首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   33篇
  免费   5篇
  国内免费   10篇
地质学   47篇
自然地理   1篇
  2022年   1篇
  2019年   1篇
  2017年   1篇
  2015年   1篇
  2013年   2篇
  2012年   2篇
  2011年   2篇
  2010年   1篇
  2009年   4篇
  2008年   1篇
  2007年   2篇
  2006年   2篇
  2005年   6篇
  2004年   2篇
  2003年   3篇
  2000年   1篇
  1999年   4篇
  1998年   2篇
  1997年   2篇
  1996年   3篇
  1995年   1篇
  1992年   2篇
  1984年   1篇
  1983年   1篇
排序方式: 共有48条查询结果,搜索用时 31 毫秒
31.
Factors underlying piping in the Basilicata region, southern Italy   总被引:1,自引:0,他引:1  
Piping/tunnelling erosion is a widely spread process in the Plio-Pleistocene marine clays of the Basilicata region in southern Italy. The pipes are often closely concentrated along the surface drainage networks at different depths with a tunnel (length) and a diameter varying from just a few centimetres to some metres. The formation and evolution of pipes in the badlands can be explained through: (1) geo-structural characteristics of the clay, (2) material properties such as a high exchangeable sodium percentage, (3) favourable climatic conditions, and (4) hydraulic gradient along the path controlled by the gully or ravine bottom that is acting as a local drain. The exposure and the extension of joints at the surface and in the bedrock along the slope are the main factors required for development of the pipes. The absence of the piping erosion on the slopes, where a reasonably thick layer of the soil material covers the open joints, shows that although certain material properties and climatic conditions play an important role, they are not sufficient to develop extensive piping erosion in the area.  相似文献   
32.
Summary  This paper is a contribution to the study of tunnelling in difficult conditions, with attention paid to large time-dependent deformations, which may develop either during construction, causing instabilities of the tunnel heading and of the face, or during the service life of the tunnel. Under these circumstances the construction costs may rise due to the delays in excavation time, the stabilisation and heavy support measures that need be adopted. Following a review of characterisation and modelling of time-dependent behaviour in rock, the mechanical behaviour of Clay Shales (CS), a structurally complex formation of the Apennines (Italy), is described. Then, the key factors involved in the selection of the constitutive model for CS are identified. Two constitutive models are selected and discussed and their specific material parameters determined. A case study of a large size tunnel is presented where numerical modelling by the finite difference method is carried out. The results of modelling are compared with the monitoring data in terms of radial convergence of the tunnel and extrusion of the tunnel face.  相似文献   
33.
Three-dimensional (3D) finite element analyses have been performed to study the behaviour of a single pile and 3 × 3 and 5 × 5 pile groups during open face tunnelling in stiff clay. Several governing factors, such as tunnelling-induced ground and pile settlement, axial pile force changes and shear transfer mechanism at the pile–soil interface, have been studied in detail. Tunnelling resulted in the development of pile head settlement larger than the free-field soil surface settlement. In addition, axial force distributions along the pile change substantially due to changes in the shear transfer between the pile and the soil next to the pile, which triggers tunnelling-induced tensile forces in the piles with tunnel advancement. It was found that the relative displacements and the normal stresses at the pile–soil interface drastically affected shear transfer. The extent of slip length along a pile increased as the tunnelling proceeded. The apparent allowable pile capacity was reduced by up to approximately 42% due to the development of tunnelling-induced pile head settlement. Shear stress on the pile was increased for most of the pile depth with tunnel advancement, which was associated with changes in soil stresses and ground deformation, and hence, the axial pile force was gradually reduced with tunnel advancement, indicating the development of tunnelling-induced tensile pile force. The maximum tunnelling-induced tensile force on the pile was approximately 0.33Pa, where Pa is the allowable pile capacity applied to the pile head prior to tunnel excavation. The range affected by tunnelling in the longitudinal direction may be identified as approximately −2D  +(1.5–2.0D), where D is the tunnel diameter, from the pile centre (behind and ahead of the pile axis), in terms of pile settlement and axial pile force changes based on the analysis conditions assumed in the current study. Larger pile head settlements and smaller changes in axial pile forces were computed for piles that were part of groups. It has been found that the serviceability of piles experiencing adjacent tunnelling is more affected by pile settlement than by axial pile force changes, in particular for piles inside groups. The magnitude of the tunnelling-induced excess pore pressure was small and may not substantially affect pile behaviour.  相似文献   
34.
Summary. In the planning and procurement phases of tunnelling projects, numerous decisions have to be made regarding tender price and budget. Many case studies have shown that, in practice, the predicted costs and time schedules are often exceeded. This paper describes a study of the various risk factors in machine tunnelling and their differing impacts on cost and time. It has been concluded from the study that it is important to make a clear distinction between normal cost and time, and the undesirable events that cause exceptional cost and time. Existing decision-aid estimation models consider variation of the risk factors, but do not consider normal cost or time separately from undesirable events. Usually, estimations of project cost and time are made in a deterministic manner, but this does not allow one to consider uncertainty in cost and time variables. However, if the variables are treated probabilistically, the total cost of tunnelling can be expressed as a distribution curve, and a decision can be made on the tunnelling method by comparing the respective cost and time distributions. Based on such decisions, the budget and tender price can be determined separately, both by the client and contractor respectively. To meet the demands placed on decision-making for tender and procurement for currently favoured construction-contracting methods, a new model for estimating tender price and budget has been developed, and is described in this paper. This estimating technique has been applied to a case study of the Grauholz Tunnel. The predictions obtained from the estimation model are shown to be realistic, as the total construction cost and time obtained from the model correspond fairly well to the actual construction cost and time. The separate estimation of normal cost and time and exceptional cost and time contribute to the clarity of the results. The use of the proposed model also shows that the tunnelling method most suitable for the actual geological and hydrogeological conditions can be selected by this method.  相似文献   
35.
Complementary Entropy and Wavelet Analysis of Drilling-Ability Data   总被引:1,自引:0,他引:1  
The paper combines wavelet and entropy analysis of nonstationary drilling-ability data in order to obtain optimum information on the mechanical behavior of different geological formations. Both methods are multiscale in nature, and while entropy analysis provides information on stationary subdomains, wavelet analysis identifies dominant scales or range of scales at which the entropy analysis is most useful. The combination of the techniques yields relatively simple results that can aid the drilling process by providing information on delays to be expected.  相似文献   
36.
简述了我国隧道及地下工程的发展,介绍了当前隧道及地下工程的施工方法、辅助工法,并提出了施工中应注意的有关重要问题。  相似文献   
37.
Summary Quick, simple, reliable, and inexpensive measurements of overbreak and underbreak are needed for proper evaluation of tunnelling by the drill and blast method. Problems causing rock damage can be identified and remedied while the work is still in progress. The measurements are also useful in identifying causes of overbreak and overbreak, and in helping to settle contractual disputes relating to payment for replacement concrete and secondary blasting of tights (zones of underbreak). A newly developed method to measure underbreak and overbreak is presented here. The light sectioning method (LSM) uses a radial sheet of light to define the tunnel profile. An image of the final tunnel profile is acquired and digitized, using digital image analysis. This profile is superimposed over the design profile, and from this zones of overbreak and underbreak are identified, quantified, and presented graphically.  相似文献   
38.
Parasnis has observed in a presidential address that geophysics is not a Popperian science in a major way. That is, hypotheses are not consciously put forth in a falsifiable format and much of the effort goes in seeking supporting evidence for favoured hypotheses. Parker evolved a parameter extremization strategy, initially to tackle the problem of non-uniqueness in geophysical inference. Later he based a hypothesis testing proposal on it, which is refreshingly Popperian. It has not been adopted widely, partly because it requires global extrema, and not local and this has been regarded as a problem with no solution. Attention is drawn towards tunnelling algorithm, which solves the problem of global optimization successfully, makes Parker’s Popperian proposal practical and extends the range of Popperian geophysics.  相似文献   
39.
Analysis of shield tunnel   总被引:1,自引:0,他引:1  
This paper proposes a two‐dimensional finite element model for the analysis of shield tunnels by taking into account the construction process which is divided into four stages. The soil is assumed to behave as an elasto‐plastic medium whereas the shield is simulated by beam–joint discontinuous model in which curved beam elements and joint elements are used to model the segments and joints, respectively. As grout is usually injected to fill the gap between the lining and the soil, the property parameters of the grout are chosen in such a way that they can reflect the state of the grout at each stage. Furthermore, the contact condition between the soil and lining will change with the construction stage, and therefore, different stress‐releasing coefficients are used to account for the changes. To assess the accuracy that can be attained by the method in solving practical problems, the shield tunnelling in the No. 7 Subway Line Project in Osaka, Japan, is used as a case history for our study. The numerical results are compared with those measured in the field. The results presented in the paper show that the proposed numerical procedure can be used to effectively estimate the deformation, stresses and moments experienced by the surrounding soils and the concrete lining segments. The analysis and method presented in this paper can be considered to be useful for other subway construction projects involving shield tunnelling in soft soils. Copyright © 2004 John Wiley & Sons, Ltd.  相似文献   
40.
廖一蕾  张子新  张冠军 《岩土力学》2011,32(Z2):256-260
从监测指标和监测范围两个方面对钱江隧道盾构进出洞加固体稳定性的实时判别进行了研究,即首先在分析板块理论和弹塑性静力学理论的基础上,提出能实时反映盾构进出洞加固体稳定性的监测项目,包括水土压力P及其相应的稳定性评价指标 、 ,而后采用理论分析和试验研究加固体的破坏模式,在此基础上,提出加固体实时监测点布置方案。通过监测点的合理布置,监测加固体所受水土压力P,计算 、 ,可实现加固体稳定性的实时评价  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号