首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 574 毫秒
1.
In this paper the seismic response of a well-documented Chinese rockfill dam, Yele dam, is simulated and investigated employing the dynamic hydro-mechanically (HM) coupled finite element (FE) method. The objective of the study is to firstly validate the numerical model for static and dynamic analyses of rockfill dams against the unique monitoring data on the Yele dam recorded before and during the Wenchuan earthquake. The initial stress state of the dynamic analysis is reproduced by simulating the geological history of the dam foundation, the dam construction and the reservoir impounding. Subsequently, the predicted seismic response of the Yele dam is analysed, in terms of the deformed shape, crest settlements and acceleration distribution pattern, in order to understand its seismic behaviour, assess its seismic safety and provide indication for the application of any potential reinforcement measures. The results show that the predicted seismic deformation of the Yele dam is in agreement with field observations that suggested that the dam operated safely during the Wenchuan earthquake. Finally, parametric studies are conducted to explore the impact of two factors on the seismic response of rockfill dams, i.e. the permeability of materials comprising the dam body and the vertical ground motion.  相似文献   

2.
利用前人所编的历代(共四代)地震烈度(地震动)区划图,组合叠加后得到一个综合烈度(地震动)。这种叠加是一个集成的专家系统综合认识结果,以此作为坝体可能遭受地震破坏危险的因素。初步研究建立了混凝土大坝震害评估模型,此模型是考虑了坝体的结构类型、建设年代、使用现状、场地条件、抗震设防水平等因素,用逐步线性拟合方法进行回归分析得到的。用此模型对汶川地震破坏的坝体进行了实例分析,分析结果比较符合实际。最后,用这个模型对黄河上游10座重点混凝土大坝做了震害评估分析。  相似文献   

3.
汶川8.0级特大地震与紫坪铺水库蓄水关系的讨论   总被引:4,自引:1,他引:3  
汶川8.0级特大地震造成了全国以四川地区为中心向外辐射的诸多水库震损,同时这次大地震也引发了对于高地震烈度区修建水库大坝一系列问题的讨论,其中包括对水库诱发地震的讨论,甚至有学者提出这次大地震与岷江上修建的紫坪铺大坝有关的论述。针对这种情况,本文分别从历史角度并结合国内外已经发生的水库诱发地震实例,明确了水库诱发地震的基本概念,论述了水库诱发地震的特点及其与天然构造地震的差别。本文最后就汶川8.0级特大地震与紫坪铺水库蓄水给出了自己的观点。  相似文献   

4.
汶川特大地震给四川省德阳市水库土坝造成了不同程度的震损。依据德阳市境内66座高危以上险情水库土坝震害考察资料和现场震害调查结果,对震损水库土坝进行了分类统计,研究其震害特征及震损原因,结果表明:小型水库均质土坝在此次地震中震损数量最多、险情严重,且震害类型丰富;典型震害包括裂缝、滑坡、沉陷、渗漏以及泄水建筑物与其它附属设施损坏。以德阳市3座典型震损水库土坝为例,分析了水库土坝的基本情况、震前运行状况及震损情况,进而提出了有效的震后抢险措施。  相似文献   

5.
水库地震安全问题分析   总被引:7,自引:3,他引:4  
通过分析水库周围社会及大坝安全的地震影响、世界水库的发展情况、目前对水库地震安全的认识及其研究技术,认为水库周围的地震威胁有天然地震和水库诱发地震两类,表现为对水库大坝及其附属工程和库区社会均产生影响,因此水库地震安全主要由大坝地震安全、大坝附属工程地震安全和库区社会安全构成。随着水库大坝建设速度的不断加快和大型水库的不断增加,尤其是复杂地质构造区水库建设的增多,有必要在对大坝地震安全进行研究的基础上,重视水库地震安全的研究。  相似文献   

6.
调查、搜集和研究了汶川地震中被评定为高危以上险情的147座小型水库土坝的地震破坏情况,给出了高危以上险情土坝的地震破坏程度划分为中等破坏、严重破坏和极严重破坏三个等级的原则和标准,以及土坝的地震破坏程度与地震烈度、土坝的宽高比、上游坡比、坝高的经验关系表,可发现:土坝的几何形状对其破坏程度起着重要的作用;对于6~8度地震烈度区,土坝的宽高比越小,或上游坡比越小,或坝体越高,则土坝的破坏程度越严重;对于9度以上地震烈度区,土坝通常发生极严重破坏。依据高危以上险情土坝的地震反应分析结果,给出了土坝地震破坏程度与土坝宽高比、坝高、土坝上游坡比及坝顶加速度放大系数、坝体最大动剪应力的经验关系曲线,发现在相同的地震烈度水平下,土坝的宽高比越小,或上游坡比越小,或坝高越大,且坝顶加速度放大系数越大或坝体最大动剪应力越大,则其地震破坏程度越严重;坝体最大动剪应力超过30kPa的土坝,通常发生严重或极严重破坏,坝体最大动剪应力大于100kPa的土坝,通常发生极严重破坏;土坝离发震断层越远,则其坝顶加速度放大系数越大。本文给出的高危以上险情土坝的地震破坏程度与坝体几何形状的经验关系,可为今后土坝抗震设计提供参考依据。  相似文献   

7.
加强高土石坝抗震研究的现实意义及工作展望   总被引:13,自引:0,他引:13  
围绕西部大开发和南水北调战略的需要,对高土石坝抗震研究的现实意义和若干关键问题及研究现状进行了论述。并针对高土石坝震害资料获取与整理、坝料动力特性研究、多耦合非线性动力分析理论和方法、动力破损特征与地震灾害机理、地震安全评价与震害预测的基本理论、抗震设计及抗震措施、震灾机理和抗震理论的动力模型试验等研究提出了工作设想和展望,并提出了建立土石坝地震安全评价及防灾对策专家系统的基本思路。  相似文献   

8.
汶川8.0级地震水坝震害调查   总被引:11,自引:1,他引:10  
“5.12”汶川地震中水坝损毁严重,造成了巨大的经济损失。震后对69座溃坝险情和310座高危险情水库水坝进行了系统的调查,典型震害现象包括坝体裂缝、塌陷、滑坡、渗漏、启闭设施损坏和其他附属设施的损毁等。文中给出了不同烈度区的水坝震害分布,并对地震中水坝的震害现象做了初步总结和分析。  相似文献   

9.
汶川地震中绵阳市梓潼县水库土坝震害调查与分析   总被引:2,自引:0,他引:2  
5·12汶川特大地震对绵阳市梓潼县170座水库造成了不同程度的破坏和严重的经济损失.依据绵阳市梓潼县水库地震灾害的现场科学考察资料,对绵阳市梓潼县48座高危以上险情水库土坝的震损情况做了初步总结和分析.典型震害现象包括裂缝、渗漏以及泄水建筑物和附属设施的损毁等;以梓潼县3座典型震损水库土坝为例,总结了震损水库的特点和经验教训,给出了一些建设性结论.  相似文献   

10.
浅谈芦山地震   总被引:11,自引:3,他引:8       下载免费PDF全文
陈运泰  杨智娴  张勇  刘超 《地震学报》2013,35(3):285-295
地震序列是对地震现象的回顾性描述,只有在地震序列结束后它才有可能被确切无疑地判定.鉴于龙门山断裂带或地震带的整体性、统一性和系统性,不可否认在其西南段发生的芦山地震是与汶川地震一样的同属于龙门山断裂带的事件.鉴于芦山地震的震源位置、震源机制、震级大小和破裂区覆盖的范围,目前可认为它是汶川地震迄今最大的余震.鉴于地震序列的判定是对地震现象的唯象的描述,有相当的任意性,对芦山地震究竟是"新的主震"还是"汶川余震"的"讨论"实质上是在根据经验判定地震的类型,即使目前看"主震说"提出的4条"论据"明显缺乏说服力,"余震说"比较有说服力,但最后都需要等到地震序列结束之后才有可能"定论".作者认为,相对于需要等到地震序列结束之后才能"定论"、甚而在地震序列结束之后未必能"定论"的芦山地震究竟是"新的主震"还是"汶川余震"问题,应当更为关注芦山地震的发生引出的一些重要的亟待研究的科学问题与防震减灾问题.  相似文献   

11.
汶川地震震损水库土坝动力反应与几何坝形的经验关系   总被引:1,自引:0,他引:1  
在5·12汶川地震后的四川省水库土坝震害调查成果的基础上,选取汶川地震中受损的有完整资料的96座水库土坝为研究对象,应用等效线性模型对土坝进行了二维动力反应分析。选择3条有代表性的汶川地震实测记录,以三水准峰值加速度输入,得到土坝的动力反应(放大系数、最大动剪应力)与土坝几何形状(宽高比、上游坡比、坝高)间的经验关系。结果表明,土坝放大系数和最大动剪应力随着宽高比和上游坡比的增大而减小,随着坝高的增大而增大;输入波的频谱和峰值强度均对土坝动力反应与其几何形状的经验关系有重要影响。  相似文献   

12.
Earthquake safety assessment of concrete arch and gravity dams   总被引:9,自引:1,他引:8  
Based on research studies currently being carried out at Dalian University of Technology, some important aspects for the earthquake safety assessment of concrete dams are reviewed and discussed. First, the rate-dependent behavior of concrete subjected to earthquake loading is examined, emphasizing the properties of concrete under cyclic and biaxial loading conditions. Second, a modified four-parameter Hsieh-Ting-Chen viscoplastic consistency model is developed to simulate the rate-dependent behavior of concrete. The earthquake response of a 278m high arch dam is analyzed, and the results show that the strain-rate effects become noticeable in the inelastic range. Third, a more accurate non-smooth Newton algorithm for the solution of three-dimensional frictional contact problems is developed to study the joint opening effects of arch dams during strong earthquakes. Such effects on two nearly 300m high arch dams have been studied. It was found that the canyon shape has great influence on the magnitude and distribution of the joint opening along the dam axis. Fourth, the scaled boundary finite element method presented by Song and Wolf is employed to study the dam-reservoir-foundation interaction effects of concrete dams. Particular emphases were placed on the variation of foundation stiffness and the anisotropic behavior of the foundation material on the dynamic response of concrete dams. Finally, nonlinear modeling of concrete to study the damage evolution of concrete dams during strong earthquakes is discussed. An elastic-damage mechanics approach for damage prediction of concrete gravity dams is described as an example. These findings are helpful in understanding the dynamic behavior of concrete dams and promoting the improvement of seismic safety assessment methods.  相似文献   

13.
汶川MS8.0地震科学考察数据库存储了大量的野外调查数据,主要包括野外地质观测点、地表破裂带、震区第四纪断层的展布及其活动性地质观测点、古地震探槽、断错地貌测量等数据,以及搜集来的地层数据、汶川地震及其余震、重新定位余震、历史强震等数据。文中利用ArcGis将这些野外数据进行了录入、编辑、分析和制图输出,初步构建了一个包含基础地震地质信息的汶川地震科学考察数据库,实现了数据的空间位置和属性特征的综合管理,可根据需要对相关专题的数据进行查询、分析和处理,并绘制了汶川地震构造图及地表破裂分布图,为灾后重建避让带的确定提供了依据,为进一步构建汶川地震地理信息系统奠定了数据基础  相似文献   

14.
In this study, the earthquake damage response of the concrete gravity dams is investigated with considering the effects of dam–reservoir interaction. A continuum damage model which is a second-order tensor and includes the strain softening behavior is selected for the concrete material. The mesh-dependent hardening technique is adopted such that the fracture energy dissipated is not affected by the finite element mesh size. The dynamic equilibrium equations of motion are solved by using the improved form of the HHT-α time integration algorithm. Two dimensional seismic analysis of Koyna gravity dam is performed by using the 1967 Koyna earthquake records. The effects of damage on the earthquake response of concrete gravity dams are discussed. Comparison of the Westergaard and Lagrangian dam–reservoir interaction solutions is made. The effects of viscous damping ratio on the damage response of the dam are also studied.  相似文献   

15.
This paper presents the damage in the meizoseismal region of the Ms8.0 Wenchuan earthquake, Sichuan, China, and the seismic intensifies determined according to "the Chinese Seismic Intensity Scale", and discusses briefly the types of earthquake-generating faults and some features of seismic damage.  相似文献   

16.
“十五”期间国家和各省建立的地震应急指挥技术系统在汶川8.0级地震中得到全面的检验,其中包含地震应急基础数据库。通过汶川8.0级地震应急工作中的实践,对陕西地震应急基础数据库的功能、作用及问题等进行初步的探讨。  相似文献   

17.
The Zipingpu Concrete Faced Rockfill Dam (CFRD) was subjected to significant local damage in the “5.12” Wenchuan earthquake. It is the first rockfill dam of more than one hundred meters high to encounter a strong earthquake anywhere in the world. Based on the finite element smoothing method, the residual strains at a typical cross-section and a downstream slope of the dam were obtained by processing the dam monitored displacement data. The position of and reason for the dam settlement and deformation of rockfill dilatancy in the earthquake were analyzed according to the section residual strain. The results show that the maximum settlement ratio on the dam body approximately occurs at 2/3 of the dam height; dilatancy occurs from the dam crest to 25–30 m in the upstream and downstream slope; the immediate cause of the face slabs horizontal construction joint dislocation is excessive residual shear strain. Meanwhile, the position of and reason for the dam fissure in the earthquake were analyzed according to the dam slope residual strain.  相似文献   

18.
陕西地震监测台网在汶川地震监测中的应用   总被引:1,自引:1,他引:0  
介绍陕西地震监测台网及运行情况,总结分析该台网在四川汶川8.0级地震速报、震型判定、余震预测和地震烈度划分、抗震救灾等方面的作用,探讨了地震监测台网建设及防震减灾相关问题。  相似文献   

19.
Many concrete gravity dams have been in service for over 50 years, and over this period important advances in the methodologies for evaluation of natural phenomena hazards have caused the design‐basis events for these dams to be revised upwards. Older existing dams may fail to meet revised safety criteria and structural rehabilitation to meet such criteria may be costly and difficult. Fragility assessment provides a tool for rational safety evaluation of existing facilities and decision‐making by using a probabilistic framework to model sources of uncertainty that may impact dam performance. This paper presents a methodology for developing fragilities of concrete gravity dams to assess their performance against seismic hazards. The methodology is illustrated using the Bluestone Dam on the New River in West Virginia, which was designed in the late 1930s. The seismic fragility assessment indicated that sliding along the dam–foundation interface is likely if the dam were to be subjected to an earthquake with a magnitude of the maximum credible earthquake (MCE) specified by the U.S. Army Corps of Engineers. Moreover, there will likely be tensile cracking at the neck of the dam at this level of seismic excitation. However, loss of control of the reservoir is unlikely. Copyright © 2003 John Wiley & Sons, Ltd.  相似文献   

20.
A comparative study of selected bridge damage due to the Wenchuan, Northridge, Loma Prieta and San Fernando earthquakes is described in this paper. Typical ground motion effects considered include large ground fault displacement, liquefaction, landslide, and strong ground shaking. Issues related to falling spans, inadequate detailing for structural ductility and complex bridge configurations are discussed within the context of the recent seismic design codes of China and the US. A significant lesson learned from the Great Wenchuan earthquake, far beyond the opportunities to improve the seismic design provisions for bridges, is articulated.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号