首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Few studies exist that investigate the potential impact of groundwater mounding due to mining near an environmentally sensitive area in a real world scenario. This paper presents a case study in which the development and extent of groundwater mounding due to mining near the Shark Bay World Heritage Property (SBWHP) in Western Australia (WA) has been simulated. A numerical model was developed that enabled a detailed simulation of groundwater level response to the discharge of a water saturated sand slurry during mining at the project site near Coburn in WA. The simulations showed that after a mining period of around two and a half years, a groundwater mound of around 2.5 m would develop along the margins of the open pit at the SBWHP boundary. 500 m further into the SBWHP, the groundwater mound is predicted to be around 1 m high. A depth to water analysis showed that the groundwater may come within 4 m of the surface in the area of a sand dune swale that traverses from SW to NE near the SBWHP boundary. The results of these analyses provide a perspective of mine-related impacts in a unique environment. The results have been included in an environmental impact assessment (EIA) and used for mine water balance predictions.  相似文献   

2.
The Narippara area, which is nestled in the Banasuramala of Wayanad district, witnessed initiation of landslide, which was manifested in the form of curvilinear cracks running for a length of 170 m. In the event of continuous rainfall, these cracks may get reactivated, leading to a major landslide. This could affect the life and livelihood of a large number of families living downslope and could cause extensive damage to property. Extensive mining for building stones in this area has been a cause for much concern amongst the local population. This study aims at understanding the impact of quarrying on slope stability through geotechnical, geophysical and environmental impact assessment (EIA). Geotechnical analysis shows that the area is stable under dry condition but parts of the area are critical under wet and saturated conditions. Moreover, resistivity studies revealed that the cracks that had developed extend up to the bedrock and the suspected mechanism of failure will be translational in nature. EIA reveal that due to quarrying and mining operations, the possibility of land disturbances cannot be ruled out during the monsoon season. In the present study, an attempt is also made to suggest management strategies for mitigating further effects of landslides in this area.  相似文献   

3.
An environmental impact assessment (EIA) study for the solid waste landfill was prepared for the Russeifa area, northeast Jordan. As landfill was not subjected to sophisticated EIA, serious environmental problems are still occurring, such as groundwater contamination and air pollution. Three alternatives were proposed to rehabilitate the landfill: upgrading the existing landfill, construction of a biogas plant and its relocation. The EIA for the three options was carried out using the rapid impact assessment matrix (RIAM), it applies a consistent and recordable assessment of the importance of the different components. The scoping components included in the RIAM were: physical/chemical, biological/ecological, social/cultural and economic/operational components. The RIAM analysis showed that the least negative impacts would be to relocate to a better-managed sanitary landfill. The most serious negative impacts were the contamination of groundwater, air pollution and public health. These impacts can be mitigated through a comprehensive environmental management plan for the Russeifa landfill to address the deterioration of environmental components in the vicinity of landfill.  相似文献   

4.
Mining operations threaten the environment if the monitoring and controlling steps are not implemented completely. One of the important methods for control of the environmental situation in the mining district is the environmental impact assessment (EIA) method, which is performed by matrix calculations. In this method, the environmental problem is broken into several parts as the Impacting Factors that is evaluated their influences on Environmental Components by the mathematical calculations. For these calculations, the weight of each Impacting Factor must be evaluated by using comprehensive scenarios that are involved all the predicable environmental issues. Based on literature, it has not been organized a comprehensive scenario about “Interference with groundwater” as an Impacting Factor yet. By consideration of the importance degree of groundwater and its role in supply the drinking water resource, it is felt to demand for an organization a developed scenario in relation with groundwater pollution in mining district. Therefore, the main aim of this study is developing a new scenario to weight the “Interference with groundwater” in EIA matrix. For this purpose, the 8 criteria and 63 subcriteria are defined and their weights are determined using the Fuzzy Analytic Hierarchy Process. The proposed scenario can be successfully evaluated the weight of “Interference with groundwater” Impacting Factor more exactly than the former one, because it considers 8 criteria and 63 subcriteria instead of 2 criteria in the former scenario. Finally, the application of proposed scenario is illustrated by an imaginary ideal case study. Such studies can be used by mining engineers and planners to design an appropriate environmental plan for the mining districts.  相似文献   

5.
娄昊  木日根 《世界地质》2013,32(3):606-611
矿山开发给矿区环境带来了负面影响,对矿山环境质量进行评价是实现矿业可持续发展的必要手段。笔者建立了矿山岩土工程环境质量多目标评价指标体系,运用层次分析法确定出各个评价指标的权重; 规定了分级规则,并对各个评价指标进行了分级; 建立了矿山岩土工程体系环境质量多目标综合评价模型,并将该模型应用于矿山实际,得出该矿山环境质量较差,需及时采取措施进行治理。  相似文献   

6.
基于GIS技术环境影响评价的研究进展及展望   总被引:5,自引:0,他引:5  
赵金平  焦述强 《新疆地质》2004,22(4):395-399
环境影响评价是确保经济社会发展与环境保护相协调的重要环节,传统环境影响评价(EIA)有很人的局限性,地理信息系统(GIS)以其强大的图形与数据处理功能在EIA上的应用,显示了其巨大的优势,介绍了在其基础上提出的数据库、模型库、方法库与GIS相结合的环境影响评价信息系统结构框图,在国内外学对GIS在环境影响评价研究现状分析的基础上,又对GIS在EIA中的研究前景做了展望。  相似文献   

7.
Environmental impact assessment is widely recognized as an effective tool for supporting the sustainable development of the environment through policy, plan and program decision-making processes. Traditional approach of environmental impact assessment generally focuses on scientific analysis and neglects subjective utilities on the project development. This paper proposes a framework of environmental impact assessment process by integrating subjective perception and scientific analysis. This framework suggests that environmental impacts and their consequent effects are analyzed and calculated based on the inventory analysis, but the non-market loss arising from the construction of the sensitive facility is estimated by contingent valuation method and the relative importance of affecting groups in affecting the ongoing of project development is evaluated by analytical hierarchy process. Eventually, a mathematical model is presented to determine the optimal compensation amount under a targeted refusal rate. Also, a case example is presented to illustrate this approach that integrates the objectively scientific assessment for potentially environmental impacts and individual subjective perception on the non-market value of environmental damages arising from the project development.  相似文献   

8.
西部开发中水资源利用可持续性评价   总被引:4,自引:0,他引:4       下载免费PDF全文
水资源可持续利用是西部开发的关键。本文就西部开发中水资源利用可持续性评价问题,从西部水资源对于全国的意义、西部水资源及利用现状两个方面论述水资源利用可持续性评价的重要性;提出将水资源评价纳入不同层次环境影响评价的方法;最后提出包括建立有效的水资源财产权结构、进行水资源价值核算、实施水资源利用总量控制和水资源补偿在内的可持续管理对策及有关技术措施。  相似文献   

9.
Environmental impact assessment (EIA) of any project is essential for understanding the sustainability of the project. For sustainable development of hill tracts, electricity is inseparable. Like other parts of Bangladesh hill tracts districts felt increasing demand of electricity. In this paper an attempt has been taken to present the existing environmental condition and analysis the future environmental condition after implementation of project. Electrification will extend the length of the active day. Electrification will improve security (people’s perception of safety and security) at the region. The elements of the project identified as components for analysis are chosen based on DOE’s guideline. The study showed that 87% people say that they feel safer at night since being electrified. Impacts are classified on the basis of EPA’s scaling and DOE, university’s teachers, NGOs expert’s opinions. Value more than 10 is classified significantly affected element of the project. In this paper advantages and disadvantages of the Electrification Project has been presented.  相似文献   

10.
This study provides an assessment of the environmental impact of open pit mining operations at the Cay Cham titanomagnetite-ilmenite deposit (northern Vietnam). The results of surface water sampling indicate the formation of acid mine drainage and contamination of adjacent areas by heavy metals (Cu, Zn, Ni, and Mn). The acid mine drainage is produced by oxidation leaching of sulfide minerals associated with primary mineralization owing to the low neutralization potential of the natural waters in the humid environment of tropical rainforest. The study showed that alternating dry and wet seasons typical of this climatic region promote the generation of stored acidity leading to a sharp decrease in pH of drainage water during the wet season and result in the negative impacts of this mine on both flowing and stagnant surface waters.  相似文献   

11.
通过一个环评实例阐述大型X射线医疗设备销售项目环境影响评价的基本分析要点,给出了正常工况下和事故工况下环境影响分析过程和剂量估算方法。大型X射线医疗设备销售的环境影响评价要点是:根据项目实际情况,确定污染因子和管理限值,采用类比、现场实测加计算的评价、预测方法,区分正常工况与事故工况,对污染进行分析、监测、计算和预测。  相似文献   

12.
Almost every country requires some form of environmental licensing prior to the inception of development projects that may affect the integrity of the environment and its social context. We developed a new conceptual and methodological model to instruct the assessment of the potential impacts posed by proposed projects. Susceptibility to Human Interventions for Environmental Licensing Determination (SHIELD) includes a novel geomorphological interpretation of the Environmental Impact Assessment (EIA). It considers the impact of human interventions on geomorphological processes and landscape functioning in the context of the entire ecosystem, going further than the classical concept of vulnerability. Estimated susceptibility of the site informs the screening stage, allowing local conditions to help define the criteria used in the process. Similarly, the level of detail of the environmental baseline is scoped by considering the degree of disturbance of natural processes posed by human intervention. Testing this geomorphological susceptibility model on different kinds of environments would allow shifting the environmental licensing practices from the prevailing anthropocentric and static conception of the environment towards an Ecosystem Approach. SHIELD addresses the need to improve the screening and scoping stages that form the basis of the rest of any EIA. SHIELD introduces several innovations to EIA including the incorporation of fuzzy logic, a preassembled database of contributions form experts, and a shifting of emphasis from the type of proposed intervention to the type of environment and its relative susceptibility.  相似文献   

13.
Intertidal (tidal flat) reclamation along the Chinese coastline, especially which is in Jiangsu Province, has increased markedly in recent years. However, the hydrodynamic disturbance and environmental impacts of this activity are not yet fully understood. In this study, a process-based depth-averaged model is used to evaluate quantitatively the possible impacts of intertidal reclamation for the southern Yellow Sea region. The simulation results show that reclamation of both inshore and offshore intertidal areas of ~1800 km2 (according to the approved governmental reclamation scheme) would result in three remarkable changes in tidal patterns: enhanced M2 and M4 tidal amplitudes in coastal areas, strengthened negative tidal asymmetry in the southern region of the sand ridge system, and an enhanced tidal energy flux toward offshore through the main channels in the south. These changes would result in some negative impacts. The enhancement in local tidal amplitude could increase the probability of coastal hazards, and the offshore sediment transport tendency resulting from negative tidal asymmetry in the south could lead to severe erosion. The enhanced energy flux transported offshore may also affect far-field regions. On the other hand, alternative reclamation of ~400 km2 of offshore intertidal area could significantly minimize hydrodynamic disturbances to the local tidal system. Offshore reclamation with lower environment impacts may be the future for coastal development. To cope with the potential environmental risks caused by reclamation, it is recommended to strengthen environmental impact assessment and overseeing of reclamation plans, and advance international cooperation in terms of coastal management. Our findings provide a reference for coastal management in countries with substantial areas of tidal flats.  相似文献   

14.
The proposed flood mitigation measures in the Slovak Republic are subject of environmental impact assessment (EIA) process before its approval. The paper elaborates and demonstrates the application of the risk analysis method for evaluating alternatives, which is core in EIA. Risk analysis is an appropriate tool to determine the level of the risk of the proposed flood mitigation measures and through which it is possible to choose the alternative with the lowest level of risk for the environment. The article presents the application of the developed methodology based on universal matrix of risk analysis in ?iba village that is in existing flood risk. It analyses and discusses the results of the impact assessment from EIA practice in the Slovakia. The aim of the work is to improve existing qualitative and quantitative methods for assessing the impacts of proposed activities on the environment. Developed methodology stimulates creative approaches in searching of the best alternative to proposed activities (constructions) that are environmentally friendly. Innovation in this paper is presented by an implementation of universal matrix of risk analysis for flood mitigation measures (developed by the authors) for the purposes of EIA process.  相似文献   

15.
深海多金属结核广泛分布于全球海底,资源储量丰富、开采潜力巨大。自20世纪60年代,围绕深海多金属结核开采提出了连续链斗式、穿梭艇式、管道提升式等的采矿方式,目前研究中多以管道提升式研究为主。将赋存在海床沉积物表面的多金属结核开采出来必然会引起表层沉积物的扰动,从而影响海水化学性质及海洋生物活性。国内外学者围绕深海多金属结核开采,从结核的资源储量、矿区工程地质条件、开采技术、环境影响等方面展开了诸多研究。基于国内外大量文献资料,着重整理了深海多金属结核富集区CC区(东太平洋的克拉里昂—克里帕顿断裂带之间的海底区域)的研究进展。针对以管道提升式开采方式开采深海多金属结核产生的潜在工程地质环境影响得到以下几点认识:(1)结核开采过程中对表层沉积物产生扰动致使沉积物发生再悬浮,再悬浮颗粒浓度是影响海水化学性质、海洋生物活性的主要原因;(2)矿区表层沉积物的工程地质性质是深海多金属结核开采过程中生态环境影响程度的关键控制因素,其决定了结核开采时沉积物再悬浮的质量、空间分布特征;(3)目前多金属结核开采的环境影响评价多基于对生物群落的影响程度进行定性的评价,尚未有基于沉积物工程地质性质变化、再悬浮沉积物时空分布规律进行的环境影响评价,未来深海多金属结核开采环境工程地质影响定量评价系统有待建立。以上认识对于深入了解多金属结核开采研究现状、工程地质环境影响特征、监测环境影响内容有重要意义。  相似文献   

16.
范光  温志坚 《国外铀金地质》2010,(4):229-232,238
矿产开发过程中的辐射环境影响日益被管理部门和广大公众所重视。针对我国南方某铜矿开采项目,在详细工程分析和现状调查的基础上,对铜矿开采可能带来的辐射环境影响进行了细致分析,预测和评价项目建设对辐射环境的可能影响,并针对性地提出环境保护措施。相关结论和措施对于铜矿资源合理开发和保护环境具有指导意义。  相似文献   

17.
Mining activities have left huge uncovered slopes, large areas of gangue ground and extensive railings dams. In this paper, we studied some impacts of mining activities upon environment in Panzhihua region, southwestern China. The environmental impacts include ecological destruction, geological disasters, environmental pollution, land damage, solid waste and occupational health effect in study area. The author suggested that local government should take some measure to reduce environmental impact in Panzhihua City. First, the countermeasure of reducing environmental impact is to set up ecological rehabilitation and environmental management system, which ensure the sustainable development of resources, environment, economy and society in this region. Second, the area needs to be monitored regularly for trace metal and other pollutants to forewarn urban eco-environmental safety.  相似文献   

18.
Eran Feitelson 《Geoforum》1996,27(4):527-537
While many studies have analyzed EIS procedures, only a few have analyzed EISs as part of the development process. When viewed from this perspective, EISs are shown to have a skewing effect on territorial development; they address mainly infrastructure projects, and consequently delay them, but hardly touch any of the residential projects which the infrastructure is designed to serve. This discrepancy can have deleterious consequences due to residential encroachment on various infrastructure facilities, as well as due to the growing shortfall of transport and environmental infrastructure. When EISs are analyzed in terms of project area, areas where impacts and benefits are felt, and administrative control zones, it becomes apparent that the impacts and benefits analyzed may be affected by the spatial scope of administrative control and project areas. A case in point is the ‘Kalanit’ landfill in Israel. Here the benefit and impact areas analyzed in the EIS were affected by the jurisdiction of the committee that requested the EIS and to which it was submitted. This discrepancy between benefit, impact and administrative control areas is also at the source of the emerging interest in cross-boundary EIA.  相似文献   

19.
This article argues that insufficient attention has been paid in the recent literature to the social and environmental factors which regulate hunting in Ghanaian savannas, and to how this may influence the sustainability of their livelihoods. Despite the vital significance of this issue, the emphasis in the literature and media has been on the destructive impacts of hunting and the bushmeat trade on wildlife. Taking a case study from the coastal savanna of Ghana, a region commonly regarded as a degraded relict of former deciduous forest with a richer wildlife past, it investigates the hypothesis that structure/actor dualities, manifested by socio-cultural change, local environmental knowledge and livelihood activity options, are the primary regulators of hunting intensity and possible sustainability. Such an evaluation is effective if done from a structuration perspective. The integrated methodology incorporates social surveys, GIS based time series image analysis, ecological field methods and statistical analysis. The results provide evidence that the direct and indirect regulatory functions of the socioenvironmental context provide a core feature of the sustainability of hunting. It is concluded that local strategies of resource management may provide an effective complement to conservation policy.  相似文献   

20.
Surface mining and quarrying typically generate a considerable number of environmental impacts among which landscape alteration remains one of the most significant. Although landscape alteration does not directly affect public health, it may produce an adverse reaction among potential observers and compromise the use and potential growth of the surrounding territory. In order to assess the impact produced by surface excavation, some aspects of landscape modification can be objectively measured, such as the extent of the visible alteration, its shape and the chromatic contrast with the surroundings. With reference to a case study located in Sardinia, this article discusses the implementation of two different visual impact assessment methods, one defined by the EC decision 272/02 (Commission Decision 2002), the other previously proposed by the authors of the present article and based on the estimation of the impact indicator Lvi (level of visual impact). The comparison of the results proves that the method established by the EC decision leads to the underestimation of the visual impact for alterations which are significantly wider than their height. On the other hand, the implementation of the Lvi method clearly shows how the indicator is affected by the quarry’s lateral extent and suggests the possibility of calculating a global impact factor LVI to be associated to a given route, considering the variability of the visual impact with the curvilinear abscissa of the route itself.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号