排序方式: 共有14条查询结果,搜索用时 15 毫秒
11.
12.
A two-dimensional flow numerical model of the tidal reaches, which total length is more than 700 km, is established from Datong to the Yangtze River estuary. The tidal levels, velocities, diversion ratios and dynamic axes before and after the separate regulation of each reach and combined regulation of all reaches are obtained. The comparative analysis shows that the regulation project of a separate reach basically has no impact on velocity distributions and variations of diversion ratios of upper and lower reaches, the variations of dynamic axes are only within the local scope of the project. The regulation project of a separate reach also has less impact on the water level in the lower adjacent reaches, but will make the water levels in the upper reaches rise. After the implementation of the regulation projects for all reaches, the rise of water level in the upstream reaches will have a cumulative impact. 相似文献
13.
径流和潮汐对长江口盐水入侵影响数值模拟研究 总被引:6,自引:0,他引:6
影响长江口盐水入侵的主要动力要素是上游径流和外海潮汐.利用盐度实测资料验证了平面二维盐度数学模型.结果表明,实测资料和模拟结果相符,在此基础上进行了4种不同水文组合的模拟计算.通过计算结果分析,取得了长江口地区盐水入侵平面分布的基本规律. 相似文献