首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
The influence of a diaphragm wall construction on the stress field in a soft clayey soil is investigated by the use of a three‐dimensional FE‐model of seven adjacent wall panels. The installation procedure comprises the excavation and the subsequent pouring of each panel taking into account the increasing stiffness of the placed fresh concrete. The soft clay deposit is described by a visco‐hypoplastic constitutive model considering the rheological properties and the small‐strain stiffness of the soil. The construction process considerably affects the effective earth and pore water pressures adjacent to the wall. Due to concreting, a high excess pore water pressure arises, which dissipates during the following construction steps. The earth pressure finally shows an oscillating, distinct three‐dimensional distribution along the retaining wall which depends on the installation sequence of the panels and the difference between the fresh concrete pressure and the total horizontal earth pressure at rest. In comparison to FE‐calculations adopting the earth pressure at rest as initial condition, greater wall deflections and surface ground settlements during the subsequent pit excavation can be expected, as the average stress level especially in the upper half of the wall is increased by the construction procedure of the retaining structure. Copyright © 2004 John Wiley & Sons, Ltd.  相似文献   

2.
Conventional numerical predictions of deep excavations normally neglect the construction process of the retaining structure and choose the earth pressure at rest as initial condition at the beginning of the simulation. The presented results of simulation and measurements during the construction process of the Taipei National Enterprise Center show, that such an assumption leads to an underestimation of the horizontal wall deflection, the surface ground settlements as well as the loading of the struts in case of normally to slightly over‐consolidated clayey soil deposits. The stepwise installation process of the individual diaphragm wall panels results in a substantial modification of the lateral effective stresses in the adjacent ground. Especially the pouring process of the panel and the fresh concrete pressure causes a partial mobilization of the passive earth pressure and a distinct stress level increase in the upper half of the wall. As a consequence of the increased stresses prior to the pit excavation, up to 15% greater ground and wall movements are predicted. Moreover, the increased stress level due to the installation process of the diaphragm wall leads to substantial higher strut loadings during the excavation of the pit. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

3.
两侧铰接地下连续墙的试验研究及数值分析   总被引:2,自引:0,他引:2  
裴颖洁  郑刚  刘建起 《岩土力学》2008,29(1):279-284
地下连续墙用于平面不规则形状基坑支护时,对任意直线段墙体,其受力与变形实际上是三维的,而不是一般经验简化方法假设的二维变形与受力,并应考虑相邻墙体之间的相互作用。采用考虑墙土相互影响的地下连续墙与土共同作用的三维有限元方法,研究了墙端铰接和墙端自由两种边界条件对等刚度及变刚度墙体内力与变形的影响,计算结果表明,建议的理论计算方法与模型试验结果吻合较好。通过与模型试验实测值的对比,指出了以往采用平面有限元进行分析的方法的不足,并重点分析了墙端铰接对墙体横向弯矩的影响,研究结果表明,三维变形产生的横向弯矩是可观的,必须加以考虑。  相似文献   

4.
Three-dimensional numerical analysis of deep excavations with cross walls   总被引:4,自引:2,他引:2  
Previous plane strain analysis of a case history has shown that cross walls in an excavation can effectively reduce movements induced by deep excavation. This study performed three-dimensional numerical analyses for 4 deep excavation cases with different installations of cross walls, including different excavation depths, cross wall intervals and cross wall depths. Both the observed and computed wall deflections for the 4 cases were compared with those of the same excavations that were assumed with no cross walls installed to demonstrate the effectiveness of cross walls in reducing lateral wall deflections. The results show that the cross wall also had a corner effect similar to that of the diaphragm wall. The deflection of the diaphragm wall was smallest at the location of the cross wall installed and then increased with the increasing distance from the cross wall, up to the midpoint between two cross walls. Many factors such as in situ soil properties, diaphragm wall properties, construction procedure, cross wall depth and so on may affect the amount of reduction in lateral wall deflections due to the installation of cross walls. Under the same condition, the amount of reduction was highly dependent on the depth of cross walls, distance to the cross walls and the cross wall interval.  相似文献   

5.
The construction of basements in urban areas is often associated with the possible damage to existing structures and services. The varying construction processes inevitably lead to different stress unloading patterns and therefore the dissipation of these excess pore-water pressures may lead to non-standard deformation profiles. The three main types of basement construction processes are layered excavation (LE), basin excavation (BE) and island excavation (IE). The effect of the various unloading patterns has been investigated by a three dimensional (3D) effective stress analysis method using the developed computer program 3DBCPE4.0. An excavation of length 50 m, width 50 m and depth 9 m in a certain homogenous and isotropic saturated soft soil was modelled. This included a diaphragm wall of 800-mm thickness embedded 18 m deep into the soft soil. The different excavation deformation profiles under different excavation patterns were related to the different unloading process, the exposure time of excavation face and the dissipation of negative excess pore-water pressures. The most favourable process for controlling the horizontal deformation of a retaining wall or the heave deformation of the formation level is suggested. The ground water potentials within the formation level are also presented.  相似文献   

6.
Numerical models are commonly used to estimate excavation‐induced ground movements. Two‐dimensional (2D) plain strain assumption is typically used for the simulation of deep excavations which might not be suitable for excavations where three‐dimensional (3D) effects dominate the ground response. This paper adapts an inverse analysis algorithm to learn soil behavior from field measurements using a 3D model representation of an excavation. The paper describes numerical issues related to this development including the generation of the 3D model mesh from laser scan images of the excavation. The inverse analysis to extract the soil behavior in 3D is presented. The model captures the measured wall deflections. Although settlements were not sufficiently measured, the predicted settlements around the excavation site reflected strong 3D effects and were consistent with empirical correlations. Copyright © 2010 John Wiley & Sons, Ltd.  相似文献   

7.
A series of three-dimensional finite element analyses of deep excavations with the integrated system between buttress walls and diaphragm walls was conducted to investigate the effect of the buttress wall intervals, treatments, locations, height, and thickness on limiting deformations induced by deep excavation. The integrated retaining system was formed by maintaining buttress walls when soil was excavated. The wall deflection control mechanism of the integrated retaining system mainly came from the combined stiffness between the buttress wall and the diaphragm wall. In addition, the ground settlement control mechanism came from the combined stiffness between the buttress wall and the diaphragm wall, and the frictional resistance between the buttress wall and the surrounding soil. For achieving 50% reduction in the wall deflection and the ground surface settlement, the length and intervals of buttress walls that were applied to the integrated retaining system were at least 4 and 8 m, respectively. When the deflection at the diaphragm wall head was well restrained, for example, by the floor slab, the position of the buttress wall head could be located at a depth the diaphragm wall starts to bulge out. In such a case, the performance between the full height and limited height of buttress walls was quite close. Furthermore, a new well-documented excavation project was analyzed to verify the performance of the integrated retaining system. Results showed that the integrated retaining system worked excellently if the joints between buttress walls and diaphragm walls were constructed properly.  相似文献   

8.
朱宁  周洋  刘维  史培新  吴奔 《岩土力学》2018,39(Z1):529-536
采用三维有限差分软件FLAC3D对地下连续墙施工进行模拟,分析苏州地区粉土地层中地连墙施工对土体扰动及周边建筑物影响。利用UBCSAND硬化规律对外部扰动作用下土体强度逐步发挥的力学特性进行表征,模拟开挖过程中浅层土体变形,并对地连墙施工中成槽开挖、钢筋混凝土施工及混凝土硬化进行全过程模拟。计算结果表明,硬化模型较好地反映地连墙施工扰动下浅层土体力学特性;地连墙成槽阶段地层变形随深度的增加而减小,地表以下20 m范围内地层变形显著,而深部土体变形较小;钢筋混凝土浇筑施工对地层变形起到抑制作用;混凝土硬化阶段地层变形趋于稳定。在该基础上采用硬化模型对苏州某基坑地连墙施工进行数值仿真,模拟结果和现场实测吻合较好。  相似文献   

9.
Several case studies have revealed that the installation of cross walls in excavations can effectively reduce the amount of wall deflection and ground settlement. However, the behaviour of the diaphragm wall due to the installation of the cross walls is still unclear. This study performed a series of 3D numerical studies of wall deflections for deep excavations with cross walls and studied the effects on the wall deflection of several parameters, including the number of cross walls, the distance to the cross wall, the cross wall interval, the cross wall height and the cross wall embedment. The results presented in this study can be used as a first approximation for cases in which cross walls are designed to reduce the wall deflection induced by deep excavation.  相似文献   

10.
Pile installation leads to significant changes in the main state variables of the surrounding soil. In addition, the installation process may have an influence on adjacent or intersecting structures such as pile grillages. In this paper, three‐dimensional numerical analyses are presented to investigate the effects of pile driving with open or closed cross‐sections on the surrounding soil and on adjacent structures. Two different installation methods are used: quasi‐static pile jacking and vibratory pile driving. The numerical models are evaluated and verified using data from field tests performed in situ during the construction of the quay wall at the container terminal CT4 in Bremerhaven. Two case studies are presented to characterize the main influence factors for additional loading on adjacent structures due to pile installation. Finally, a parametric study is conducted showing the influence of the installation method, pile cross‐section and distance of a pile from an existing structure on the additional loading for this structure. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

11.

The deformation of a deep foundation pit in Ulanqab city was analyzed by in situ monitoring and numerical simulation data. First, a limit equilibrium method was used to evaluate the stability of foundation pit under non-supporting and ribbed plate anchored retaining wall support. The results show that the ribbed plate anchored retaining wall support could control the soil deformation effectively in deep foundation pit. Additionally, a three-dimensional finite difference model of excavation zone and reinforcement structure was established using FLAC3D software to simulate the excavation of deep foundation pit. The simulation results were verified by monitoring field data. The simulation results show that all the bolts are in the tension state, and the maximum axial force is located at the end of the bolt, with a value of 46.4 kN. Foundation pit excavation is a continuous stress release process, making the rock and soil of side wall of foundation pit slide towards the free surface. The largest deformation is 4.0 mm, near the side wall of foundation pit, consistent with the deformation monitoring results.

  相似文献   

12.
考虑土体硬化的基坑开挖性状及隆起稳定性分析   总被引:1,自引:1,他引:0       下载免费PDF全文
基坑开挖过程中,土体应力路径、卸载回弹再压缩特性与简单加载或卸载不同,采用常规的理想弹塑性模型模拟基坑开挖,得到的围护墙位移、坑内土体回弹以及坑外沉降较大。分析了基坑开挖不同区域土体的性状,采用土体硬化模型模拟基坑开挖的卸载与土体硬化行为,结合工程算例,对比土体硬化模型和理想弹塑性模拟以及实测的围护结构土压力、围护墙水平位移和坑外土体沉降,并利用强度折减法分析基坑的稳定性。计算结果表明,考虑土体硬化的HS模型有限元方法能体现土体卸载再加载与开挖的特性,所得土压力、围护结构水平位移以及基坑抗隆起稳定性符合软土地区基坑工程的实践。  相似文献   

13.
夏元友  裴尧尧  王震  陈少炎  陈晨 《岩土力学》2012,33(11):3433-3438
对武汉市某超大型超深基坑10幅邻近地连墙跳跃式施工过程进行了三维有限差分数值模拟。数值模拟步骤依次为泥浆护壁成槽开挖、混凝土浇筑及混凝土硬化3个过程。泥浆护壁成槽开挖及混凝土浇筑分别采用常静液压力和变静液压力的方式加载,混凝土的硬化过程采用变弹性模量和泊松比的线弹性实体单元完成。数值计算结果与实测数据吻合较好。对单个跳跃式开挖过程墙上土压力的监测揭示了地下连续墙施工影响应力重分布的变化规律。模拟施工完成后10幅地下连续墙上的土压力值沿墙长度方向随静止土压力值上下波动,波谷出现在槽段连接处附近,波峰接近槽段中心轴,波动幅度大小与土体深度有关。分析表明,泥浆压力、混凝土灌注压力及土压力差值是影响墙后应力重分布波动幅度的主要原因,适当的泥浆重度及合理的注浆方式能避免土体扰动。  相似文献   

14.
宁波北仑电厂二期循环水泵房基抗支护与监测   总被引:1,自引:0,他引:1  
介绍了宁波北仑电厂二期工程地下连续墙支护结构的计算与模型。采用ALGOR有限元分析系统,对基坑开挖引起的应力场、位移场进行了分析计算。对墙体变形、钢筋应力、土压力及沉降进行了观测。通过计算值与实测结果的比较,分析了影响基坑变形的主要因素。  相似文献   

15.
Numerous studies have been devoted to the performance of excavations and adjacent facilities. In contrast, few studies have focused on retaining wall deflections induced by pre-excavation dewatering. However, considerable inward cantilever deflections were observed for a diaphragm wall in a pre-excavation dewatering test based on a long and narrow metro excavation, and the maximum deflection reached 10 mm (37.6% of the allowable wall deflection for the project). Based on the test results, a three-dimensional soil–fluid coupled finite element model was established and used to study the mechanism of the dewatering-induced diaphragm wall deflections. Numerical results indicated that the diaphragm wall deflection results from three factors: (1) the seepage force around the dewatering well and the soil–wall interaction caused the inward horizontal displacement of the soil inside the excavation; (2) the reduced total earth pressure on the excavated side of the diaphragm wall above approximately 1/2 of the maximum dewatering depth disequilibrated the original earth pressure on both sides of the diaphragm wall; and (3) the different negative friction on the excavated and retained sides of the diaphragm wall led to the rotation of the diaphragm wall into the excavation.  相似文献   

16.
The walls of a deep excavation in cohesionless soils below the water table have been supported by a reinforced concrete diaphragm with T-shaped panels. To improve the safety against the risk of local collapse during the panel excavation, the soil surrounding the panels has been treated by deep mixing to a depth of 6?C10?m. The horizontal displacements, induced in the surrounding soil by the installation (deep mixing, slurry supported excavation, placing of the reinforcement cage, concrete casting and curing) of the diaphragm, have been measured by means of inclinometers. It is claimed that they can be a significant fraction of the total displacements induced by the excavation. A back analysis of the observed displacements shows that the deformation process is essentially elastic and can be satisfactorily modelled provided the values of the soil stiffness are properly selected.  相似文献   

17.
现有基坑相关研究主要关注土方开挖过程引起的变形,认为围护结构变形起点是土方第1次开挖。然而,一些工程实测表明,基坑开挖前降水阶段即可引起围护结构及周边地层发生厘米级的变形。显然,未考虑开挖前变形的基坑监测数据将低估基坑施工的环境效应。为了研究基坑开挖前降水引发基坑变形的机制,开展了室内模型试验,对基坑开挖前降水过程进行了缩尺精细化模拟。通过微型降水井的设置与调控,模型试验真实再现了实际基坑降水过程中井流效应对围护结构受力变形的影响。试验过程中发现,随着降水的进行,坑外降水漏斗不断扩展,围护结构悬臂式侧移及坑外拱肩式地面沉降也随之产生。另外,降水导致墙前水压力明显减小,并诱发墙前侧向总压力重分布(以减小为主),围护结构为此发生指向坑内的悬臂式运动以寻求新的受力平衡,并通过墙后土体损失诱发坑外地层变形。  相似文献   

18.
Finite-element modeling of a complex deep excavation in Shanghai   总被引:2,自引:0,他引:2  
The excavation of the north square underground shopping center of Shanghai South Railway Station is a complex deep excavation using the top-down construction method. The excavation has a considerable size and is close to the operating Metro Lines. In order to predict the performance of the excavation more accurately, 3D finite-element analyses are conducted to simulate the construction of this complex excavation. The effects of the anisotropic soil stiffness, the adjacent excavation, and zone excavation on the wall deformation are investigated. It is shown that the numerical simulation with anisotropic soil stiffness yields a more reasonable prediction of the wall deflection than the case with isotropic soil stiffness. The deformation of the shared diaphragm wall between two excavations is influenced by the construction sequence of the two excavations. The zoned excavation can greatly reduce the diaphragm wall deformation. However, only the zoned excavation at the first excavation stage affects the deformation of the walls significantly. When the depth of the excavation increases, the zoned excavation has minor effect on the deformation of diaphragm walls.  相似文献   

19.
Previous studies have shown that use of cross walls in deep excavations can reduce the wall deflection to a very small amount. However, design of cross walls is costly because the deflection behavior of the diaphragm wall with cross walls is in nature three dimensional. The objective of this study was to establish a simplified approach used as a first approximation to design cross walls such that the lateral wall deflection can satisfy a design criterion. A series of parametric studies using a three-dimensional numerical method was performed to obtain the influence factors on wall deflections, including excavation geometry, wall system stiffness, axial stiffness of strut, axial stiffness of the cross wall, normalized undrained shear strength of clay and the cross wall depth. Then, a simplified formula for predicting the wall deflection for excavations without and with cross walls was established using multivariate regression analysis, respectively. The formulas were validated through 36 excavation cases without cross walls and 12 cases with cross walls. The simplified formulas can be used to develop a spreadsheet that estimates the cross wall sizes and intervals based on the entered excavation geometry, material properties of retaining-strut system, in situ undrained shear strength and tolerable wall deflection. The estimated cross wall sizes and intervals should be verified by an appropriate full numerical analysis.  相似文献   

20.
侯凯 《地质与勘探》2017,53(3):565-572
随着城市的快速发展,地铁车站周边开发的建筑越来越多,周边建筑施工对地铁车站将产生不可避免的不利影响。本文结合某大型建筑深基坑工程的设计、施工及监测数据,通过有限元计算,分析基坑开挖施工力学特征,研究基坑施工对临近地铁车站的变形影响。研究发现,基坑采用合理的地下连续墙、钻孔灌注桩等围护体系、适当的被动区加固方式、科学的分基坑开挖施工组织等措施,可以保证基坑开挖施工对临近车站的影响在可控制、可接受的范围内,为软土地区类似基坑的设计、施工提供参考经验。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号