1.
Abstract

The overlying rock thickness of a subsea tunnel controls its vertical line. It not only ensures the safety and stability of tunnel construction period and operation period, but also ensures the economy of subsea tunnel. In the current research, few papers give full consideration to the complex indicators of prediction the overlying rock thickness. However, in this study, a hybrid intelligent system was established to predict the overlying rock thickness of a subsea tunnel based on Qingdao Kiaochow Bay Subsea Tunnel, China. The sea depth, basic quality index of rock mass, soft soil layer thickness, permeability coefficient, and construction management level were selected as the main factors influencing the overlying rock thickness. Using the data obtained from project site exploration, objective weight factors were calculated using rough set theory, and subjective weight factors were calculated using the analytic hierarchy process. Furthermore, the combination of weights was obtained for each factor. Finally, the weight of influencing factors was incorporated into the extension model, and the overlying rock thickness of pending section was calculated. The results of overlying rock thickness prediction model are consistent with the actual value, indicating that the model has good engineering applicability and application value.  相似文献   

2.
More and more deep-seated long submarine tunnels are under construction, which greatly promotes the development of tunneling technology. The complex geological conditions and frequent geological disasters have become great challenges during submarine tunnel excavation. Among them, casualties and economic losses caused by water inrush are on the top levels in all kinds of tunnel geological disasters. Escape routes after water inrush from the working face during submarine tunnel excavation are investigated and optimized in the present study. Numerical simulations are performed using the FLUENT software to probe water flow characteristics after inrush. Two common cases of water inrush during double-line submarine tunnel excavation are researched. The variation rules of velocity and pressure in the tunnels after inrush are analyzed and discussed. The optimized escape routes are achieved. Finally, the water movement laws after inrush from the working face under different excavation situations are further discussed by comparing the two case studies. Water inrush of high velocity occurs on one working face of the double-line submarine tunnel, and the research results are as follows: (1) The velocity close to the tunnel side wall is the minimum, while it is the maximum in the middle position. (2) The pressure changes greatly at the intersection area of the cross passage and the tunnels. (3) The velocity and pressure nearby the working face without water inrush are both small. (4) The velocity at the high location of the cross passage is relatively small.  相似文献   

3.
Abstract

Fault fracture zones have always been a key problem in the construction of submarine tunnels. To efficiently summarize the safety impact of different construction schemes on a submarine tunnel crossing a fault fracture, a theoretical model using numerical simulation has been established via the benching tunnelling construction method, three-step method, Center Diaphragm method (CD method), both sides heading method, Cross Diaphragm method (CRD method) and two kinds of supporting methods: pre-grouting and shotcreting. Numerical simulation studies on the excavation and support of submarine tunnels crossing fault fracture zones have been carried out. The research indicates: the fracture zone is the main area where sedimentation instability occurs; the CRD method has the lowest horizontal convergence under the support of the diaphragm; increasing the grouting strength is more effective in controlling the deformation of the surrounding rock than increasing the range of the pre-grouting and the thickness of the shotcrete in the initial support is increased, and its resulting effect is obvious. To optimize the construction scheme, we compared the settlement, horizontal convergence and surrounding rock stress of the tunnel according to the simulation results of different excavation support methods, which could provide theoretical guidance for better on-site construction techniques.  相似文献   

4.
During the construction process of Qingdao Jiaozhou Bay Undersea Tunnel, the faults and other unfavorable geological discontinuities were often encountered. To study the water inrush mechanism in the faults, both physical model test and numerical analysis were carried out. The results of crown displacement and hydraulic pressure of the monitoring sections in the physical model and numerical model were analyzed in this paper. It was found that the displacement and hydraulic pressure in the process of tunnel construction are often interacted as both cause and effect, and the lower of hydraulic pressure is often accompanied with the growth of its displacement. The changing of the excavation disturbed zone during the excavation in the undersea tunnel was also studied. The results show that the excavation disturbed zone in fault is larger than that in surrounding rock mass, and the excavation disturbance effects in the filling type fault are both transient and persistent. When the displacement and hydraulic pressure in the undersea tunnel change sharply during excavation, there are relatively slow and continuous change trend of the displacement and hydraulic pressure. For practical purposes, to prevent water inrush in the undersea tunnel, more attentions should also be paid to the undersea tunnel after excavation.  相似文献   

5.
许文锋 《台湾海峡》2009,28(1):102-106
由于海底隧道的特殊性,其防排水技术与一般陆地隧道有着显著区别,本文介绍了厦门翔安海底隧道的防排水方案设计情况,对方案实施效果进行了评估.得出了海底隧道防排水应结合围岩与支护的自防水功能采取以堵为主的原则,并针对海底隧道防排水方案实施中的问题,提出了对初期支护背后注浆是重点,改进注浆材料等建议.从而论述了防排水技术是海底隧道工程建设的核心问题.  相似文献   

6.
许文锋 《海洋工程》2009,27(3):117-121
针对采用定值相对极限位移判定隧道围岩稳定性时存在的问题,提出了采用模糊概率理论判定隧道围岩稳定的计算方法.结合厦门翔安海底隧道工程实际,利用曲线回归和模糊概率方法对海底隧道围岩稳定性概率进行了计算分析.参考现行规范并根据海底隧道各个开挖步的变形量综合确定极限相对位移上下限,采用指数函数对海底隧道CRD1部和CRD3部的拱顶下沉收敛曲线进行了回归分析.根据回归参数及实测结果,应用模糊概率公式对隧道围岩的稳定性概率进行了计算,从而为根据某个时刻的相对位移来判断海底隧道稳定性提供了参考.  相似文献   

7.
ABSTRACT

An evaluation of the stability of subsea tunnels during operation is very important considering the risks involved with subsea tunnels. Although a large volume of monitoring information can be obtained, back analysis has been performed based on the internal displacement. In this study, the efficiency of an estimation of the safety of an operating subsea tunnel has been improved by implementing the back analysis algorithm based on various monitoring information. The differential evolution algorithm was adopted for back analysis of an operating subsea tunnel. The differential evolution algorithm was improved to accommodate the multiple target variables for back analysis, such as the elastic modulus, cohesion, friction angle of the ground, and the time-dependent elastic modulus of concrete lining. In addition, the elastic modulus of the concrete lining and the properties of reinforced ground can be evaluated with the proposed algorithm using a range of monitoring data, such as the internal displacement and stress acting on the lining. In summary, back analysis with a differential evolution algorithm can be used to evaluate the stability of an operating subsea tunnel.  相似文献   

8.
The presence of a fractured zone at a tunnel face can threaten the stability of the tunnel by causing water leakage and degradation of the soil strength. In this case, to stabilize the tunnel face, the pore water pressure is generally reduced and the loss of soil particles is prevented by installing drainpipes. The installation of drainpipes, however, can cause the concentration of flow channels and other ground instability problems. In this paper, a novel pin-holed pipe anchor is proposed to overcome the problems occurring in subsea tunnels. The pin-holed pipe anchor is a pipe-type support member designed to reinforce the ground while simultaneously enabling flow into the tunnel. Here, the design requirements of the pin-holed pipe anchor were examined through material tests, and the structural–hydraulic characteristics of the pin-holed pipe anchor were investigated through a model test. Furthermore, the applicability of the pin-holed pipe anchor to an actual tunnel was evaluated by numerical analysis of actual tunnels. Through selection of an appropriate perforated drainage area and bonded length, the pin-holed pipe anchor contributed to the improvement of the structural and hydraulic stabilities of the tunnel.  相似文献   

9.
Abstract

Collapse is a major threat in tunnel construction. How to predict collapse risk accurately and timely is a complicated problem. In this paper, a non-linear mathematical model is applied to obtain the potential risk indices for a submarine tunnel using statistical analysis based on previous submarine tunnels, such as the Seikan tunnel and Xiang’an tunnel. Rough set theory is used to screen risk indices, determine each indicator value, and classify risk factors. Traditional weight calculation methods that are overly dependent on expert experience and other subjective factors are optimized and improved. Based on the frequency of each risk factor, the objective weight value of each risk index is determined according to weight back analysis theory. The ideal point method is used to calculate the collapse risk level. Predictions made by this new method are consistent with the actual tunnel collapse risk levels. This new method provides theoretical and technical basis for effectively predicting tunnel collapse.  相似文献   

10.
This paper presents the results of an investigation into the effect of lining leakage on the structural performance of lining in subsea tunnels. A parametric study on a number of hypothetical subsea tunnels was conducted within the framework of two-dimensional stress–pore pressure coupled finite element analysis with due consideration of tunnel cover depth, depth of water to seabed, and ground type. The results indicate that the lining leakage increases axial thrust as well as bending moment, with more pronounced increases in bending moment. Also shown is that there exists an increasing trend of leakage induced lining forces with an increase in the water depth above the seabed but with no significant influence from the cover depth. It is also shown that the progressive development of leakage induced lining forces can be best fitted with an exponential function which can be used to predict the lining force increase for a given tunnel condition. Practical implications of the findings are discussed.  相似文献   

11.
This study used the strength reduction method to analyze the seismic stability of a subsea tunnel under the effects of seepage and temperature. Excess pore water pressure within the rock mass was first eliminated by calculating the consolidation; then, an earthquake wave was applied to begin the dynamic and time-history analysis and to obtain the maximum horizontal displacement of the model boundary. Finally, a temperature field model was established for the thermal analysis of the structure. The temperature of each node of the structure was regarded as a form of outside load applied to the reduction model; both sides of the vertical horizontal displacement of the boundary nodes and gravity were used as inputs for the static analysis when the vertex horizontal displacement reached its maximum value. By continuously decreasing the shear strength parameters, the safety factor of the tunnel structure was determined. The results show that the plastic zone first appeared in a smaller range on both sides of the tunnel arch feet near the lining and vault of both sides. The safety factor decreased with increasing water depth and overburden layer thickness.  相似文献   

12.
Analytical solutions for water inflow and water pressure based on steady-state water inflow into a circular subsea tunnel in a semi-infinite aquifer are deduced depending on the rock permeability, drainage at the lining, and grouting parameters. Based on the parameters of the Qingdao Jiaozhou Bay subsea tunnel, the differences between the proposed solutions and three previous methods are analyzed. Comparisons of the results of different methods verify the validity of the proposed analytical solutions and manifest the superiorities of the proposed solutions in reflecting the effects of grouting and lining structure on the seepage problems in a subsea tunnel. Discussion of the lining structure is also made and we conclude that “block-based and limited drainage” should be the design principle of lining structures. Finally, the method of identifying the most rational and economical grouting parameters is presented.  相似文献   

13.
During tunnel excavation, the deformation of surrounding rock due to the unloading of rock mass will vary with time. However, the measured displacement of surrounding rock is only a part of the actual longitudinal deformation profile. There is a need to analyze the longitudinal deformation profile to identify the deformation state and evaluate the stability of surrounding rock mass. In the present article, the variation of pre-deformation of surrounding rock due to excavation was analyzed, and the release coefficient was obtained from the measured results. For the Qingdao subsea tunnel, the measured crown settlement of surrounding rock was analyzed using the regression analysis method, and the longitudinal deformation profile of rock mass was simulated using the numerical calculation method. Moreover, based on the conditions of the subsea tunnel, a solid-fluid coupling model test was carried out to check the reliability of the numerical calculation results. The results of the model test were consistent with the numerical calculation results.  相似文献   

14.
地下气库的围岩稳定性关系到地下气库的安全与使用。影响地下洞室稳定的因素很多,解析法虽然可以得到精确解,但是只能针对圆形洞室。而数值计算方法可以计算各种情况下围岩的应力、变形、塑性分布等情况。利用有限元分析软件分析了洞室形状对围岩稳定性的影响,确定了合理的洞形;讨论了围岩应力应变随深度的变化规律,以及不同的支护类型对围岩变形的影响,确定了经济合理的支护类型。最终为该地质条件下的洞室围岩稳定设计提供了依据。  相似文献   

15.
Abstract

Due to the strong disintegration and water erosion of completely weathered granite, water and mud inrush disasters are apt to take place in this zone during underwater tunnel construction. The pore, compactness, seepage path length, fracture geometries and their interconnections for water and mud transfer are strongly influenced by confining pressure and waterproof-resistant slab safety thickness. In order to inspect the influence, a series of experiments based on a self-designed testing system and non-Darcy testing method were performed. The results indicated that the water and mud inrush evolution increased with the increase of confining pressure and decreased with the increase of safety thickness. In particular, the confining pressure mainly influences the initial evolution stage, and a critical safety thickness to prevent water and mud inrush is obtained. Besides, the non-Darcy testing method results shows that the water and mud inrush evolution affects the influence of non-Darcy flow. For example, while the safety thickness was smaller than the critical value, the evolution was large and unstable and its behavior transferred into nonlinear. In this case, the flow changed to non-Darcy flow.  相似文献   

16.
Water inrush from completely weathered granite has presented a significant challenge for tunnel construction, suggesting the urgency and importance of revealing the water inrush mechanism. In this paper, a seepage erosion model is proposed to describe the water inrush. Assuming that completely weathered granite consists of solid grain phase, fluid phase, and fluidized grain phase, the three-phase interaction was constrained by mass balance equations, and the erosion of fluidized grains was described by a modified porosity evolution equation. The fluid flow is governed by a coupled Darcy–Brinkman/Navier–Stokes equation, which responds to the variation of the flow pattern in the evolution process. Then, the validity of the model has been proved, and the superiority has been studied by comparing with the previous models. The comparison results showed that the flow pattern has a significant impact on pore pressure, water velocity, and mutation time, and the proposed model can more accurately predict the development of velocity. Furthermore, this model was used to simulate the development of water inrush and achieved good results in predicting the direction, channel size, and whole evolution process of water inrush. The research findings from the paper can benefit tunnel engineering in the case of water inrush disasters.  相似文献   

17.
Abstract

The Zhanjiang Bay Sea-crossing Tunnel is the first phase of an ambitious plan of the Golden Triangle Economic Zone in southwestern China and passes underneath the deepest artificial shipping channel with the highest level in Asia. The tunnel is a world-record extralong and small-diameter corridor constructed using an uninterrupted single-end shield tunneling method in subsea soft ground under ultrahigh hydraulic pressure for water conveyance. This case study first highlights the engineering challenges of constructing the sea-crossing shield tunnel in subsea soft ground under ultrahigh hydraulic pressure. A series of key techniques are then investigated and some innovations are proposed to address the engineering challenges in the following four key aspects of the sea-crossing shield tunneling process: (a) optimal design of segmental linings; (b) adaptive reformation of the shield machine; (c) structural construction of deep vertical shafts; and (d) supporting techniques of long-distance advancing. On the basis of the field monitoring and numerical analyses, it is concluded that the implemented key techniques ensure the successful management and control of the engineering challenges in terms of optimizing the segmental lining, selecting the shield machine and constructing the vertical working shaft during the sea-crossing shield tunneling process with limited geological investigation data available under submarine conditions.  相似文献   

18.
基于赤潮灾害风险评估理论和海坛海峡的浮游生物与水文常规监测数据, 采用层次分析法(AHP, Analytic Hierarchy Process)构建了海坛海峡赤潮灾害风险评估指标体系, 运用熵值法与变异系数法组合赋予权重, 建立了较为合理可信的评估模型, 并初步给出了海坛海峡赤潮灾害生态风险等级区划图。结果表明: 春季, 中级-较高级风险区主要分布在海峡北部, 海峡南部主要为低风险等级; 夏季, 较高级风险区存在于南部, 绝大部分海区属低风险海域; 秋季, 以低中风险等级为主, 中级风险区主要分布在海峡的西北部与东南部; 冬季, 较高级与高级风险海域位于海峡的西北部和东北部。研究海域的富营养化程度较高, 且富营养化指数权重较大, 减少氮磷入海可降低致灾、孕灾危险度, 进而能够降低赤潮灾害发生的风险。通过多年的赤潮事件结合验证表明, 赤潮发生的时空特征与致灾危险度分布具有较好的关联性。  相似文献   

19.
It is necessary to construct the undersea tunnel across the Taiwan Straits because it would help strengthen communication between Taiwan and the mainland, promote economic and cultural exchanges, and uphold national unification and territorial integrity. Nowadays, there are many undersea tunnels in the world; the English Channel Tunnel and the Seikan Tunnel are two of the most famous. Rich experience has been obtained during the exploration, surveying, design, construction and operation of these undersea tunnels. So, technologically, it is completely feasible to construct the undersea tunnel of the Taiwan Straits. The total length of the undersea Taiwan Straits tunnel is about 220?km; however, water along most of the proposed tunnel site, is less than 50?m deep and the geological condition of the site is relatively good. Although technical difficulties exists in design and construction, there are some favorable aspects. It is, therefore, necessary to start a study by launching some exploration surveys and collecting related data.  相似文献   

20.
As there are no specific guidelines on design of subsea pipelines crossing active seismic faults, methods for land buried pipelines have been applied to. Taking the large seismic fault movement into account, this paper proposes improved methods for seismic designs of subsea pipelines by comprehensively investigating the real constraining of soil on the pipelines, the interaction processes of soil with the pipeline, the plastic slippage of the soil, and the elastic-plastic properties of the pipeline materials. New formulas are given to calculate the length of transition section and its total elongation. These formulas are more reasonable in mechanism, and more practical for seismic design of subsea pipelines crossing active faults.  相似文献   