首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
为减轻海上风电单桩基础周围局部冲刷对其结构安全的影响,提出了一种新型旋转减冲装置。在波流水槽中开展物理模型试验,改变波流条件、装置安装高度、安装距离,记录桩周冲刷发展历时,运用激光地形仪扫描冲刷坑形态,分析各工况下冲刷坑形态差异,验证装置不同安装距离、安装高度下的冲刷防护效果,提出了不同安装位置下的防护效率公式。结果表明:新型旋转减冲装置具有较好的冲刷防护效果,本试验工况下,桩周最大冲刷深度可减小44%左右。装置安装距离对冲刷防护效果影响较小,波流作用下的冲刷防护效果受装置安装高度影响显著,冲刷防护效果随装置安装高度的增加而减弱。  相似文献   

2.
在江苏大丰某海上风电场选取代表机位,安装桩基局部冲刷实时监测系统对桩基周围海床进行实时监测,并和多波束水下地形测量成果进行对比分析。结果表明:该系统实时监测效果较好,与多波束的测量结果相吻合,其最大优势在于能长期实时连续监测桩基周围海床的高程变化情况,掌握长期冲淤趋势。监测桩基海床已产生最大冲刷深度达8 m 的冲刷坑,为保障风机系统的安全稳定,建议及时采取冲刷防护措施,以防冲刷坑进一步发育。  相似文献   

3.
为了验证新型伞式吸力锚基础的防冲刷效果,本文利用Flow-3D软件建立三维海床-吸力锚-波浪相互作用模型,基于JONSWAP随机波浪谱,结合某海域风区资料模拟随机波,对随机波浪作用下伞式吸力锚基础(USAF)局部冲刷演变进行分析,试验土体为非黏性土.首先探讨了随机波浪作用下基础周围流场变化规律和冲刷演变模式,其次分析了...  相似文献   

4.
The obstruction to flow around a pile placed in an erodible seabed causes scour leading to changes in the bed elevation in the vicinity of the pile. In the present investigation, scour around piles induced by the seabed current has been studied in a wave flume using model piles of diameters 50, 90 and 110 mm embedded in a silty clay soil bed. The particulate movement due to scour is time dependent and in case of sediments with particle sizes ranging upto clay fractions, the measurement of scour becomes extremely difficult. This paper presents a simplified experimental technique for the measurement of scour depth with time around a pile foundation in a silty clay soil.  相似文献   

5.
Understanding the sediment transport and the resulting scour around coastal structures such as pile breakwaters under local extreme wave conditions is important for the foundation safety of various coastal structures. This study reports a wave-flume experiment investigating the scour induced by solitary waves at a pile breakwater, which consists of a row of closely spaced large piles. A wave blacking gate with a simple operation procedure in the experiment was designed to eliminate possible multiple reflections of the solitary wave inside the flume. An underwater laser scanner and a point probe were used in combination to provide high-resolution data of the bed profile around the pile breakwater. Effects of incident wave height and local water depth on the maximum scour depth, the maximum deposition height and the total scour and deposition volumes were examined. An existing empirical formula describing the evolution of the scour at a single pile in current or waves was extended to describe the scour at the pile breakwater under the action of multiple solitary waves, and new empirical coefficients were obtained by fitting the formula to the new experimental data to estimate the equilibrium scour depth. It appears that the maximum scour depth and the total scour volume are two reliable quantities for validation of numerical models developed for the scour around pile breakwaters under highly nonlinear wave conditions.  相似文献   

6.
海上风电基础局部冲刷会影响风电结构的稳定,对海上风电的安全运行至关重要。以四腿群桩导管架基础为研究对象,对潮流条件下基础局部冲刷开展试验研究。试验结果表明:0°水流条件下,最大冲刷深度为1.05倍桩径;45°水流条件下,最大冲刷深度为0.97倍桩径。并探索了新型蜂巢结构在群桩基础防冲刷中的应用,设计了蜂巢格室防护方案,发现在蜂巢防护情况下,两个流向作用于四腿群桩基础时最大冲刷深度仅为无防护情况下的27.3%和25.9%,表明蜂巢格室在海上风电基础的冲刷防护方面具有良好效果,在实际工程中具有较大的应用潜力。  相似文献   

7.
基于水槽实验,研究植物对孤立波作用下直立堤局部冲刷的影响。通过改变实验入射波高、植物带的宽度和密度,分析各要素对直立堤局部冲刷的影响。实验对波高沿程变化、孤立波越堤、回落过程以及地形演变进行全程的测量和记录,并进行有无植物带保护的直立堤局部冲刷对比分析。结果表明,植物带的存在,使得堤后相对最大冲刷深度显著减小,堤前冲刷形态由单峰式"L"型变为双峰式淤积沙坝形态,且冲刷位置由原堤脚前移至植物带所在位置,冲刷范围大幅增加。减小植物带密度或者植物带宽度会使近岸侧或是离岸侧的相对最大冲刷深度和相对最大淤积高度有增大的趋势,但是当入射波高增大时,二者的影响不显著。该研究对实际工程中植物带的合理布置提出了具有参考性的建议,对减少堤防工程的冲刷和损失有一定现实意义。  相似文献   

8.
桥墩基础冲刷是桥梁毁坏的重要因素,是桥梁基础设计的关键指标之一。目前国内外对于桥墩基础在复杂动力条件下冲刷深度的研究常采用物理模型试验方法,利用正态系列模型方法,在波流水槽中研究了水流、潮流和波流共同作用下青州航道桥索塔基础周围流态变化和局部冲刷特征。研究结果表明,桥墩最大冲刷深度和冲淤范围与水流流速、桥墩轴线与水流夹角和波浪等因素有关;在潮流最大流速和恒定流流速一致情况下,桥墩局部冲刷深度达到平衡后,将会达到与恒定流基本一致的最大冲深;波流共同作用下的最大冲刷深度比恒定流增加10%左右。设计桥墩形状在100年一遇水流和波浪共同作用下桥墩基础局部最大冲刷深度为13.7 m。  相似文献   

9.
潘冬冬  李健华  周川  王俊 《海岸工程》2020,39(4):271-278
海上风电场桩基局部冲刷是工程设计与运行阶段的重要参数之一。基于湛江某海上风电场桩基3次现场局部冲刷实测数据,进行冲刷坑最大深度、冲刷坑半径和冲淤变化特征的分析与研究;根据桩基局部冲刷经验公式,采用工程海域实测海洋水文动力学数据进行最大冲刷深度与冲刷半径的计算,并进行公式计算值的对比与分 析。结果表明:桩基础在防冲刷设施的保护下,3次实测最大冲刷深度基本稳定为4.0 m,最大冲刷深度与桩径之比为0.57。而经验公式的最大冲刷深度与桩径之比均超过了1.1,说明桩基防冲刷设施取得了一定的效果,冲刷坑半径的计算值与现场实测值吻合较好。建议海上风电场在运行阶段进一步加强桩基冲刷坑监测与防护。  相似文献   

10.
在设计结构和考虑有效的海洋工程基础的冲刷防护工程时,了解和预测海洋结构周围的冲刷发展机理是非常重要的。通过波流水槽研究规则波作用下桶形基础的冲刷特性,试验主要考虑波高与结构尺寸对桶形基础周围局部冲刷的影响,并分析波浪冲刷过程中模型周围的时程地形、波浪作用后的冲刷坑性状、冲刷影响要素以及不同结构间的冲刷差异。结果表明:桶形基础的冲刷过程是震荡加深发展,最大冲刷深度与冲刷宽度随波高增大而增加,随上部结构直径增大而增加,最大冲刷深度位置随波高与结构尺寸变化而变化;不同结构间的冲刷坑形态与冲刷后的地形不同,最大冲刷深度相差可高达4倍;桶形基础结构直径比范围为0.2~0.5时,结构自身具有防冲刷能力。  相似文献   

11.
Transport of bed sediment inside and beneath the scour protection may cause deformation and sinking of the scour protection for pile foundations. This may reduce the stability of the mono pile and change the natural frequency of the dynamic response of an offshore wind turbine installed on it in an unfavourable manner. Using physical models and 3D computational fluid dynamic (CFD) numerical simulations, the velocity and bed shear stresses are investigated in complex scour protections around mono piles in steady current. In the physical model the scour protections consisted of an upper cover layer with uniformly distributed coarse stones and a lower filter layer with finer stones. For the numerical simulations, the Flow-3D software was used. The scour protection layers were simulated with different numerical approaches, namely regularly arranged spheres, porous media, or their combinations (hybrid models). Numerical simulations with one or four layers of cover stones without filter layer were first computed. Three additional simulations were then made for a scour protection with a cover layer and a single filter layer. Finally, a simulation of a full scale foundation and scour protection was made with porous media approach.Based on the physical and numerical results, a method to determine the critical stones size to prevent motion of the base sediment is established and compared to a full scale case with sinking of scour protection (Horns Rev I Offshore Wind Farm, Denmark). It is also found that the CFD simulations are capable of calculating the flow velocities when the scour protection is represented by regular arranged spheres, while the turbulence in general is underestimated. The velocity can also be calculated using porous media flow approach, but the accuracy is not as good as for spheres. The deviation is more severe for more complex scour protections. In general, computational models provide valuable information for the prediction and design of scour protections for offshore wind farms.  相似文献   

12.
The local scour around a new pile-group foundation of offshore wind turbine subjected to a bi-directional current was physically modeled with a bi-directional flow flume. In a series of experiments, the flow velocity and topography of the seabed were measured based on a system composed of plane positioning equipment and an ADV. Experimental results indicate that the development of the scour hole was fast at the beginning, but then the scour rate decreased until reaching equilibrium. Erosion would occur around each pile of the foundation. In most cases, the scour pits were connected in pairs and the outside widths of the scour holes were larger than the inner widths. The maximum scour depth occurred at the side pile of the foundation for each test. In addition, a preliminary investigation shows that the larger the flow velocity, the larger the scour hole dimensions but the shorter equilibrium time. The field maximum scour depth around the foundation was obtained based on the physical experiments with the geometric length scales of 1:27.0, 1:42.5 and 1:68.0, and it agrees with the scour depth estimated by the HEC-18 equation.  相似文献   

13.
Suction bucket foundation is a typical type for offshore turbines. Scour caused by wave and current can reduce the stability of foundation and then endanger the whole structure. This paper details a series of suction bucket model tests performed in sand under wave cyclic loading. The model tests investigate the effect of scour on stability of bucket foundation by artificially excavated scour hole around the foundation. It is revealed that the behavior of foundation bearing capacity can be divided into two stages: the initial cyclic stage and the final stage (showing either cyclic stability or cyclic failure). When the wave circulation is stable, the sand on the front and back sides of the foundation is suspected to be liquefied. With the increase in scour depth, the stability of foundation is gradually reduced, the behavior of foundation gradually changes from a state of cyclic stability to cyclic failure, and the number of waves that can be withstood is drastically reduced. Finally, the height of the center of rotation of the suction bucket was observed to descend with the increase in scour depth.  相似文献   

14.
The scour and burial of conical frustums placed on a sandy bed under waves alone (WA) and combined flows (CF) conditions was investigated. The observations indicate that equilibrium burial depth is smaller than burial of other objects such as short cylinders laying on a sand bed under equivalent hydrodynamic conditions. Truncated cone offers less resistance to the flow field due to its more round shape when compared to a horizontally placed short cylinder characterized by sharp edges. A smaller disruption to the flow field translates to less turbulent intensity and to smaller sediment transport capacity of the flow around the object and less burial. The equilibrium burial depth shows a significantly weaker dependency on the Shields parameter than on the Keulegan-Carpenter number, contrary to the case of finite short cylinders. A new empirical predictor based on the relative strength of the wave to the wave plus current velocity, the Keulegan-Carpenter number, and the Shields parameter is proposed for estimating the equilibrium burial of truncated cones under combined flows. Both the Keulegan-Carpenter number and the Shields parameter determine the width of the scour hole around the cone. The former however, is the most dominant parameter influencing the length of the scour hole.  相似文献   

15.
针对水下桩墩的局部冲刷问题,提出一种适用范围广、防冲促淤效果显著的防护措施。该防护措施把一种相对密度略大于水、几何特征特殊的中性网格结构完全覆盖在冲刷坑或可能出现冲刷坑的床面上,以减弱冲刷坑内水动力,促进泥沙落淤,达到减轻局部冲刷的目的。通过数值模拟和水槽试验探讨了中性网格结构对圆桩周围冲刷坑内水动力及床面形态的影响,并研究了网孔尺寸对防冲促淤效果的影响规律。结果表明:该中性网格结构能显著减小局部冲刷坑内的流速,有效抑制局部冲刷,且对桩前来流来沙的影响微弱。孔径比7.7的网格防护结构可以使无黏性沙床上圆桩的局部冲刷深度减少92%,已存在的冲刷坑则可被修复73%。这些研究成果为桩墩局部冲刷防护提供一种新的思路。  相似文献   

16.
大型桥梁冲刷防护工程损坏特性研究   总被引:2,自引:0,他引:2  
以苏通大桥为例,通过模型试验和冲刷防护工程及周边河床地形的长期监测开展了大型桥梁冲刷防护工程的损坏特性研究。研究结果表明,大型桥梁冲刷防护工程存在两种损坏形式:防护工程防护区面层冲刷损坏和防护工程护坦边坡坍塌损坏;防护工程的破坏主要发生在防护工程后1~2年内。提出了以"损坏率"和"稳定边坡"分别表示两种不同类型的破坏指标。同时,提出了防护工程"成型稳定工程量基准线"概念,为监测冲刷防护工程稳定性制定定量目标。研究结果还表明,在防护体稳定后,防护区呈"洪季淤积、枯季冲刷"特点,这一变化对防护体稳定影响有限。研究结果为类似工程设计、监测、维护和相关研究提供参考。  相似文献   

17.
Local Scour Around Piles Under Wave Action   总被引:1,自引:0,他引:1  
The model tests are performed with regular waves, and the effect of wave height, wave period, water depth, sediment size and pile diameter is evaluated. The shape and size of local scour around piles are studied. There are three typical scour patterns due to wave action. It is found that a relationship exists between the erosion depth and the wave number. An empirical formula of the maximum local scour is thus derived.  相似文献   

18.
要研究波流共同作用下桩墩的基础冲刷问题,首先需要了解水流和波浪单独作用下桩墩冲刷的机理和特征。针对波、流及其共同作用下桩墩的局部冲刷问题,从流速、水深、桩径、波长、波高、相对底层流速、粒径和粒径级配等方面系统地简述了恒定流、波浪和波流作用下桩、墩局部冲刷的研究进展。根据实验资料比较了各家经典计算公式的计算结果发现我国规范65-1式计算值偏大,65-2式计算值偏小等结论。桩墩局部冲刷是一个复杂的过程,今后可以针对淤泥质海岸底床、粉沙质海岸底床、复杂桩群结构、物理模型比尺效应、非恒定水动力条件、复杂基础形式方面对波流作用下基础冲刷的最大冲刷深度、冲刷过程、冲刷范围进行研究,以弥补桩墩局部冲刷在这些方面的不足。  相似文献   

19.
Most offshore and coastal structures are supported by pile foundations, which are subjected to large lateral loads due to wind, wave, and water currents. Water currents can induce scouring around piles that reduces lateral capacity and increases lateral deflection of a pile. Current design methods mostly consider the complete removal of soil layers around piles by scouring. In reality, however, scouring creates scour holes at different shapes, sizes, and depths. Their effects on the behavior of laterally loaded piles are not well investigated. A numerical model of a single pile in soft marine clay was first calibrated against field test data without scour. Then several key factors of scour were analyzed, such as the depth, width, and slope of the scour hole and the diameter and head fixity of the pile. The relationships of the ultimate lateral capacity of the single pile with the depth, width, and slope angle of the scour hole were obtained. The numerical results show that the scour depth had more significant influence on the pile lateral capacity than the scour width. In addition, the pile with a free head was more sensitive to scour than the pile with a fixed head.  相似文献   

20.
强潮流作用下桥墩不对称“双肾型”冲刷地貌特征与机理   总被引:1,自引:0,他引:1  
本文在海图地形资料分析桥轴线附近的海床自然冲刷的基础上,利用多波束测深技术研究大桥主墩附近局部冲刷地形。结果表明,该大桥桥位附近地形冲刷较显著,且大桥主墩位置有持续冲刷的趋势;主墩上、下游群桩最大冲刷深度呈上游最深、中部淤积、下游渐深的不对称形态,最大局部冲刷深度为4 m;桥墩整体冲刷坑形态呈南北“双肾型”;潮流流向与桥墩迎流面存在偏南的入射角,使得各桥墩南侧的最大冲深和冲刷范围均大于北侧。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号