitoring the wreck of the Costa Concordia cruise ship, wrecked and run agrounded along the Giglio Island coasts during the night of 13 January 2012, until its removal. The seismic traces were processed by means of real-time and “a posteriori” procedures to detect transients that could be ascribed to wreck movements on the sea bed to integrate this information in an early warning system for assessing the wreck stability. After a first discrimination of the transients using amplitude criteria we proceeded to the localization of the detected signals to focus the attention only on the transients originated in the shipwreck resting area. The results showed that most of the events localized on the wreck were likely related to human work activities or sudden internal brittle failure but not to displacements on the seafloor. Instead, the displacements are associated to the impact on the vessel of great sea storms which approach were well correlated with the increasing seismic noise at low frequency. The carried out procedures based on this unique dataset represent an opportunity to test seismic monitoring techniques also in not usual engineering context to support emergency management activities. 相似文献
In a mountain environment, the transport of coarse material is a key factor for many fields such as geomorphology, ecology, hazard assessment, and reservoir management. Despite this, there have been only a few field investigations of bedload, in particular using multiple monitoring methods. In this sense, attention has frequently focused on the effects of “high magnitude/low frequency floods” rather than on “ordinary events”. This study aims to analyze the sediment dynamics triggered by three high-frequency floods (recurrence interval “RI” between 1.1 and 1.7 yr) that occurred in the Rio Cordon basin during 2014. The flood events were investigated in terms of both sediment mobility and bedload magnitude. The Rio Cordon is an Alpine basin located in northeastern Italy. The catchment has a surface area of 5 km2, ranging between 1763 and 2763 m above sea level. The Rio Cordon flows on an armored streambed layer, with a stable step-pool configuration and large boulders. Since 1986, the basin has been equipped with a permanent station to continuously monitor water discharge and sediment flux. To investigate sediment mobility, 250 PIT-tags were installed in the streambed in 2012. The 2014 floods showed a clear difference in terms of tracer displacement. The near-bankfull events showed equal mobility conditions, with mean travel distance one order of magnitude higher than the below-bankfull event. Furthermore, only the near-bankfull events transported coarse material to the monitoring station. Both events had a peak discharge up to 2.06 m3 s-1, but the bedload transport rates differed by more than one order of magnitude, proving that under the current supply-limited condition, the bedload appears more related to the sediment supply than to the magnitude of the hydrological features. In this sense, the results demonstrated that near-bankfull events can mobilize large amounts of material for long distances, and that floods of apparently similar magnitude may lead to different sediment dynamics, depending on the type and amount of sediment supply. 相似文献
The basic seismic load parameters for the upcoming national design regulation for DIN EN 1998-1/NA result from the reassessment of the seismic hazard supported by the German Institution for Civil Engineering (DIBt). This 2016 version of the national seismic hazard assessment for Germany is based on a comprehensive involvement of all accessible uncertainties in models and parameters and includes the provision of a rational framework for integrating ranges of epistemic uncertainties and aleatory variabilities in a comprehensive and transparent way. The developed seismic hazard model incorporates significant improvements over previous versions. It is based on updated and extended databases, it includes robust methods to evolve sets of models representing epistemic uncertainties, and a selection of the latest generation of ground motion prediction equations. The new earthquake model is presented here, which consists of a logic tree with 4040 end branches and essential innovations employed for a realistic approach. The output specifications were designed according to the user oriented needs as suggested by two review teams supervising the entire project. Seismic load parameters, for rock conditions of \(v_{S30}\) = 800 m/s, are calculated for three hazard levels (10, 5 and 2% probability of occurrence or exceedance within 50 years) and delivered in the form of uniform hazard spectra, within the spectral period range 0.02–3 s, and seismic hazard maps for peak ground acceleration, spectral response accelerations and for macroseismic intensities. Results are supplied as the mean, the median and the 84th percentile. A broad analysis of resulting uncertainties of calculated seismic load parameters is included. The stability of the hazard maps with respect to previous versions and the cross-border comparison is emphasized. 相似文献
The effects of irregularity in elevation of cross-laminated timber buildings have not been fully analysed in literature to provide useful information for the design. In this work, a number of building configurations, regular or irregular in elevation, characterized by a different arrangement per storey of the floor–wall joints have been analysed by means of non-linear dynamic analyses. Comparative results in terms of ratio between the behaviour q-factor of the investigated irregular configurations and that of reference regular ones, show that less dissipative capacity can be expected if the building is irregular due to a disequilibrium among storeys between the actual and the required strength provided by the floor–wall joints. A correlation method to estimate the behaviour q-factor for perfectly regular cross-laminated timber buildings is here presented and extended to in-elevation irregular ones. A new empirical formulation to assess the reliable corrective factor accounting for the irregularity in elevation of cross-laminated timber buildings, according to Eurocode 8 provisions, is also proposed. A final discussion about the implications of in-elevation irregularity on the building design is reported. 相似文献
The fronts of tunnels excavated under particularly difficult ground conditions by employing conventional tunnelling methods are commonly supported: the stabilization is usually achieved either by improving the mechanical properties of the soil (injections, jet grouting, soil freezing, etc.) or by introducing linear inclusions. This last technique, consisting in the introduction of pipes (usually made of fibreglass reinforced polymers) in the front, is particularly popular since it is very simple to adapt the reinforcement geometry, length and number to the different conditions encountered during the excavation. The design of this reinforcement technique is nowadays based on very simplified approaches: on either empirical formula or the limit equilibrium method. In a previous paper, the authors numerically studied the mechanical response of unreinforced fronts in cohesive soils and defined a non-dimensional front characteristic curve. In this paper, the authors intend to take into consideration the role of reinforcements by following the same approach. A procedure allowing the definition of the reinforced non-dimensional front characteristic curve, once the reinforcement pattern is assigned, is introduced. The practical use of this curve is described.
This paper investigates hydrothermal fluid circulation in pre- and syn-tectonic sediments associated with detachments faults. The study area, located in the Err Nappe (SE-Switzerland), preserves a portion of the Adriatic distal margin. Two sites were studied in combining fieldwork, petrography, geochemistry and fluid inclusion analysis: the Piz Val Lunga and Fuorcla Cotschna areas. Both preserve relationships between a spectacularly exposed rift-related extensional detachment fault and its footwall and hangingwall that consist of extensional allochthons and syn- to post-tectonic sediments. These areas register a complex fluid flow history characterized by dolomitization, de-dolomitization, calcite cementation, dolomite and quartz veining and diffuse silicification. Meso- and micro-scale observations allow defining two steps in fluid evolution, which are related to Jurassic rift activity. A first carbonate-rich event occurred before the exhumation of the granitic basement, and this was followed by a second event marked by a change in the fluid towards a silica-dominated chemistry. Homogenization temperatures of fluid inclusions (average Th = 120?130 °C), negative δ18O values and a radiogenic 87Sr/86Sr signatures of carbonate minerals support the hypothesis that both the pre-tectonic rocks constituting the allochthons and the syn-tectonic sediments overlying the detachment fault were crossed by a flux of over-pressured hydrothermal fluids originating from seawater that penetrated into the basement through fault and fracture systems. Field relationships show that this fluid circulation started latest in middle Early Jurassic time, when fault activity migrated from the proximal to the future distal margin. We propose that it evolved chemically as a result of the involvement of the granitic basement forming the footwall of the extensional detachment system. Hydrothermal activity continued until the Middle/Late Jurassic, when tectonic activity shifted outwards leading to the exhumation of mantle rocks. This paper provides an original contribution to better understand the complex evolution of hyperextended continental rift domains and to constrain their thermal regimes. 相似文献