共查询到20条相似文献,搜索用时 31 毫秒
1.
作者依据地震震级与空间联合概率分布模型,讨论了地震带震级概率分布与潜在震源区震级概率分布之间的关系。研究结果表明,如果地震带内地震震级概率分布服从截断的指数分布,则带内必存在震级概率密度不服从截断指数分布的潜在震源区。这一结论与实际地震资料的统计结果和地质学研究中提出的“特征地震”的概念是一致的。作者认为,在地震活动性分析、地震区划和其他工程地震研究工作中必须考虑潜在震源区的震级概率分布和地震带震级概率分布之间的制约关系,以正确确定每个潜在震源区的震级概率分布。 相似文献
2.
3.
4.
The Seismic Intensity Zoning Map of China(1990)was based on the probabilistic method of seismic hazard analysis.In compiling the map,the characteristics of inhomogeneity of earthquake distribution both in space and time in China are considered sufficiently,and some necessary modifications in the model of seismic hazard analysis are carried out.Based on the analysis of the seismic activity and seismotectonic environment,26 seismic provinces are divided first as the statistical elements of the seismicity analysis; the seismic potential source areas are then divided in the seismic provinces.The 733 potential source areas with various upper limit magnitudes have been divided in the country.According to the reliable time domain of earthquake data with various magnitude intervals,the b values in magnitude-frequency relationship are calculated in the seismic provinces.According to the analysis of the inhomogeneity of seismicity distribution both in space and time,the annual average occurrence rates of the eart 相似文献
5.
采用了分布式地震活动性模型. 该模型无需潜在震源区划分,同时简化了地震危险性概率分析方法. 根据破坏性地震目录建立了3个地震活动性模型,利用高斯光滑函数获得了华北区域内的a值分布特征,使用3种典型的衰减模型,分别计算了50年内超越概率10%, 5%和2%的地震动峰值加速度分布. 其分析结果显示了峰值加速度分布特征与我国第四代区划图大体一致,特定地震活动区(太原、 石家庄等地区)的峰值加速度略高于第四代区划图的结果,而这种峰值加速度分布特征与该地区较高的地震活动性特征是一致的. 概率危险性曲线结果表明,唐山、太原和北京等地区的潜在地震危险性比华北区域内其它城市高. 相似文献
6.
In this paper, we have proposed an alternative seismic hazard modeling by using distributed seismicites. The distributed seismicity model does not need delineation of seismic source zones, and simplify the methodology of probabilistic seismic hazard analysis. Based on the devastating earthquake catalogue, we established three seismi- city model, derived the distribution of a-value in northern China by using Gaussian smoothing function, and cal-culated peak ground acceleration distributions for this area with 2%, 5% and 10% probability of exceedance in a 50-year period by using three attenuation models, respectively. In general, the peak ground motion distribution patterns are consistent with current seismic hazard map of China, but in some specific seismic zones which in-clude Shanxi Province and Shijiazhuang areas, our results indicated a little bit higher peak ground motions and zonation characters which are in agreement with seismicity distribution patterns in these areas. The hazard curves have been developed for Beijing, Tianjin, Taiyuan, Tangshan, and Ji’nan, the metropolitan cities in the northern China. The results showed that Tangshan, Taiyuan, Beijing has a higher seismic hazard than that of other cities mentioned above. 相似文献
7.
8.
新版地震区划图地震活动性模型与参数确定 总被引:11,自引:4,他引:7
地震活动性模型和地震动预测模型是概率地震危险性分析的两个核心。在新版地震区划图中,依据板内地震活动空间不均匀性分布的特点,在概率地震危险性分析方法(CPSHA)中采用了由地震统计区、背景潜在震源区和构造潜在震源区构成的三级层次性潜在震源区模型,并构建了相应的地震活动性模型。本文在论述CPSHA方法及其地震活动性模型基本概念的基础上,重点介绍了新版地震区划图地震活动性模型的三级潜在震源区模型的构成、地震活动性假定和基本特点,同时,也对新版地震区划图地震活动性模型的重要参数确定思路、方法与结果进行了介绍。本文将为更好地认识与理解我国新版地震动参数区划图提供有益的参考。 相似文献
9.
新地震区划图潜在震源区划分的主要技术特色 总被引:13,自引:7,他引:6
简要介绍了新地震区划图潜在震源区划分方案的形成过程,重点分析了潜在震源区三级划分、东西部地区潜在震源区划分技术途径的差异、不同级别活动块体边界带对高震级潜在震源区划分的控制作用、发震构造模型及其在潜在震源区划分中的应用等主要技术特色.共划分出29个地震带、77个地震构造区和1199个潜在震源区.与中国地震动参数区划图(2001)中综合方案相比,东西部地区潜在震源区的个数都有较大的增加,其中东部地区体现在震级上限6.0、6.5和7.0级的中强潜在震源区个数的明显增加,与划分工作中加强了该地区中强地震发震构造的判识研究相关;而西部地区体现在震级上限7.5和8.0级的高震级潜在震源区个数的大幅度增加,与划分工作中注重了活动块体边界带高震级潜在震源区划分,以及强调应用发震构造模型指导潜在震源区划分的技术特色相协调. 相似文献
10.
本文采用了空间光滑地震活动性模型,该模型无需潜在震源区划分,同时发展了概率地震危险性分析新方法。根据三种地震目录资料建立了三种地震活动性模型,利用高斯光滑函数获得了湖南区域内的比值分布特征,使用了两种典型的衰减模型,计算了50年内超越概率10%的地震动峰值加速度(PGA)分布。其分析结果显示PGA分布特征与中国地震动参数区划图大体一致,部分区域PGA提高,PGA达0.05g的区域显著扩大,其中包括邵阳、湘潭、吉首、怀化等重要城市,而这种PGA分布特征与该地区地震活动性特征是一致的。概率危险性曲线的结果表明常德等地区的潜在地震危险性比湖南区域内其他城市高。表明此模型用于地震危险性计算中是简便易行的,且具有较高的精度。尤其对于地质和地震构造信息缺乏的弱震区和中强震区,该方法作为替代方法并有着广泛的应用价值。 相似文献
11.
本文选取华北地震区作为研究区域,尝试利用空间光滑活动模型进行地震危险性评估.首先对研究区域进行划分网格,依据地震构造和地震空间分布特征建立地震构造模型,确定构造区特征参数(b值、M0、Mu、断层方位角及M-L关系等).采用考虑了地震构造背景的椭圆光滑过程的地震活动参数模型,计算各网格点的地震发生率.并利用网格源的地震危险性概率评价方法,由不同输入地震目录通过综合加权得到该区域50年超越概率10%的加速度峰值区划结果.该方法充分体现了地震活动的空间非均一性,尤其适用于发震构造不甚清晰的中强地震可能造成的地震危险性,避免了常规潜在震源区的划分.且评价方法简单快捷,为地震区划以及重大工程地震安全性评价工作提供了新的技术方法. 相似文献
12.
13.
The present study aims at understanding the seismotectonic province of the Shillong Plateau (SP) by identifying the potential seismic source zones within a radius of 500 km from the centre of the SP. From existing literature and earthquake (EQ) data, the seismotectonic region is found to vary in terms of seismicity, tectonic features, geology, thickness of overburden, rupture characteristics and rate of movement. Thus, entire 500-km-radius seismotectonic region is divided into four seismic source zones: namely (1) the Shillong Plateau–Assam Valley Zone (SP-AVZ), (2) the Indo-Burma Ranges Zone (IBRZ), (3) the Bengal Basin Zone (BBZ) and (4) the Eastern Himalaya Zone (EHZ). EQ catalogues for each source zone is analysed for completeness of magnitude and time. Seismic parameter b estimated using a maximum likelihood method is found to be 0.91 ± 0.03, 0.94 ± 0.02, 0.80 ± 0.03 and 0.89 ± 0.03 for the SP-AVZ, IBRZ, BBZ and EHZ, respectively. In addition, the maximum likelihood method is used to estimate the mean annual activity rate, maximum possible magnitude (m max), return period and probability of exceedance for the four zones. The b values estimated suggest that the BBZ is seismically more active; however, the rate of occurrence of EQs is highest in the IBRZ. Findings from this study are an indication of the relative contribution from each of the four seismic source zones towards a seismic hazard of the SP. 相似文献
14.
15.
Two kinds of methods for determining seismic parameters are presented,that is,the potential seismic source zoning method and grid-spatially smoothing method. The Gaussian smoothing method and the modified Gaussian smoothing method are described in detail, and a comprehensive analysis of the advantages and disadvantages of these methods is made. Then,we take central China as the study region,and use the Gaussian smoothing method and potential seismic source zoning method to build seismic models to calculate the mean annual seismic rate. Seismic hazard is calculated using the probabilistic seismic hazard analysis method to construct the ground motion acceleration zoning maps. The differences between the maps and these models are discussed and the causes are investigated. The results show that the spatial smoothing method is suitable for estimating the seismic hazard over the moderate and low seismicity regions or the hazard caused by background seismicity; while the potential seismic source zoning method is suitable for estimating the seismic hazard in well-defined seismotectonics. Combining the spatial smoothing method and the potential seismic source zoning method with an integrated account of the seismicity and known seismotectonics is a feasible approach to estimate the seismic hazard in moderate and low seismicity regions. 相似文献
16.
基于《中国震例》(1970—2013年), 系统清理了246次M≥5.0震例前的地震活动图像异常, 并结合区域差异进行地震空区和地震条带的统计特征研究。 结果显示: ① 在246次震例中, 震前出现地震空区、 地震条带的震例数分别为105次、 51次, 占震例总数的42.7%和20.7%; ② 随着主震震级的增大, 地震空区和地震条带出现的比例逐渐增大, 尤其是7级以上地震, 震前出现地震空区的震例数占同类震例总数的83.3%, 出现地震条带的震例数占同类震例总数的66.7%, 可见地震空区和地震条带可能是7级以上强震的重要异常判据; ③ 针对整个中国大陆及近海, 地震空区和地震条带的持续时间、 展布尺度、 起始震级与主震震级存在一定线性关系, 相关系数能够通过95%置信水平的阈值检验; ④ 各主要构造分区的统计结果差异较大, 青藏高原北部除地震空区持续时间外, 其余地震空区和地震条带参数与主震震级之间的线性关系均通过阈值检验, 南北带中南段和华北地区有个别参数通过检验, 天山地区所有参数均未通过检验。 相似文献
17.
地震安全性评价是防震减灾的重要措施之一。地震危险性分析是地震安全性评价的基础。论文利用安全性评价基本理论和方法对广东省的地震危险性进行分析。以广东省历史上发生的中强地震目录作为研究基础,分析了广东省的地质构造特点和断裂特点,划分潜在地震源、确定地震活动性参数,建立了地震发生概率模型,通过计算得出地震带的综合影响。研究结果表明广东省内具有发生7.5、 6.5、 6.0、 5.5级级段地震的发震条件,其中沿海地区是广东省中、强地震的主要发震区域。 相似文献
18.
根据华北地区的地震目录,建立了4个空间光滑的地震活动性模型,并以这些模型为空间分布函数,将华北地震区每个地震带的地震年发生率分配到空间格点中,计算这一地区的地震危险性.结果表明,采用仪器记录地震计算得到的地震活动性模型和地震危险性结果能够反映华北地区现今的地震活动水平和地震危险性水平,符合人们对现今华北地区地震危险性的认识;采用历史破坏性地震(Mge;4.7)计算的地震活动性模型和地震危险性结果,较好地反映了华北地区中强地震活动区的地震危险性水平;以地震应变计算地震活动率,并根据点椭圆模型和线椭圆模型计算得到的地震活动性模型,能够较好地反映大地震的活动水平和空间构造特征.将根据4个模型计算得到的50年超越概率10%峰值加速度(PGA)分布加权平均,得到综合的华北地区PGA分布,并将该PGA分布与根据《中国地震动参数区划图》中综合潜源方案计算得到的50年超越概率10%的PGA分布做了比较,发现二者无本质差别,均能反映华北地震区的地震危险性水平.当然,二者也具有一定的差异:前者计算得到的符合PGAge;100 cm/s2条件的区域面积明显要比后者的大,而符合PGAge;250 cm/s2条件的区域面积则比后者的要小. 这主要是由于潜在震源区类型和空间分布函数不同造成的. 相似文献
19.
Karin Sesetyan Mine B. Demircioglu Tamer Y. Duman Tolga Çan Senem Tekin Tuba Eroğlu Azak Özge Zülfikar Fercan 《Bulletin of Earthquake Engineering》2018,16(8):3367-3397
The seismic zoning map of Turkey that is used in connection with the national seismic design code (versions issued both in 1997 and 2007) is based on a probabilistic seismic hazard assessment study conducted more than 20 years ago (Gülkan et al. in En son verilere göre haz?rlanan Türkiye deprem bölgeleri haritas?, Report No: METU/EERC 93-1, 1993). In line with the efforts for the update of the seismic design code, the need aroused for an updated seismic hazard map, incorporating recent data and state-of-the-art methodologies and providing ground motion parameters required for the construction of the design spectra stipulated by the new Turkish Earthquake Design Code. Supported by AFAD (Disaster and Emergency Management Authority of Turkey), a project has been conducted for the country scale assessment of the seismic hazard by probabilistic methods. The present paper describes the probabilistic seismic hazard assessment study conducted in connection with this project, incorporating in an area source model, all recently compiled data on seismicity and active faulting, and using a set of recently developed ground motion prediction equations, for both active shallow crustal and subduction regimes, evaluated as adequately representing the ground motion characteristics in the region. The area sources delineated in the model are fully parameterized in terms of maximum magnitude, depth distribution, predominant strike and dip angles and mechanism of possible ruptures. Resulting ground motion distributions are quantified and presented for PGA and 5 % damped spectral accelerations at T = 0.2 and 1.0 s, associated with return periods of 475 and 2475 years. The full set of seismic hazard curves was also made available for the hazard computation sites. The second part of the study, which is based on a fault source and smoothed seismicity model is covered in Demircioglu et al. in Bull Earthq Eng, (2016). 相似文献
20.
"Parametric-historic" Procedure for Probabilistic Seismic Hazard Analysis Part II: Assessment of Seismic Hazard at Specified Site 总被引:3,自引:0,他引:3