首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 531 毫秒
1.
Elucidation of the fluvial processes influenced by dams provides better understanding of river protection and basin management. However, less attention has been given to the erosion intensity distribution of riverbeds and its association with channel morphology and hydrological conditions. Based on hydrological and topographic data, the spatial and temporal distributions of erosion intensity (2002–2014) influenced by the Three Gorges Dam (TGD) were analyzed for the Jingjiang reach of the Yangtze River. The mechanisms underlying the distribution of erosion intensity in response to hydrological conditions were investigated. The results are as follows: (1) The erosion intensities of different discharges were not uniform, and moderate flow (10 000–27 000 m3/s) produced the largest erosion magnitude among all flow ranges. Owing to the hydrological changes caused by flood reduction and prolongation of moderate flow duration after the TGD began operating, up to 70% of the erosion amount was caused by moderate flows. (2) The lateral distribution of erosion intensity was extremely uneven, as the proportion of cumulative erosion of the low‐flow channel within the bankfull channel reached 88% in 2013. This caused the channel to become narrower and deeper. (3) The longitudinal distribution of erosion intensity was inhomogeneous. The erosion intensity in the wide reaches was greater than that in the narrow reaches, leading to smaller differences in channel morphology along the river. (4) Changes in hydrological conditions influenced by the TGD, significant reduction of sediment concentration along with flood abatement, and increased duration of moderate flow discharges were the main factors affecting erosion distribution in the post‐dam period. Our conclusions can be applied to the Yangtze River as a basis for riverbed change estimations, and river management strategies. Copyright © 2018 John Wiley & Sons, Ltd.  相似文献   

2.
Large dams and reservoirs alter not only the natural flow regimes of streams and rivers but also their flooding cycles and flood magnitudes. Although the effect of dams and reservoirs has been reported for some vulnerable locations, the understanding of the inner-basin variation with respect to the effects remains limited. In this study, we analyse the Three Gorges Dam (TGD) built on the Changjiang mainstream (Yangtze River) to investigate the dam effect variations in the system of interconnected water bodies located downstream. We investigated the effect of flow alterations along the downstream river network using discharge time series at different gauging stations. The river–lake interactions (referring to the interactions between the Changjiang mainstream and its tributary lakes i.e. the Dongting and Poyang lakes) and their roles in modifying the TGD effect intensity were also investigated in the large-scale river–lake system. The results show that the water storage of the tributary lakes decreased after the activation of the TGD. Severe droughts occurred in the lakes, weakening their ability to recharge the Changjiang mainstream. As a consequence, the effect of the TGD on the Changjiang flow increase during the dry season diminished quickly downstream of the dam, whereas its impact on the flow decrease during the wet season gradually exacerbated along the mainstream, especially at sites located downstream of the lake outlets. Therefore, when assessing dam-induced hydrological changes, special attention should be paid to the changes in the storage of tributary lakes and the associated effects in the mainstream. This is of high importance for managing the water resource trade-offs between different water bodies in dam-affected riverine systems.  相似文献   

3.
三峡工程运行后,坝下游河道发生持续冲刷。本文研究了长江中游(955 km)不同河段沿程演变差异及其原因。总体而言,河床形态调整幅度自上而下减弱,这是因为在河床持续冲刷过程中,水流含沙量沿程恢复,故越往下游冲刷相对缓慢。平面形态方面,长江中游岸线崩退及洲滩变形的强度均呈沿程减弱趋势,且在荆江河段最为显著。断面形态方面,河床冲深幅度在宜枝下段>荆江河段>宜枝上段>城汉河段>汉湖河段。理论上距离三峡工程最近的河段冲刷应最为剧烈,但由于宜枝上段床沙粗化显著,限制了冲刷的进一步发展。过流能力方面,宜枝河段由于距洞庭湖较远,并未受到入汇顶托作用,故其平滩流量的调整基本由进口水沙条件控制,并随着河床冲深下切而增大;对于荆江、城汉和汉湖河段,河床冲刷虽显著,但支流或湖泊的入汇顶托对平滩流量产生的影响大于前者,故平滩流量总体随上下游水位差同步波动。  相似文献   

4.
The transfer of sediment through a highly regulated large fluvial system (lower Ebro River) was analysed during two consecutive floods by means of sediment sampling. Suspended sediment and bedload transport were measured upstream and downstream of large reservoirs. The dams substantially altered flood timing, particularly the peaks, which were advanced downstream from the dams for flood control purposes. The suspended sediment yield upstream from the dams was 1 700 000 tonnes, which represented nearly 99 per cent of the total solid yield. The mean concentrations were close to 0·5 g l?1. The sediment yield downstream from the dams was an order of magnitude lower (173 000 tonnes), showing a mean concentration of 0·05 g l?1. The dams captured up to 95 per cent of the fine sediment carried in suspension in the river channel, preventing it from reaching the lowermost reaches of the river and the delta plain. Total bedload transport upstream from the dams was estimated to be about 25 000 tonnes, only 1·5 per cent of the total load. The median bedload rate was 100 gms?1. Below the dams, the river carried 178 000 tonnes, around 51 per cent of the total load, at a mean rate of 250 g ms?1. The results of sediment transport upstream and downstream from the large dams illustrate the magnitude of the sediment deficit in the lower Ebro River. The river mobilized a total of 350 000 tonnes in the downstream reaches, which were not replaced by sediment from upstream. Therefore, sediment was necessarily entrained from the riverbed and channel banks, causing a mean incision of 33 mm over the 27 km long study reach, altogether a significant step towards the long‐term degradation of the lower Ebro River. Copyright © 2005 John Wiley & Sons, Ltd.  相似文献   

5.
Construction of large dams is attractive because of their great benefits in flood control,hydropower generation,water resources utilization,navigation improvement,etc.However,dam construction may bring some negative impacts on sediment transport and channel dynamics adjustments.Due to the effects of recent water and soil conservation projects,sediment retention in the newly constructed large upstream reservoirs,and other factors,the sedimentation in the Three Gorges Reservoir(TGR)is quite different from the amount previously predicted in the demonstration stage.Consequently,based on the measured data,characteristics of sedimentation and the related channel deformation in the TGR were analyzed.The results imply that sediment transport tended to be reduced after the Three Gorges Project(TGP).Sedimentation slowed dramatically after 2013 and indicated obvious seasonal characteristics.Due to the rising water level in the TGR in the flood season,the yearly sediment export ratio(Eratio)was prone to decrease.The water level near the dam site should be reasonably regulated according to the flow discharge to improve the sediment delivery capacity and reduce sedimentation in the TGR,and to try to avoid situations where the flood retention time is close to 444 h.The depositional belt was discontinuous in the TGR and was mainly distributed in the broad reaches,and only slight erosion or deposition occurred in the gorge reaches.Sedimentation in the broad and gorge reaches accounted for 93.8% and 6.2% of the total sedimentation,respectively.The estuarine reach located in the fluctuating backwater area experienced alternate erosion-deposition,with a slight accumulative deposition in the curved reach.Sedimentation mainly occurred in the perennial backwater area.The insight gained in this study can be conducive to directly understanding of large reservoir sedimentation and mechanism of channel adjustment in the reservoir region in the main channel of large river.  相似文献   

6.
The discharge hydrograph estimation in rivers based on reverse routing modeling and using only water level data at two gauged sections is here extended to the most general case of significant lateral flow contribution, without needing to deploy rainfall–runoff procedures. The proposed methodology solves the Saint‐Venant equations in diffusive form also involving the lateral contribution using a “head‐driven” modeling approach where lateral inflow is assumed to be function of the water level at the tributary junction. The procedure allows to assess the discharge hydrograph at ends of a selected river reach with significant lateral inflow, starting from the stage recorded there and without needing rainfall data. Specifically, the MAST 1D hydraulic model is applied to solve the diffusive wave equation using the observed stage hydrograph at the upstream section as upstream boundary condition. The other required data are (a) the observed stage hydrograph at the downstream section, as benchmark for the parameter calibration, and (b) the bathymetry of the river reach, from the upstream section to a short distance after the downstream gauged section. The method is validated with different flood events observed in two river reaches with a significant intermediate basin, where reliable rating curves were available, selected along the Tiber River, in central Italy, and the Alzette River, in Luxembourg. Very good performance indices are found for the computed discharge hydrographs at both the channel ends and along the tributaries. The mean Nash‐Sutcliffe value (NSq) at the channel ends of two rivers is found equal to 0.99 and 0.86 for the upstream and downstream sites, respectively. The procedure is also validated on a longer stretch of the Tiber River including three tributaries for which appreciable results are obtained in terms of NSq for the computed discharge hydrographs at both the channel ends for three investigated flood events.  相似文献   

7.
三峡水库运行后长江中游洪、枯水位变化特征   总被引:3,自引:2,他引:1  
韩剑桥  孙昭华  杨云平 《湖泊科学》2017,29(5):1217-1226
流域大型水库蓄水后,坝下游河道调整过程中的洪、枯水位变化,对下游水安全、水生态和水资源利用影响甚大.利用1955-2012年长江中游各水文站水位、流量等资料,采用改进的时间序列分析方法,对三峡水库运行前后长江中游洪、枯水位变化特征进行了研究,结果表明:三峡水库蓄水前长江中游洪、枯水位变化的周期长度分别为9~14、11~15 a,在假设三峡水库运行后水位无趋势性变化的前提下,估算得到的水位变化周期长度基本在20 a以上,蓄水前的自然周期性已被打破,枯水位发生趋势性下降且无复归迹象,而洪水位波动周期虽有所延长,但上升幅度未超过历史波动变幅,仅可确定洪水位没有明显的下降趋势.三峡水库蓄水后坝下游长距离冲刷,枯水河槽冲刷量占平滩河槽的比例逐年增加,累计至2013年已达91.5%,是枯水位下降的主控因素.河槽冲刷导致的床沙粗化增加了河道床面阻力,高程在平滩水位附近的滩体上覆盖的大量植被增加了水流流动阻力,同时大量航道整治、护岸、码头等工程主体部分布设在枯水位以上,综合因素作用使得洪水河槽阻力增加.三峡水库蓄水后,虽然枯水期流量补偿作用显著削弱了枯水位下降的效应,但枯水位下降事实已经形成,不利于航道水深的提高及通江湖泊枯水期的水量存蓄,洪水位未明显下降,同级流量下的江湖槽蓄量不会明显调整.  相似文献   

8.
A refined specific‐gauge approach was developed to quantify changes over time in hydrological response on 3260 km of the Mississippi River system using long‐term data observed at 67 hydrologic measurement stations. Of these stations, 49 were unrated (stage‐only) stations, for which over 2 000 000 ‘synthetic discharges’ were generated based on measured discharge values at nearby rated stations. The addition of these synthetic discharges nearly tripled the number of stations in the study area for which specific‐gauge analysis could be performed. In order to maintain spatial homogeneity across such a broad study area, discharges were normalized to multiples of mean daily flow (MDF). Specific‐gauge analysis calculates stage changes over time for invariant discharge conditions. Two discharges were analysed: low‐flow and flood conditions at each station. In order to avoid the large errors associated with extrapolation of annual rating curves, a new ‘enhanced interpolation’ technique was developed that calculates continuous specific‐stage time series, even for rare discharges. Thus enhanced, specific‐gauge analysis is a useful reconnaissance tool for detecting geomorphic and hydrologic trends over time. Results show that on the Middle Mississippi River and Lower Missouri River, flood stages increased at all stations in spite of widespread incision of the river bed. On the Lower Mississippi River, both low‐flow and flood stages decreased, mainly the result of artificial meander cutoffs in the late 1920s and 1930s, except downstream of Natchez, MS, where net aggradation was observed. On the Upper Mississippi River, the specific‐gauge trends were dominated by emplacement of navigational dams and impoundment of slackwater pools. On all four river reaches, these results document hydrologic responses to the different engineering toolkits used on the different portions of the Mississippi River system during the past 75–150 years. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   

9.
Fully physics‐based, process‐level, distributed fluid flow and reactive transport hydrological models are rarely used in practice until recent years. These models are useful tools to help understand the fundamental physical, chemical, and biological processes that take place in nature. In this study, sensitivity analyses based on a mountain area river basin modelling study are performed to investigate the effect of river channel geometric characteristics on downstream water flow. Numerical experiments show that reduction in the river channel geometric measurement interval may not significantly affect the downstream water stage simulation as long as measurement accuracy at special nodes is guaranteed. The special upstream nodes include but are not limited to 1) nodes located close to the observation station, 2) nodes near the borders of different land covers with considerable riverbed roughness changes, 3) nodes at entering points of tributaries causing discharge jump and 4) nodes with a narrow cross‐section width that may control the flow conditions. This information provides guidelines for field investigation to efficiently obtain necessary geometric data for physics‐based hydrological modelling. It is especially useful in alpine areas such as the Tibetan Plateau where field investigation capability is limited under severe topography and climate condition. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

10.
In this article,the shrinking of Dongting Lake and its progressively weakening connection with the Yangtze River and their impact on flooding before and after the implementation of the Three Gorges Project are analyzed.In recent decades,human activity combined with natural processes has altered the flow of the middle reach channel of the Yangtze River and interfered with its connection with Dongting Lake.This has resulted in progressively more frequent flooding in the area.This study uses hydrological data to analyze the annual maximum discharge and annual maximum stage development of the middle reach of the Yangtze River and Dongting Lake.In recent decades before the Three Gorges Project became operational in 2003,the annual maximum discharge and the maximum stage recorded in the middle reach of the river downstream of Dongting Lake had increased,a result of the weakening of the flood regulation function of Dongting Lake;the annual maximum stage at Luoshan station(downstream,close to the confluence of the Yangtze River and Dongting Lake) had risen by about 2.0 m during 1955-2005,(1.5 m attributed to annual maximum discharge and 0.5 m to river channel deposition).Observational data recorded after the Three Gorges Project was put into operation in 2003,it can be seen that deposition in the Dongting Lake has nearly ceased and the lake's connection with the Yangtze River is stable.It is evident that the flood regulation function of Dongting Lake will continue,and that during the lifetime of the Three Gorges Project,the flood situation in the middle reach of the Yangtze River and Dongting Lake will remain stable.  相似文献   

11.
Among braided rivers developed on the Qinghai-Tibet Plateau of China at very high elevations(>3,500 m),the middle and lower reaches of the Lhasa River have been affected by comprehensive human activities mainly involving dam construction,urbanization,farming,afforestation,and mining.In the current study,the impacts of these human activities on hydrology and morphology of the four braided reaches downstream of a cascaded of two dams are investigated.The study period was divided into 1985-2006(...  相似文献   

12.
Overflow‐driven lateral connectivity significantly influences the spatial distribution and diversity of floodplain habitats and biota. Proper understanding of lateral connectivity in floodplain and backwater channels is therefore critical for assessment of river quality and for targeting management or restoration actions. In this study, we present a methodological framework for spatial and temporal assessments of overflow‐driven lateral connectivity at two spatial scales: bypass reach and backwater channel. Firstly, we compute the relative elevations, as well as overflow discharge, duration, and frequency using a simple, raster‐based method that uses a LiDAR digital elevation model (DEM), rating curves, and streamflow time series. Subsequently, we analyse the accuracy of this approach with respect to the accuracy of a DEM and evaluate its further applications. Altogether, four 10‐km‐long bypass reaches and 11 backwater channels are analysed, located along the Rhône River corridor in France. The results proved the precision of the method to be affected by the LiDAR DEM accuracy, which was on average more precise in a typically homogeneous floodplain setting rather than for backwater channel plugs with pronounced topographic complexity and usually riparian forest canopy. Amongst the four studied reaches, Brégnier Cordon proved to have the greatest flooding dynamics, followed by Belley and Chautagne. The hydrological connectivity pattern of Pierre Bénite differed significantly. Three longitudinal patterns of hydrological connectivity of backwater channels displayed stepwise advancement of the water. The presented results can be used to assess ecological potential of floodplain habitats and their historic and prospective evolution through time. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   

13.
The peak of river floods usually decreases in the downstream direction unless it is compensated by freshwater inflow from tributaries. In the Yellow River (China) the opposite is regularly observed, where the peak discharge of river floods increases in the downstream direction (at a rate far exceeding the contribution from tributaries). This flood peak discharge increase is probably related to rapid morphological changes, to a modified bed friction, or to a combination of both. Yet the relative role of these processes is still poorly understood. This paper aims to analyze the relative contribution of bed erosion and friction change to the peak discharge increase, based on available data and a recently developed numerical model. Using this high-resolution, fully coupled morphodynamic model of non-capacity sediment transport, two hyperconcentrated floods characterized by downstream peak discharge increase are numerically reproduced and analyzed in detail. The results reveal that although erosion effects may contribute to the downstream discharge increase (especially in case of extreme erosion), for most cases the increase must be mainly due to a reduction in bed friction during peak discharge conditions. Additionally, based on the concept of channel storage reduction, the effects of decreasing bed friction and (very strong) bed erosion can be integrated in explaining the peak discharge increase.  相似文献   

14.
Bankfull discharge is a key parameter in the context of river engineering and geomorphology, as an indicator of flood discharge capacity in alluvial rivers, and varying in response to the incoming flow and sediment regimes. Bankfull channel dimensions have significantly adjusted along the Lower Yellow River (LYR) due to recent channel degradation, caused by the operation of the Xiaolangdi Reservoir, which has led to longitudinal variability in cross‐sectional bankfull discharges. Therefore, it is more representative to describe the flood discharge capacity of the LYR, using the concept of reach‐averaged bankfull discharge. Previous simple mean methods to estimate reach‐scale bankfull discharge cannot meet the condition of flow continuity or account for the effect of different spacing between two sections. In this study, a general method to calculate cross‐sectional bankfull discharge using the simulated stage‐discharge relation is outlined briefly, and an integrated method is then proposed for estimating reach‐scale bankfull discharge. The proposed method integrates a geometric mean based on the log‐transformation with a weighted average based on the spacing between two consecutive sections, which avoids the shortcomings of previous methods. The post‐flood reach‐scale bankfull discharges in three different channel‐pattern reaches of the LYR were estimated annually during the period from 1999 to 2010 using the proposed method, based on surveyed post‐flood profiles at 91 sedimentation sections and the measured hydrological data at seven hydrometric sections. The calculated results indicate that: (i) the estimated reach‐scale bankfull discharges can effectively represent the flood discharge capacity of different reaches, with their ranges of variation being less than those of typical cross‐sectional bankfull discharges; and (ii) the magnitude of the reach‐scale bankfull discharge in each reach can respond well to the accumulative effect of incoming flow and sediment conditions. Finally, empirical relationships for different reaches in the LYR were developed between the reach‐scale bankfull discharge and the previous four‐year average discharge and incoming sediment coefficient during flood seasons, with relatively high correlation coefficients between them being obtained, and the reach‐scale bankfull discharges in different reaches predicted by the delayed response model were also presented for a comparison. These relations for the prediction of reach‐scale bankfull discharges were validated using the cross‐sectional profiles and hydrological data measured in 2011. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

15.
ABSTRACT

Accurate assessment of stage–discharge relationships in open channel flows is important to the design and management of hydraulic structures and engineering. Flow junctions commonly occur at the confluence of natural rivers or streams. The effect of flow junctions on the stage–discharge relationship at mountain river confluences was found by measuring velocity fields and water levels in experimental models. The results show that the backwater and accumulation–separation at flow junctions affect the flow structures and patterns in the channel; also, flow confluences may induce complex flow characteristics of backwater and flow separation at river junctions, indicating potential submerged flooding disasters within the confluence zone. The impacts of flow junctions on the stage–discharge relationship are investigated for two physical confluence models built from river confluence prototype systems in southwest China. The results show that the presence of tributary river inflows tends to increase the water level of the main river. This is important for flood control, flood-risk evaluation and engineering (e.g. hydropower station construction) in mountain rivers. Finally, a comparative quantitative analysis based on flow motion equations is conducted to evaluate the stage–discharge relationship in both uniform and regular confluence systems. The results indicate that more accurate prediction can be made when taking into account the flow non-uniformity induced by flow separation, backwater and distorted bed in the junction region.  相似文献   

16.
The Tongariro Power Development Scheme (TPDS) is used to regulate flow in the headwaters of the largest catchment on the North Island of New Zealand (the Waikato). Two small dams, the Rangipo Dam and the Poutu Intake Dam, were constructed in 1973 and 1983. The flow regime of the river is managed to divert freshes into the power scheme, but allows flows larger than 100 m3 s?1 to be released, to rework and transport sediment through the catchment. Analysis of aerial photos and maps spanning 1928 to 2007, alongside field measurements, show that there have been few hydrogeomorphic adjustments since dam construction. This includes limited changes to channel geometry, channel planform and bed material organization immediately downstream of the dams. In addition, offsite effects are minimal, both 500 m downstream of each dam, and in the more sensitive, less confined reaches in the lower catchment (11 km downstream of the Poutu Intake dam). The limited changes can be attributed to the locations of the dams within reaches characterised by bedrock gorges and confined within terraces. These locations act to flush sediments and impose margins that allow minimal adjustment of the channel. Bed material within this reach is characterised by the presence of a boulder lag. This is sourced from long-term incision into lahar deposits, and acts to limit the rate of incision, creating a steep and stable base upon which active fractions are transported. Just as importantly, significant storage in the low-relief volcanic plateau located in the upper catchment acts to disconnect and store the high sediment yields generated by active volcanic cones in the western sub-catchment upstream of the dams. This limits the rate of sediment supply to regulated reaches. Findings from this study show that analysis of reach-scale controls is essential in framing dam site locations in relation to the distribution of reaches and landscape units across the catchment. In this instance, tributary inputs downstream of the dams do not replenish the sediment and flow removed at the dam locations, as has been observed in other regulated systems. Rather, the river itself is resilient to change and flow variability is well managed allowing geomorphically effective floods to occur. Landscape setting is a key consideration in determining the hydrogeomorphic impact of flow regulation.  相似文献   

17.
Reservoir release wave routing during 33 controlled reservoir releases, along 15 upland boulder bed river channel reaches, on five different regulated rivers were monitored to assess the importance of river channel roughness and reservoir release magnitude on reservoir release wave speeds. Wave speeds varied between 0.52 and 3.01 m s?1. Reservoir release wave translation, steepening, and attenuation occurred. With high channel roughness values reservoir release wave arrival speed is retarded in comparison to peak stage and wave steepening occurs, but with a reduction in channel roughness reservoir release wave front arrival is accelerated producing attentuation. The threshold between reservoir release wave front attenuation and steepening occurs at a pre-release discharge/channel width of approximately 0.1, an index of channel roughness. The paper also demonstrates, via comparison of observed and calculated reservoir release wave speeds on the River Washburn, Yorkshire, the difficulty of accurately predicting flood wave movement in upland boulder bed channels using existing prediction equations. The calculated values, however, revealed systematic error with pre-release discharge and reservoir release magnitude. Apparently the equations fail to account for the effects of high channel roughness together with pressure gradient forces, induced by rapid rates of stage change on the rising limb of reservoir releases. In order to accurately predict reservoir release wave movement in regulated rivers, this paper demonstrates that hydraulic studies need to be undertaken and pre-release discharges prescribed to determine desired reservoir release wave routing behaviour. Manipulation of the reservoir release pattern at the dam alone, cannot dictate reservoir release wave front form downstream or wave speed.  相似文献   

18.
Water scarcity and climatic variability in the Mediterranean region have traditionally required the construction of dams to guarantee water supply for irrigation, industrial and urban uses and hydropower production. Reservoirs affect the hydrology of the river downstream, but the magnitude and persistence of these effects are still poorly unknown. Understanding the magnitude of these effects is the objective of this paper, in which we analyse the flow regimes of twelve rivers located in the NW Mediterranean region. Different temporal scales (daily, monthly and annual) are used for the analysis and also to estimate flow variables associated with flow magnitude, frequency, duration and variability. It is shown that dams alter the hydrological regime of most of the studied rivers, with special influence on monthly flows and flood magnitude and frequency. The most altered rivers (Muga and Siurana, NE Iberian Peninsula) experience a complete overturn in their flow regime with, for instance, flood reduction reaching up to 76% for the 2‐year flood event. Other rivers showed lower changes in hydrology (e.g. Orb and Têt). Annual runoff showed a pattern of decrease in all the studied rivers (regulated and non‐regulated) indicating that besides dams (i.e. reservoir evaporation), other factors likely affect water yield. A general recovery downstream from dams is also observed at all temporal scales, mainly because of the inflow from tributaries. Although dams have a clear impact on the hydrology of Mediterranean rivers, water withdrawals and diversions for irrigation and other consumptive uses also affected the hydrological patterns. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

19.
The peak in sediment transport in alluvial rivers generally lags behind the peak in discharge. It is thus not clear how the hysteresis in the sediment/discharge relationship may be impacted by damming, which can fundamentally alter the water and sediment regimes in the downstream reaches of the river. In this study, a total of 500 flood events in the Yichang–Chenglingji Reach (YCR) of the Middle Yangtze River immediately downstream of the Three Gorges Dam (TGD) are analysed to study the impacts of dam operations on the hysteresis of suspended sediment transport. Sediment rating curves, hysteresis patterns, as well as lag times, are investigated to determine the relationship between suspended sediment concentration (SSC) and flow discharge (Q) at different temporal scales, from inter-annual to individual flood events, for the pre- and post-TGD period from 1992 to 2002 and from 2003 to 2017, respectively. The results showed that the TGD operation decreased the frequency and magnitude of floods. The decrease in peak flow and increase in base flow weakened the flood contribution to the annual discharge by nearly 20%. However, the relative suspended sediment load contribution during flood events was much higher than the discharge contribution, and was little impacted by the dam. At seasonal and monthly scales, more than 80% of the suspended sediment was transported by ~65% of the water discharge in the summer and early autumn. The monthly SSCQ relationship changed from a figure-eight to an anti-clockwise pattern after the construction of the TGD. For single flood events, the TGD operations significantly modified the downstream SSCQ hysteresis patterns, increasing the frequency of anti-clockwise loops and the lag time between peak Q and peak SSC. These adjustments were mainly caused by differences in the propagation velocities of flood and sediment waves and the sediment ‘storage–mobilization–depletion’ process, whereas the influence of lateral diversions was small. © 2020 John Wiley & Sons, Ltd.  相似文献   

20.
《水文科学杂志》2012,57(2):311-324
ABSTRACT

In semi-arid regions, reduced river flows present is a major challenge in water resources management. We present a new standardized contribution of rainfall to runoff index (SCRI) for evaluating changes in rainfall contribution to river flow. We employ the standardized precipitation index (SPI), standardized discharge index (SDI) and SCRI to characterize meteorological drought, hydrological drought and land-use change impacts on river flow, respectively. These indices are applied to the Mond River Basin (Iran), which is regulated by the Salman Farsi and Tangab dams since 2006. A new concept called “mirage water” is proposed that represents the reduced water delivery to downstream areas due to new developments and water withdrawals in headwater tributaries. In particular, mirage water accounts for changes in upstream water consumption between the planning phase and construction/operation life of dams. We recommend that this concept be used for communication with decision-makers and managers to clarify the need for revising dimensions of planned dams.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号