首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
The investigation on the seismic behavior of dams becomes crucial but is limited to lack of experimental or field data. This paper aims to experimentally simulate two major dam types of earth-core rock-fill dam and concrete-faced rock-fill dam by dynamic centrifuge tests to investigate the seismic response of the dam. A series of staged centrifuge tests was performed by applying real earthquake records from 0.05 to 0.5g. The distributions of amplification ratio differed depending on the magnitude of earthquake loading and the zoning condition. The amplification ratio at the crest increased in the bedrock acceleration that exceeds 0.3g and strongly influenced by the loosening behavior of the upper part. The residual settlements and horizontal displacement at the dam crest were small. Shallow surface sliding was dominant failure. The maximum tensile stress on the face slab by dynamic loading occurred at a height of around 4/5 near the upstream water level. Finally, two-dimensional numerical simulations were performed in an effort to simulate the centrifuge models. The centrifuge tests and numerical analysis obtained mostly comparable results, thus confirming that centrifuge modeling reasonably simulates the seismic behavior of dams.  相似文献   

2.
土石坝振动台模型试验颗粒流数值模拟分析   总被引:2,自引:0,他引:2  
刘汉龙  杨贵 《地震学刊》2009,(5):479-484
目前一般采用振动台试验、离心振动台试验和有限元动力分析来获得土石坝在设计地震荷载作用下的形态和抗震性能。本文结合孔宪京等的土石坝振动台试验结果开展了颗粒流细观数值模拟研究,克服了传统连续介质力学的宏观连续性假设,形象而直观地表现出坝体在动力荷载作用下的破坏特征。数值模拟规律与振动台试验规律基本一致。同时还分析了坝体颗粒粘结强度和地震峰值加速度变化对坝体破坏特征的影响。数值结果表明,当颗粒间粘结强度较低时,表现为坝体表面颗粒的滑动破坏,粘结强度稍大时,会出现局部的小块颗粒团整体滑动破坏;随着峰值加速度的增大,坝顶沉降量在增大,坝体破坏特征不变。  相似文献   

3.
The aseismic design of concrete faced rock-fill dams (CFRDs) has become vitally important in recent years. A series of 1-g large-scale shaking table model tests were conducted, applying similitude laws to evaluate the effectiveness of various aseismic measures. The following four reinforcing measures are discussed in this study: reinforcing the top zone with geogrid, protecting the downstream slope surface using stone block, replacing the top zone of the dam with cemented rock-fill material or concrete layers. The failure developments were visualised using the particle image velocimetry (PIV) technique. The mechanisms of these reinforcement measures were analysed in detail. The effectiveness of these measures was evaluated by comparing the crest settlement rates and key accelerations corresponding to surface grain yield, slab fracture and slab dislocation. Based on the model test results, a combination of reinforcement measures was proposed for the prototype CFRDs.  相似文献   

4.
Study on the failure process of high concrete dams subjected to strong earthquakes is crucial to reasonable evaluation of their seismic safety. Numerical simulation in this aspect involves dynamic failure analysis of big bulk concrete dam subjected to cyclic loading. The Rock Failure Process Analysis (RFPA) proposed by C.A. Tang, with successful applications to failure modeling of rock and concrete specimens mainly subjected to static loading, is extended for this purpose. For using the proposed model, no knowledge on the cracking route needs to be known beforehand, and no remeshing is required. Simulation of the whole process of elastic deformation, initiation and propagation of microcracks, severe damage and ultimate failure of concrete dams in earthquakes with a unified model is enabled. The model is verified through a shaking table test of an arch dam. Finally a practical gravity dam is employed as a numerical example. Considering the uncertainty in ground motion input and concrete material, typical failure process and failure modes of gravity dam are presented. Several small cracks may occur due to tension particularly at dam neck, dam faces and dam heel, and a few of them evolve into dominant ones. Relatively smaller earthquake may cause damage to the dam neck while a bigger one may bring on cracks at lower parts of the dams. Cracking at the dam bottom may incline to a direction almost perpendicular to the downstream face after propagating horizontally for a certain distance when the shaking is strong enough.  相似文献   

5.
Study on the failure process of high concrete dams subjected to strong earthquakes is crucial to reasonable evaluation of their seismic safety. Numerical simulation in this aspect involves dynamic failure analysis of big bulk concrete dam subjected to cyclic loading. The Rock Failure Process Analysis (RFPA) proposed by C.A. Tang, with successful applications to failure modeling of rock and concrete specimens mainly subjected to static loading, is extended for this purpose. For using the proposed model, no knowledge on the cracking route needs to be known beforehand, and no remeshing is required. Simulation of the whole process of elastic deformation, initiation and propagation of microcracks, severe damage and ultimate failure of concrete dams in earthquakes with a unified model is enabled. The model is verified through a shaking table test of an arch dam. Finally a practical gravity dam is employed as a numerical example. Considering the uncertainty in ground motion input and concrete material, typical failure process and failure modes of gravity dam are presented. Several small cracks may occur due to tension particularly at dam neck, dam faces and dam heel, and a few of them evolve into dominant ones. Relatively smaller earthquake may cause damage to the dam neck while a bigger one may bring on cracks at lower parts of the dams. Cracking at the dam bottom may incline to a direction almost perpendicular to the downstream face after propagating horizontally for a certain distance when the shaking is strong enough.  相似文献   

6.
Two of China's highest earth-core rock-fill dams (ECRDs) and concrete-faced rock-fill dams (CFRDs) were simulated by large-scale earthquake simulation shaking table tests in this work. A series of staged tests were performed, including white noise, different types of earthquake excitations with different magnitudes etc. The seismic performance of the ECRD and CFRD models were analyzed and investigated. The test results indicated that reservoir impoundment influenced the structure and seismic characteristics of the ECRD model much more than the CFRD model. The average fundamental frequency of the CFRD decreased less than the ECRD model when subjected to strong excitation. The acceleration amplification factors decreased as the input peak acceleration increased. The maximum acceleration occurred at the top of the ECRD model, while it occurred at 0.6–0.9 dam height of the CFRD model. Seismic residual deformations of the two models were very small. When subjected to strong earthquake excitation, the residual deformation of the CFRD model was smaller than that of the ECRD model. The dominant failure pattern of the two models was shallow sliding at the height of 3/4 on the downstream slope. The above analysis indicated that seismic performance of CFRD was superior to ECRD.  相似文献   

7.
爆炸荷载下土石坝动力响应特征的数值模拟   总被引:3,自引:0,他引:3  
土石坝在爆炸荷载下的力学响应是一个非常复杂的力学问题,相关研究甚少。在LS-DYNA软件框架内,以两河口土石坝为研究对象,把坝体材料简化为混凝土、心墙、反滤层与堆石体等4种,用500 kg TNT在坝顶接触爆炸时的瞬态荷载作为荷载源,针对不同材料建立适合于爆炸高加载率特征的本构模型,用数值方法分析了土石坝在潜在爆炸荷载下的破坏与损伤演化规律。结果表明,在爆炸荷载作用下,由于土石坝材料组成的多样性,应力波传播规律异常复杂,土石坝的力学响应呈现出显著的分区特征。  相似文献   

8.
Discontinuous deformation analysis (DDA) provides a powerful numerical tool for the analysis of discontinuous media. This method has been widely applied to the 2D analysis of discontinuous deformation. However, it is hindered from analyzing 3D rock engineering problems mainly due to the lack of reliable 3D contact detection algorithms for polyhedra. Contact detection is a key in 3-D DDA analysis. The limitations and advantages of existing contact detection schemes are discussed in this paper, and a new approach, called the incision body (IB), is proposed, taking into account the advantages of the existing methods. A computer code 3DIB, which uses the IB scheme as a 3D contact detection algorithm, was programmed with Visual C^++. Static and dynamic stability analysis for three realistic engineering problems has been carried out. Furthermore, the focus is on studying the stability of a gravity dam on jointed rock foundation and dynamic stability of a fractured gravity dam subject to earthquake shaking. The simulation results show that the program 3DIB and incision body scheme are capable of detecting 3D block contacts correctly and hence simulating the open-close and slide process of jointed block masses. In addition, the code 3DIB could provide an effective tool for evaluating the safety of 3D dam structures, which is quite important for engineering problems.  相似文献   

9.
《国际泥沙研究》2022,37(5):687-700
Globally, between 1950 and 2011 nearly 80,000 debris flow fatalities occurred in densely populated regions in mountainous terrain. Mitigation of these hazards includes the construction of check dams, which limit coarse sediment transport and in the European Alps number in the 100,000s. Check dam functionality depends on periodic, costly maintenance, but maintenance is not always possible and check dams often fail. As such, there is a need to quantify the long-term (10–100 years) geomorphic response of rivers to check dam failures. Here, for the first time, a landscape evolution model (CAESAR-Lisflood) driven by a weather generator is used to replicate check dam failures due to the lack of maintenance, check dam age, and flood occurrence. The model is applied to the Guerbe River, Switzerland, a pre-Alpine catchment containing 73 check dams that undergo simulated failure. Also presented is a novel method to calibrate CAESAR-Lisflood's hydrological component on this ungauged catchment. Using 100-year scenarios of check dam failure, the model indicates that check dam failures can produce 8 m of channel erosion and a 322% increase in sediment yield. The model suggests that after check dam failure, channel erosion is the remobilization of deposits accumulated behind check dams, and, after a single check dam failure channel equilibrium occurs in five years, but after many check dam failures channel equilibrium may not occur until 15 years. Overall, these findings support the continued maintenance of check dams.  相似文献   

10.
石晶  李伟 《地震工程学报》2019,41(6):1506-1513
针对在水库堤坝排水边坡混凝土裂纹的抗震性研究中,未考虑岩土体抗剪强度参数的劣化屈服效应以及混凝土裂纹的老化,存在抗震性判断结果准确率较差等问题,提出水库堤坝排水边坡混凝土考虑老化后产生裂纹的抗震性能研究方法。模拟强震下边坡混凝土的开裂破坏过程,根据D-P屈服准则,实现对闸墩混凝土材料的屈服判断。采用薄层整体单元模拟和分离式裂纹单元,实现混凝土裂纹的数值模拟,加载地震波后,获取混凝土裂纹的强震响应规律与破坏特征。实验结果可知,本文方法对坝体位移变化的研究精度高,得到的混凝土裂纹扩展范围更为准。运用本文方法对水库堤坝排水边坡混凝土的抗震性研究准确率以及可信度较高,说明本文方法具有一定的可取性。  相似文献   

11.
The effects of incoherency and wave-passage on the nonlinear responses of concrete arch dams are investigated in this study. A double curvature arch dam is selected as a numerical example. The reservoir is modeled as a compressible material and the foundation is modeled as a massless medium. Ground motion time-histories are artificially generated using the Monte Carlo simulation approach. Four different finite element models (FEM) are considered: uniform excitation; incoherence effect; wave passage effect; and both incoherence and wave passage effects. It was revealed that modeling multiple-supports excitation could have a significant impact on the structural response of the dam by inducing a pseudo-static effect. Also, it was concluded that the coherency effect overshadows the wave passage effect and the results obtained from non-uniform excitation of FEM, including the wave passage effect, is close to the results of the FEM when it is uniformly excited.  相似文献   

12.
Risk analysis for clustered check dams due to heavy rainfall   总被引:7,自引:1,他引:6  
Check dams are commonly constructed around the world for alleviating soil erosion and preventing sedimentation of downstream rivers and reservoirs.Check dams are more vulnerable to failure due to their less stringent flood control standards compared to other dams.Determining the critical precipitation that will result in overtopping of a dam is a useful approach to assessing the risk of failure on a probabilistic basis and for providing early warning in case of an emergency.However,many check dams are built in groups,spreading in several tributaries in cascade forms,comprising a complex network.Determining the critical precipitation for dam overtopping requires a knowledge of its upstream dams on whether they survived or were overtopped during the same storm,while these upstream dams in turn need the information for their upstream dams.The current paper presents an approach of decomposing the dam cluster into(1)the heading dam,(2)border dams,and(3)intermediate dams.The algorithm begins with the border dams that have no upstream dams and proceeds with upgraded maps without the previous border dams until all the dams have been checked.It is believed that this approach is applicable for small-scale check dam systems where the time lag of flood routing can be neglected.As a pilot study,the current paper presents the analytical results for the Wangmaogou Check Dam System that has 22 dams connected in series and parallel.The algorithm clearly identified 7 surviving dams,with the remaining ones being overtopped for a storm of 179.6 mm in 12 h,which is associated with a return period of one in 200 years.  相似文献   

13.
The cascading failure of multiple landslide dams can trigger a larger peak flood discharge than that caused by a single dam failure.Therefore,for an accurate numerical simulation,it is essential to elucidate the primary factors affecting the peak discharge of the flood caused by a cascading failure,which is the purpose of the current study.First,flume experiments were done on the cascading failure of two landslide dams under different upstream dam heights,downstream dam heights,and initial downstream reservoir water volumes.Then,the experimental results were reproduced using a numerical simulation model representing landslide dam erosion resulting from overtopping flow.Finally,the factors influencing the peak flood discharge caused by the cascading failure were analyzed using the numerical simulation model.Experimental results indicated that the inflow discharge into the downstream dam at the time when the downstream dam height began to rapidly erode was the main factor responsible for a cascading failure generating a larger peak flood discharge than that generated by a single dam failure.Furthermore,the results of a sensitivity analysis suggested that the upstream and downstream dam heights,initial water volume in the reservoir of the downstream dam,upstream and downstream dam crest lengths,and distance between two dams were among the most important factors in predicting the flood discharge caused by the cascading failure of multiple landslide dams.  相似文献   

14.
利用大型振动台模型试验,测得了猴子岩高面板堆石坝缩尺模型坝的动力特性参数,包括大坝结构的自振频率、阻尼比和振型系数等;分析了多种因素对坝体动力特性的影响规律;根据模型试验相似率推算得到原型坝的相应动力特性参数。研究表明:大坝结构有相对稳定的振型;坝体的动力特性参数值受激振白噪声强度和振动历史等因素影响;水库蓄水使得模型坝结构自振频率小幅提升。这些试验结果和研究结论,可以为该坝的动力分析提供基本资料和定性参考。  相似文献   

15.
调查、搜集和研究了汶川地震中被评定为高危以上险情的147座小型水库土坝的地震破坏情况,给出了高危以上险情土坝的地震破坏程度划分为中等破坏、严重破坏和极严重破坏三个等级的原则和标准,以及土坝的地震破坏程度与地震烈度、土坝的宽高比、上游坡比、坝高的经验关系表,可发现:土坝的几何形状对其破坏程度起着重要的作用;对于6~8度地震烈度区,土坝的宽高比越小,或上游坡比越小,或坝体越高,则土坝的破坏程度越严重;对于9度以上地震烈度区,土坝通常发生极严重破坏。依据高危以上险情土坝的地震反应分析结果,给出了土坝地震破坏程度与土坝宽高比、坝高、土坝上游坡比及坝顶加速度放大系数、坝体最大动剪应力的经验关系曲线,发现在相同的地震烈度水平下,土坝的宽高比越小,或上游坡比越小,或坝高越大,且坝顶加速度放大系数越大或坝体最大动剪应力越大,则其地震破坏程度越严重;坝体最大动剪应力超过30kPa的土坝,通常发生严重或极严重破坏,坝体最大动剪应力大于100kPa的土坝,通常发生极严重破坏;土坝离发震断层越远,则其坝顶加速度放大系数越大。本文给出的高危以上险情土坝的地震破坏程度与坝体几何形状的经验关系,可为今后土坝抗震设计提供参考依据。  相似文献   

16.
王娜丽  钟红  林皋 《地震学刊》2012,(2):138-144
如何提高混凝土重力坝薄弱位置的抗震性能是国内外大坝抗震研究的热点问题。本文基于等价静力非线性方法,采用考虑混凝土细观非均匀特性的混凝土损伤模型,研究FRP片材表面加固大坝薄弱位置的抗震有效性。以2座不同形态的混凝土重力坝A、B为例,分别进行坝踵FRP片材表面加固研究和折坡处FRP片材表面加固研究,分析加固前后坝体的应力状态、裂缝扩展情况和破坏形态。数值模拟结果表明:坝踵处采用FRP片材加固可以很好地增强坝体的抗震性能,有效地抑制裂缝的产生和发展;折坡处采用FRP片材加固在一定程度上可以提高坝体的抗震性能,下游坝身加固与否对提高大坝的抗震性能影响不大。  相似文献   

17.
汶川8.0级地震水坝震害调查   总被引:11,自引:1,他引:10  
“5.12”汶川地震中水坝损毁严重,造成了巨大的经济损失。震后对69座溃坝险情和310座高危险情水库水坝进行了系统的调查,典型震害现象包括坝体裂缝、塌陷、滑坡、渗漏、启闭设施损坏和其他附属设施的损毁等。文中给出了不同烈度区的水坝震害分布,并对地震中水坝的震害现象做了初步总结和分析。  相似文献   

18.
To study the effect of a strong underwater shock wave on a concrete dam, this research aims to improve hammer impact methods in model tests. Six 1:200 scale models were designed and tested under distributed impact loads. A device was deployed for a direct measurement of the impact force at the upstream face of the dams. The model dam bases were anchored to prevent displacement. The experimental results indicate that the top part of the concrete dam is a weak zone, and the impact failure initiates with a fracture on the top of the dam. The peak value of impact stress increases when the second crack appears in the concrete dam from the upstream face to the downstream face. And, the level of the second crack in the dam body is lower as the peak value of impact stress increases. In this study, dynamic analysis was conducted by calculating the results to verify the effectiveness of a device to directly measure the impact force. This method may be used to approximately forecast the damage of concrete dam and may also be useful in other engineering applications.  相似文献   

19.
An analysis procedure in the frequency domain is developed for determining the earthquake response of two-dimensional concrete gravity and embankment dams including hydrodynamic effects; responses of the elastic dams and compressible water are assumed linear. The dam and fluid domain are treated as substructures and modelled with finite elements. The only geometric restriction is that an infinite fluid domain must maintain a constant depth beyond some point in the upstream direction. For such an infinite uniform region, a finite element discretization over the depth is combined with a continuum representation in the upstream direction. The fluid domain model approximately accounts for interaction between the fluid and underlying foundation medium through a damping boundary condition applied along the reservoir bottom, while the dam foundation is assumed rigid. Several examples are presented to demonstrate the accuracy of the fluid domain model and to illustrate dam responses obtained from the analysis procedure.  相似文献   

20.
A general procedure for analysis of the response of gravity dams, including hydrodynamic interaction and compressibility of water, to the transverse horizontal and vertical components of earthquake ground motion is presented. The problem is reduced to one in two dimensions considering the transverse vibration of a monolith of a dam, and the material behaviour is assumed to be linearly elastic The complete system is considered as composed of two substructures—the dam, represented as a finite element system, and the reservoir, as a continuum of infinite length in the upstream direction governed by the wave equation. The structural displacements of the dam (including effects of water) are expressed as a linear combination of the modes of vibration of the dam with the reservoir empty. The effectiveness of this analytical formulation lies in its being able to produce excellent results by considering only the first few modes. The complex frequency response for the modal displacements are obtained first. The responses to arbitrary ground motion are subsequently obtained with the aid of the Fast Fourier Transform algorithm An example analysis is presented to illustrate results obtained from this method. It is concluded that the method is very effective and efficient and is capable of producing results to any desired degree of accuracy by including the necessary number of modes of vibration of the dam.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号