1.
This paper encompasses the engineering geological properties of rock mass along the power tunnel of hydropower in Kohistan, Khayber Pakhtun Khawa (KPK), Pakistan. The major geological units of the study area are Chilas complex (CC) and Gilgit complex (GC) that consists mostly of igneous and metamorphic rocks. Discontinuity surveys were conducted to classify the rock mass by utilizing rock mass rating (RMR) and tunneling quality index (Q) classification systems. RMR system involves collection of data for parameters of rock strength, RQD, spacing of discontinuities, condition of discontinuities, groundwater condition and Q system involves rock quality designation (RQD), joint roughness (Jr), joint sets (Js), joint alteration (Ja), stress reduction factor (SRF) and joint water reduction (Jw). RMR values ranges from 46 to 66 (fair to good) for rock unit of Chilas complex (CC) and 50 to 58 (fair) for rock unit of Gilgit complex (GC). The evaluated values of tunnel quality by Q-system are 1.55 to 6.4 (poor to fair) for Chilas complex (CC) and 1.35 to 1.84 (poor) for Gilgit complex (GC). The required support along the tunnel route is also estimated by both classification systems. Unwedge program is used to analyze the unstable zones due to the intersection of different joint sets. Total 14 cases are analyzed in Unwedge from which 3 cases have failure potential with FOS less than 1. These failure potential blocks can become stable by applying further support of rock bolting and shotcrete layer.  相似文献   

2.
Visualization of rock mass classification systems   总被引:2,自引:1,他引:2  
A rock mass classification system is intended to classify and characterize the rock masses, provide a basis for estimating deformation and strength properties, supply quantitative data for mine support estimation, and present a platform for communication between exploration, design and construction groups. In most widely used rock mass classification systems, such as RMR and Q systems, up to six parameters are employed to classify the rock mass. Visualization of rock mass classification systems in multi-dimensional spaces is explored to assist engineers in identifying major controlling parameters in these rock mass classification systems. Different visualization methods are used to visualize the most widely used rock mass classification systems. The study reveals that all major rock mass classification systems tackle essentially two dominant factors in their scheme, i.e., block size and joint surface condition. Other sub-parameters, such as joint set number, joint space, joint surface roughness, alteration, etc., control these two dominant factors. A series two-dimensional, three-dimensional, and multi-dimensional visualizations are created for RMR, Q, Rock Mass index RMi and Geological Strength Index (GSI) systems using different techniques. In this manner, valuable insight into these rock mass classification systems is gained.  相似文献   

3.
This paper describes the results of the engineering geological investigations and rock mechanics studies carried out at the proposed Uru Dam site. Analyses were carried out in terms of rock mass classifications for diversion tunnel, kinematic analysis of excavation slopes, permeability of the dam foundation and determination of rock mass strength parameters.Uru Dam is a rock-filled dam with upstream concrete slab. The dam will be built on the Suveri River in the central part of Turkey. The foundation rocks are volcanic rocks, which consist of andesite, basalt and tuff of Neogene Age. Studies were carried out both at the field and the laboratory. Field studies include engineering geological mapping, intensive discontinuity surveying, core drilling, pressurized water tests and sampling for laboratory testing.Uniaxial, triaxial and tensile strength tests were performed and deformation parameters, unit weight and porosity were determined on the intact rock specimens in the laboratory. Rock mass strength and modulus of elasticity of rock mass are determined using the Hoek–Brown empirical strength criterion. Rock mass classifications have been performed according to RMR and Q systems for the diversion tunnel.Engineering geological assessment of the proposed dam and reservoir area indicated that there will be no foundation stability problems. Detailed geotechnical investigations are required for the final design of the dam.  相似文献   

4.
Water leakage problems in unlined or shotcrete lined water tunnels are not new issues. In many occasions severe water leakage problems have been faced that not only have reduced the stability of the rock mass, but also have caused valuable water to be lost from it, causing safety risk as well as huge economic loss to the projects. Hence, making tunnels water tight plays an important role in improving stability and safety of underground excavations. The real challenge is however accurate prediction and quantification of possible water leakage, so that cost consequences can be incorporated during planning of a water conveying tunnel project. The main purposes of this paper are to analyze extensive data on leakage test carried out through exploratory drillhole used to define the need for pre-injection grouting of Khimti headrace tunnel and to carry out probabilistic approach of uncertainty analysis based on relationship established between leakage, hydrostatic head and selected Q-value parameters. The authors believe that the new approach regarding uncertainty analysis of leakage presented in this paper will improve the understanding of leakage characteristics of the rock mass, and hope this will lead to a better understanding concerning quantification of possible water leakage from unlined and shotcrete lined water tunnels.  相似文献   

5.
地下隧洞开挖和支护的三维数值分析计算   总被引:4,自引:0,他引:4  
肖明  叶超  傅志浩 《岩土力学》2007,28(12):2501-2505
根据地下工程锚固支护原理,采用隐含锚杆柱单元的三维有限元和混凝土喷锚支护的三维数值计算方法,对复杂的地下泄洪隧洞的开挖和支护进行了分析计算。该方法不仅能够有效地反映锚杆的长度、密度、倾角对洞室开挖的影响,而且能够较好地模拟钢拱架和锚杆的时间施加效应。由于隐含锚杆柱单元和喷层单元是隐含在岩体单元中的,所以锚杆和喷层单元不受岩体单元划分的影响,能够有效地模拟各种支护方案,加快计算速度,合理反映锚固支护所作用的位置和时间影响。通过对构皮滩泄洪洞施工开挖和锚固支护的模拟计算,论证了施工开挖的稳定性和锚杆、喷层、钢拱架的支护作用,提出了洞室结构的加固措施,为工程施工开挖提供了有效的设计依据。  相似文献   

6.
三峡永久船闸高边坡开挖三维离散元数值模拟   总被引:12,自引:5,他引:12  
李世海  高波  燕琳 《岩土力学》2002,23(3):272-277
采用面-面接触的三维离散元刚性块体模型,从实测节现面中取出其中的三组,按照其倾向,倾角和节理间距将三峡永久船闸未开挖的区域划分为10^5个离散单元,通过施加力边界条件,给出了与实测初始地应力场接近的数值模拟结果;然后,分4步模拟了永久船闸的开挖过程。计算结果表明:开挖过程会引起节理面出现张开趋势,个别岩体还会沿着节理面滑移。岩体位移的不对称现象较为自然地说明了由节理引起的岩体各向异性特征。  相似文献   

7.
陶忠平 《岩土力学》2006,27(Z2):507-510
简要地介绍了对水工地下洞室施工中对围岩不稳定体,即碎裂岩体、松动岩体、软弱结构面、楔形体结构面等围岩喷锚支护结构的作用,喷锚支护结构的使用。  相似文献   

8.
北京地区十三陵抽水蓄能电站的引水洞穿过破碎岩体时,因地质条件很差而在开挖初期发生了塌方险情。抢险后及时进行了洞内位移监测。监测结果显示原设计所使用的挂网锚喷加钢拱架组成的支护结构变形较大,特别是在边墙部位,变形更加明显。根据监测结果对引水洞的支护方案进行了重要修改:加密钢拱架和挂网钢筋,并增加喷射混凝土厚度,在洞底增加仰拱。施行上述措施后,洞体位移收敛变小,并趋于稳定,达到了设计和安全使用要求。该可变更设计的成功,充分说明了在工程地质条件复杂,难以准确界定的情况下,信息化施工与可变更设计的重要性。  相似文献   

9.
10.
Determining in-situ soil or rock geotechnical properties is a difficult task for a design engineer. Back analysis is a helpful technique for evaluating soil property by considering and measuring the convergence of an underground opening. Back analysis was performed by matching numerical modeling results with the measured tunnel convergence. The main purpose of this study was to determine optimum rock mass properties using back analysis in order to suggest the best and most economical support system. Accordingly, the difference between measured and calculated convergence values was minimized by using an error function (objective function). In this paper, through the parameters obtained from back analysis, a support system based on a set consisting of shotcrete, wire mesh, and lattice girder was suggested for the Babolak water conveyance tunnel in Mazandaran, Iran. Therefore, the suggested design was based on decreasing shotcrete thickness from 25 to 20?cm and eliminating of rock bolts.  相似文献   

11.
Summary The critical excavation depth of a jointed rock slope is an important problem in rock engineering. This paper studies the critical excavation depth for two idealized jointed rock slopes by employing a face-to-face discrete element method (DEM). The DEM is based on the discontinuity analysis which can consider anisotropic and discontinuous deformations due to joints and their orientations. It uses four lump-points at each surface of rock blocks to describe their interactions. The relationship between the critical excavation depth D s and the natural slope angle α, the joint inclination angle θ as well as the strength parameters of the joints c r r is analyzed, and the critical excavation depth obtained with this DEM and the limit equilibrium method (LEM) is compared. Furthermore, effects of joints on the failure modes are compared between DEM simulations and experimental observations. It is found that the DEM predicts a lower critical excavation depth than the LEM if the joint structures in the rock mass are not ignored.  相似文献   

12.
梁宁  伍法权  王云峰  包含 《岩土力学》2016,37(Z2):329-336
甘肃省关山隧道是一条受高地应力影响的大埋深硬脆性闪长岩铁路隧道,位于青藏高原东北缘,构造活跃,运动速率较大,且方向变化显著的六盘山挤压隆升构造区。在隧道开挖过程中围岩变形破坏现象明显,围岩等级低于前期岩体质量分级,表现出强烈的岩体质量劣化和各向异性。针对该问题,除了采用矿物成分和微结构分析寻找原因,还通过现场结构面统计分析对围岩质量劣化和各向异性进行描述,同时运用自行研发的钻孔电视进一步分析开挖前后一定时间间隔内围岩的渐进式变形和破坏。钻孔电视试验结果表明,尽管闪长岩作为一种硬脆性岩体,单轴抗压强度(UCS)高于现场地应力值,但其变形和破坏却普遍发生,开挖过程中新生裂隙迅速发育,原先在高地应力下闭合的裂隙也会重新张开和发展,围岩劣化,稳定性降低。为了进一步分析围岩的变形破坏过程,设计了变压力大小和方向的单轴抗压试验,试验中闪长岩的单轴压力值低于单轴抗压强度,试验结果与钻孔电视试验观测结果吻合,证明了在开挖引起的地应力剧烈变化条件下硬脆性闪长岩结构劣化,存在变形破坏的可能性。在大埋深高地应力条件下,除了岩体的各向异性,地应力的变化也是硬脆性围岩稳定性的重要考量因素。  相似文献   

13.
Engineering geological properties and support design of a planned diversion tunnel at Guledar dam site, which was located at the North of Ankara, Turkey were studied in this article. The main purpose of the construction of the planned tunnel is to regulate, drainage and to provide water for irrigation purposes. The diversion tunnel runs mainly through formations of limestone, sandstone and diabase. Rock masses at the site were characterized using Rock Mass Rating (RMR), Rock Mass Quality (Q), Rock Mass Index (RMi) and Geological Strength Index (GSI). RMR, Q, RMi and GSI were determined by using field data and mechanical properties of intact rock samples, measured in the laboratory. Support requirements for the planned diversion tunnel were determined accordingly in terms of the rock mass classification systems. Recommended support systems by empirical methods were also analyzed using 2D Finite Element method. Calculated parameters based on empirical methods were used as input parameters in the finite element models. The results from both methods were compared with each other. This comparison suggests that more reliable support design could be achieved by using the finite element method together with the empirical methods.  相似文献   

14.
Summary The lining concept of the 15.4 km long one-track Furka railway tunnel is described with particular emphasis on shotcrete application as a permanent support Altogether 70000 m3 dry aggregate/ cement mix and 115000 rock bolts have been applied. The tunnel was lined at a rate of approx. 400 tunnel metres per month using up to five shotcrete machines simultaneously. Systematic quality control throughout the construction work indicated an average uniaxial compressive strength of shotcrete of 40 N/mm2. The support requirements were grouped into 16 different classes and an additional special class accounting for extreme geological conditions in some relatively short stretches.  相似文献   

15.
多年冻土隧道修建中,施工活动产生的热量将导致多年冻土围岩中出现一定范围的融化圈,进而影响支护的受力以及隧道洞室的收敛。将围岩分为融化区和未融化区,将融化区围岩视为弹塑性介质,未融化区围岩视为弹性介质,建立并求解融化作用下多年冻土隧道围岩弹塑性模型,对不同的围岩条件及支护工况下多年冻土段隧道施工中围岩与支护的相互作用进行分析。结果表明,该模型表现了融化作用下多年冻土围岩与支护相互作用的特征;在较差围岩中,喷射混凝土支护的强度是控制融化作用下多年冻土围岩稳定以及隧道周边位移量的关键因素。在多年冻土隧道施工中,可采用本模型确定施工中容许的最大围岩融化深度,施工中应采取有效措施避免围岩中出现过大的融化圈。  相似文献   

16.
张玉军  徐刚 《岩土力学》2013,34(Z1):430-436
假定一个核废料地质处置库位于具有一定水头的饱和节理岩体中,开挖完闭施作系统锚杆和喷混凝土支护。对坑道建造和一个50年期的热-水应力(T-H-M)耦合运营过程,使用UDEC程序进行数值模拟,分析无、有支护时近场围岩中的应力、变形、塑性区、温度、渗流的变化状态,以及不同场(温度、渗流、应力)耦合条件下的锚杆和喷混凝土中的承载情况。结果显示,喷混凝土和系统锚杆支护不仅具有常规的支护功能,并且可阻滞地下水从坑道表面的自由渗出,使得围岩中塑性区减小,裂隙水压力和温度升高;相比于应力单场作用的情况,在热-水-力耦合的条件下洞室围岩的稳定性下降,支护结构的受力状况变差。  相似文献   

17.
甘肃北山地质处置库围岩节理抗剪强度经验估算   总被引:3,自引:0,他引:3  
节理抗剪强度参数是地质处置库预选地段工程地质对比和围岩稳定性分析的重要指标。本文在旧井地段英云闪长岩节理分组的基础上,运用定向统计测量方法估测节理粗糙度系数,通过评价节理粗糙度系数的尺寸效应,确定节理抗剪强度经验估算有效长度,由JRC-JCS模型求得各组节理4个方向的抗剪强度参数,并评价了地质处置库围岩节理抗剪强度的各向异性特征。  相似文献   

18.
19.
张德华  刘士海  任少强 《岩土力学》2015,36(6):1707-1713
隧道结构的围岩-支护特征曲线理论表明,初期支护强度变化及支护时机将极大地影响隧道周围围岩的变形及应力分布。相应地,作为初期支护重要组成部分的喷射混凝土,其喷射后的强度增长变化规律及硬化速度也极大地影响着围岩的变形及应力重分布。为探明喷射混凝土的强度增长规律及其硬化速度对初期支护性能的影响,结合隧道工程实践,进行了一系列喷射混凝土现场试验,建立了喷射混凝土强度和弹性模量增长规律,确定了喷射混凝土硬化速度对初期支护性能的影响规律。分析表明:(1)隧道喷射混凝土早期强度发展较快、较平稳,24 h抗压强度平均值为6.4 MPa,48 h抗压强度平均值为11.4 MPa。(2)在软弱围岩中提高喷混凝土的早期强度十分重要,是控制围岩变形和稳定的关键,喷混凝土早期强度越大,隧道初期支护作用越明显。(3)喷混凝土硬化速度对控制拱顶沉降变形效果较显著。与慢速硬化相比,喷射混凝土快速硬化时拱顶沉降减少10.4%,拱脚处减小17%,边墙水平收敛减少了30.7%。(4)喷射混凝土硬化速度对控制围岩塑性变形方面差异较小。(5)应充分考虑喷射混凝土的强度硬化过程,不考虑喷射混凝土硬化速度会在一定程度上高估初期支护性能,使其相应支护结构位移明显小于考虑硬化速度时相应的结构位移。  相似文献   

20.
混凝土喷层支护节理岩体等效力学模型及其应用   总被引:1,自引:0,他引:1  
付成华  周洪波  陈胜宏 《岩土力学》2009,30(7):1967-1973
考虑喷层在节理面局部的限剪和限裂作用,提出喷层支护节理岩体流变模型,在此基础上推导出喷层支护节理岩体的本构关系,建立了一种喷层支护节理岩体等效力学模型。采用该模型进行结构有限元计算,喷层、节理均不需要离散网格,进行等效模拟;当实际节理裂隙的数量与方向或喷层的厚度变化时,也不需要变化计算网格,从而可降低前处理工作量,为大型复杂结构的计算分析提供较大便利。最后,通过算例和实际工程验证了该模型的有效性--不仅具有离散模型便于模拟喷层真实作用机制的优点,而且具有等效模拟简单易行的优点,具有较好的工程应用前景。  相似文献   