1.
Based on the design principles of economic rationality and safety, multiple-pivot pile anchorage approach was used as the supporting engineering of a tall building with a deep foundation ditch. The designs, such as anchor arm, single pile and the whole, were set up in accordance with the calculations of the internal force from the equivalent beam and Yamagata Kunio methods. Moreover, the rationality of the design was estimated using the stability checks. FLAC3D was used for calculating the accuracy of the design. Using FLAC3D to simulating ditch cutting and supporting processes can obtain the equivalent results as the theory analysis in the displacement of ditch surrounding wall, the stress field and stress distribution.  相似文献   

2.
为了研究软岩地基桥桩的荷载传递性状、破坏机理,并获取在该地质条件下更为可靠的桩基计算参数,对秦巴山区软岩地基3根钻孔灌注试桩进行竖向静载试验.结果表明:秦巴山区软岩地基桥桩试桩荷载沉降曲线呈陡降型,实测竖向极限承载力为20500kN,桩的破坏方式为桩身材料强度破坏;淤泥质亚黏土地层中的碎石起到一定的骨架作用,增强了此地层桩极限侧阻力,发挥极限侧阻力所需的桩土(岩)相对位移为4~8mm;强风化砾岩表现为加工软化型,发挥极限侧阻力所需的桩土(岩)相对位移为3~8mm;中风化砂砾岩表现为明显的加工硬化型,所需的桩岩相对位移大,且桩极限侧阻力的特征点不明显;淤泥质亚黏土地层桩侧阻力占总荷载的60%~70%,随着桩顶荷载的逐步加大,该地层桩侧阻力所占比例不断下降,而嵌岩段桩侧阻力所占比例逐渐上升,达到55%~65%,嵌岩段桩侧阻力沿桩深的分布曲线表现出非线性的特征;试桩为端承摩擦桩,桩端阻力约占桩顶荷载的20%左右,且未充分发挥,在上部结构允许的沉降范围内,适当增加桩端的沉降有利于端阻力的发挥;桩侧阻力先于端阻力发挥,建议单桩承载力设计时分别采用不同的端阻力和侧阻力安全系数.  相似文献   

3.
In the current theory of bridge foundation design,all of the loads above the cap are loaded by the pile,and the bearing capacity of the soil among piles is not taken into account.In order to analyze the bearing capacity of the soil among piles in bridge pile foundation,a model of pile foundation is established based on a bridge foundation which is under construction,and by the finite element analysis software ANSYS.According to the results of finite element analysis(FEA)and current bridge foundation design theory,a feasible composite pile foundation which can be applied in the design of bridge foundation,is recommended.Additionally,a number of modifications are made to the original design.It was confirmed that these modifications derived from numerical simulations can improve the performance of the foundation.  相似文献   

4.
随着我国公路建设不断向山区深入, 在地质构造复杂区公路边坡遇到断层破碎带的情况日渐增多, 亟需开展阻滑能力强的抗滑桩结构加固边坡研究。传统的人工挖孔桩施工模式存在高风险、低效率等缺点, 而组合式圆截面抗滑桩具有施工效率高、安全便捷等特点, 为此, 探究其对含断层破碎带边坡的加固效果具有现实意义。采用自主设计的边坡物理试验系统, 设计了5种不同破碎带厚度与组合式圆截面抗滑桩组合的物理模型, 采用坡顶逐级加载的方式模拟加载, 监测桩身应变、桩顶位移和桩后土压力, 采用高速相机捕捉滑体变形破坏图像, 并使用粒子图像测速(PIV)技术对图像进行处理。研究结果表明: 组合式圆截面抗滑桩通过限制桩后滑体水平位移, 并将滑体限制在前、后排桩间来达到加固边坡的效果; 滑体演化分为变形压密、加速变形和破坏滑移3个阶段; 前、后排桩桩后土压力比值介于1/3~1/2之间; 随断层破碎带厚度增加, 滑体水平滑移速率增大, 组合式圆截面抗滑桩的桩顶位移增大, 桩身最大正弯矩减小。模型试验与数值模拟计算的弯矩及桩顶位移较为吻合, 研究成果可为边坡工程组合式圆截面抗滑桩设计提供一定借鉴与参考。   相似文献   

5.
Xigeda formation is a type of hundred-meter-thick lacustrine sediments of being prone to triggering landslides along the trunk channel and tributaries of the upper Yangtze River in China. The Yonglang landslide located near Yonglang Town of Dechang County in Sichuan Province of China, which was a typical Xigeda formation landslide, was stabilized by anti-slide piles. Loading tests on a loading-test pile were conducted to measure the displacements and moments. The uncertainty of the tested geomechanical parameters of the Yonglang landslide over certain ranges would be problematic during the evaluation of the landslide. Thus, uniform design was introduced in the experimental design, and by which, numerical analyses of the loading-test pile were performed using Fast Lagrangian Analysis of Continua (FLAC3D) to acquire a database of the geomechanical parameters of the Yonglang landslide and the corresponding displacements of the loading-test pile. A three-layer back-propagation neural network was established and trained with the database, and then tested and verified for its accuracy and reliability in numerical simulations. Displacement back analysis was conducted by substituting the displacements of the loading-test pile to the well-trained three-layer back-propagation neural network so as to identify the geomechanical parameters of the Yonglang landslide. The neural-network-based displacement back analysis method with the proposed methodology is verified to be accurate and reliable for the identification of the uncertain geomechanical parameters of landslides.  相似文献   

6.
研究抗滑桩的受力特征是进行抗滑桩设计工作的关键。我国三峡库区部分堆积层滑坡发育多层滑带,而目前抗滑桩的设计方法仅针对单层滑坡,因此,对多层滑带堆积层滑坡—抗滑桩受力特征的研究具有重要意义。基于三峡库区堆积层滑坡工程地质特征,开展了多层滑带堆积层滑坡物理试验模型,在滑坡的后缘施加推力来模拟滑坡演化过程,同时监测滑坡—抗滑桩体系的多场信息。试验结果表明,在多层滑带堆积层滑坡的演化过程中,桩身受力表现出了很好的规律性。根据坡表位移的变化趋势,将滑坡演化分为4个阶段,在此基础上对桩身受力进行分析。滑坡推力分布图式中出现了4个极大值,土体抗力分布图式中出现唯一最大值,该试验结果为抗滑桩的设计提供了一定的理论支持。   相似文献   

7.
锚索抗滑桩是滑坡的主要支护结构之一。目前, 软硬相间地层条件下锚索抗滑桩的受力与变形特征尚缺乏系统研究。以软硬相间地层为地质背景, 基于自主研发的柔性测斜仪和自动加载系统, 构建了锚索抗滑桩加固滑坡物理模型试验系统, 开展了锚索抗滑桩加固滑坡的物理模型试验, 揭示了推力不断增加过程中抗滑桩、锚索和滑体的变形与受力特征, 对比研究了布锚方式对桩-锚受力与变形的影响规律, 通过数值模拟的方法分析了软硬相间地层对锚索抗滑桩的影响机理, 并以双锚点抗滑桩为例进行了理论分析。研究结果表明: ①在滑坡-锚索抗滑桩体系中, 桩身各点位移和滑体深部位移均随桩身深度的增加而减小, 滑体后部位移速率大于中部, 且滑体位移速率大于桩身位移速率; ②单锚点抗滑桩的桩-锚推力分担比经历了4个阶段的变化, 趋于稳定时桩-锚推力分担比约为9∶1, 锚索拉力作用下桩身弯矩呈"S"型分布, 正负弯矩非对称; ③锚固角度越大, 锚索拉力的增速越大, 不同锚固角度对桩身内力值的影响主要体现在受荷段; ④多锚点抗滑桩结构的锚索分担更多的推力, 与单锚点抗滑桩相比, 双锚点与三锚点抗滑桩的最大桩身弯矩分别减小了22.41%和40.55%;⑤与均质地层相比, 软硬相间地层中软、硬岩交界面处基岩应力发生突变, 不同软岩厚度比和桩底是否嵌入硬岩, 均对锚索拉力和桩-岩之间的相互作用有不同程度的影响; 其次, 双锚点抗滑桩内力的理论值与试验结果较为接近。本研究成果可为软硬相间地层中锚索抗滑桩加固滑坡工程的优化设计提供依据。   相似文献   

8.
新乡市染织厂 9号住宅楼基础工程 ,属于一个典型的老城区改造工程实例。拟建工程场地的环境地质条件很差 ,不能满足建筑设计与施工要求。在分析岩土工程地质资料和深层搅拌桩设计、施工技术的基础上 ,选择水泥喷浆桩复合地基进行处理并获成功 ,取得了良好的社会效益和经济效益。水泥喷浆桩复合地基处理在新乡市区首次应用成功 ,显示了地基处理施工、设计单位的技术实力  相似文献   

9.
The authors tested the percussion-extruding Down-the-hole(DTH)hammer bit with five different structures and mainly analyzed the drilling mechanism between conical bit and stepped bit. In addition, aiming at "the pile effect" in combination with the advantage of stepped bit, we design a new cam spinning bit and test it outdoors. The result shows that using cam spinning bit can solve the problem of "the pile effect", which can also obtain higher drilling efficiency than using conical bit in high confining pressure strata. It is characterized by novel structure and high drilling speed as well as good guiding, and it is significant for improving efficiency in percussion-extruding drilling technique.  相似文献   

10.
文章通过对某工程实例的分析,说明建筑物桩基形式的合理选择,必须综合考虑设计要求、场地工程地质、水文地质的具体情况以及施工设备、工艺的适应性,才能确保桩基工程质量并最终节约建筑成本.  相似文献   

11.
利用有限元法考虑桩土的变形协调 ,分析了在黄土地基中承台 -桩 -桩间土共同作用的机理 ,得到了若干规律 ,对实际工程设计具有实用意义和参考价值  相似文献   

12.
干振碎石桩是处理松软地基土的一种行之有效的方法,它是挤密桩的一种。新乡市地方铁路处仓库场地经干振碎石桩地基处理后,桩间土密实度有明显的提高,液化指数大幅度降低,复合地基承载力相应提高,满足了设计要求。  相似文献   

13.
以济南市某大型深基坑工程为依托,通过FLAC3D对深基坑工程不同施工阶段的变形特性进行了数值计算分析;桩锚支护深基坑,地表最大竖向变行产生在距离基坑边缘10 m位置处,且最大竖向变形量为46.16 mm;最大水平位移发生在桩顶冠梁位置处,最大水平位移为53.45 mm,是基坑支护最薄弱环节,基坑呈现三角形状向内侧滑动的趋势。  相似文献   

14.
利用振动工程中的模态分析技术,对桩基系统的振动特性进行研究。根据桩基系统的集中质量参数振动模型,对完整桩和各种缺损桩模型的导纳谱进行了大量的正演计算,按照导纳谱特征与桩基的缺损类型及缺损位置之间的对应关系,编制了相应的判读软件DSP1.0系统,实现了桩基完整性以及缺损桩缺损位置和缺损性质的计算机自动判读。  相似文献   

15.
Stabilizing pile is a kind of earth shoring structure frequently used in slope engineering. When the piles have cantilever segments above the ground, laggings are usually installed to avoid collapse of soil between piles. Evaluating the earth pressure acting on laggings is of great importance in design process. Since laggings are usually less stiff than piles, the lateral pressure on lagging is much closer to active earth pressure. In order to estimate the lateral earth pressure on lagging more accurately, first, a model test of cantilever stabilizing pile and lagging systems was carried out. Then, basing the experimental results, a three-dimensional sliding wedge model was established. Last, the calculation process of the total active force on lagging is presented based on the kinematic approach of limit analysis. A comparison is made between the total active force on lagging calculated by the formula presented in this study and the force on a same-size rigid retaining wall obtained from Rankine's theory. It is found that the proposed method fits well with the experimental results. Parametric studies show that the total active force on lagging increases with the growth of the lagging height and the lagging clear span; while decreases as the soil internal friction angle and soil cohesion increase.  相似文献   

16.
为研究能源群桩工作特性,基于Abaqus有限元模拟,将换热稳定阶段的平均温度赋予桩体进行稳态热-力耦合计算,提出了能源群桩承载特性的简化分析方法,并通过与现场数据的对比分析,验证了该研究方法的可行性。结合算例,进一步利用该方法对纯力学荷载和热-力耦合作用下的能源群桩的承载特性进行了分析。结果表明:①群桩基础中能源桩分散对称分布的不均匀沉降要明显小于集中分布,而且分布形式对桩基结构响应特征影响较大;②桩基等刚度下,增大桩径和减小桩间距,群桩倾斜控制效果较好。研究成果可以为能源群桩的工程应用提供一定的参考。   相似文献   

17.
This paper aims to present a theoretical method to study the bearing performance of vertically loaded large-diameter pipe pile groups. The interactions between group piles result in different bearing performance of both a single pile and pile groups. Considering the pile group effect and the skin friction from both outer and inner soils, an analytical solution is developed to calculate the settlement and axial force in large-diameter pipe pile groups. The analytical solution was verified by centrifuge and field testing results. An extensive parametric analysis was performed to study the bearing performance of the pipe pile groups. The results reveal that the axial forces in group piles are not the same. The larger the distance from central pile, the larger the axial force. The axial force in the central pile is the smallest, while that in corner piles is the largest. The axial force on the top of the corner piles decreases while that in the central pile increases with increasing of pile spacing and decreasing of pile length. The axial force in side piles varies little with the variations of pile spacing, pile length, and shear modulus of the soil and is approximately equal to the average load shared by one pile. For a pile group, the larger the pile length is, the larger the influence radius is. As a result, the pile group effect is more apparent for a larger pile length. The settlement of pile groups decreases with increasing of the pile number in the group and the shear modulus of the underlying soil.  相似文献   

18.
田湾核电站某工程偏移基桩性状分析   总被引:1,自引:1,他引:0  
用低应变动测法检测基桩结构完整性,其测试结果是可靠的,但在田湾核电站某子项用低应变对因滑坡而倾斜的基桩进行检测时,却发现同样是偏移较大的基桩,有的基桩断裂、破损,有的完整,从低应变测试结果很难与实际情况统一起来。考虑到基桩不是孤立的,是与地基土结合在一起的,通过利用基坑支护理论及滑坡形成的圆弧滑动面原理,并结合施工的一些实际情况,从理论上分析了滑坡后基桩断裂、破损、倾斜的可能性,从而对偏移基桩性状做出了正确判断,为工程桩的处理提供依据。  相似文献   

19.
新乡医学院教学大楼基础工程,经过充分论证,将原设计预制桩基础,改用粉喷桩法进行地基处理,并注重生产前试验,优化设计、严格施工。经检测,复合地基处理满足设计要求,节约了投资,缩短了工期,保证了大楼建筑按时投入使用,取得了良好的社会效益和经济效益。  相似文献   

20.
The authors tested the percussion-extruding Down-the-hole (DTH)hammer bit with five different structures and mainly analyzed the drilling mechanism between conical bit and stepped bit. In addition, aiming at "the pile effect" in combination with the advantage' of stepped bit, we design a new cam spinning bit and test it outdoors. The result shows that using cam spinning bit can solve the problem of "the pile effect", which can also obtain higher drilling efficiency than using conical bit in high confining pressure strata. It is characterized by novel structure and high drilling speed as well as good guiding, and it is significant for improving efficiency in percussion-extruding drilling technique.  相似文献   