首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 547 毫秒
1.
The post-earthquake debris flows in the Wenjia Gully led to the exposure of the shortcomings in the design of the original conventional debris flow mitigation system. A predicament for the Wenjia mitigation system is a large amount of loose material (est. 50 × 106 m3) that has been deposited in the gully by the co-seismic landslide, providing abundant source material for debris flows under saturation. A novel design solution for the replacement mitigation system was proposed and constructed, and has exhibited excellent performance and resilience in subsequent debris flows. The design was governed by the three-phase philosophy of controlling water, sediment, and erosion. An Early Warning System (EWS) for debris flow that uses real-time field data was developed; it issues alerts based on the probabilistic and empirical correlations between rainfall and debris flows. This two-fold solution reduces energy of the debris flow by combining different mitigation measures while minimizing the impact through event forecasting and rapid public information sharing. Declines in the number and size of debris flows in the gully, with increased corresponding rainfall thresholds and mean rainfall intensity-duration (I-D) thresholds, indicate the high efficacy of the new mitigation system and a lowered debris flow susceptibility. This paper reports the design of the mitigation system and analyzes the characteristics of rainfall and debris flow events that occurred before and after implementation of the system; it evaluates the effectiveness of one of the most advanced debris flow mitigation systems in China.  相似文献   

2.
在2008年5月12日汶川地震后的地震灾区暴发了许多泥石流灾害,其中以四川省绵竹市清平乡文家沟泥石流最为显著。文家沟原来不是泥石流沟,在汶川地震时由于滑坡形成的巨大的滑坡-碎屑流堆积体改变了文家沟的泥石流形成条件,在此后的3个雨季内,文家沟先后暴发了5次大规模和特大规模的泥石流灾害,其中以8.13文家沟泥石流规模和危害最大。8.13文家沟泥石流暴发时的总降雨量为227mm,泥石流持续时间约2.5h,泥石流总量约310×104m3;泥石流造成7人死亡,5人失踪,39人受伤,479户农房被掩埋,直接经济损失4.3亿元。5次大规模和特大规模的泥石流以及洪水仅带走了16%的可以很容易形成泥石流的滑坡-碎屑流堆积物,文家沟如再遭遇较大降雨还会暴发泥石流。即使在今后的雨季中暴发几次规模如8.13泥石流一样大的特大规模泥石流,文家沟在较大降雨下仍然可能暴发泥石流灾害,因此对文家沟泥石流的防治工作将是一个长期的工作。  相似文献   

3.
2008年“5·12”汶川地震极大地改变了震区泥石流的特征,不仅增强了泥石流的活动性,同时也使得震区在相当长的时间内都要面临泥石流的威胁。本文基于前人大量的研究成果,并利用遥感解译结合现场调查等手段,分析了汶川县泥石流沟道纵坡降、沟壑密度、两岸坡度等基本发育特征;进而分析了地震前后汶川县降雨分布及泥石流相关降雨参数变化特征。结果显示,流域内泥石流沟的沟壑密度在0.2~4之间,属于微度土壤侵蚀区域,泥石流的沟床纵坡降偏大,有利于泥石流的发生;泥石流流域内斜坡坡度多为30°~40°,有利于灾害的发生;震后汶川县年均降雨量增加了5.17%,降雨多集中在7~9月份,降雨量由南及北逐渐降低;震后泥石流的降雨阈值在2008~2013年呈现缓慢回升的趋势,但2019年又有所下降,预计恢复到震前水平尚需要一定时间;同时震后汶川县泥石流物源丰富,震后物源量呈现“震荡式衰减”的演化趋势,但体量仍然很大,对泥石流仍需坚持监测预警工作。  相似文献   

4.
汶川震区文家沟泥石流成灾机理与特征   总被引:4,自引:0,他引:4  
文家沟位于绵竹市清平乡,属于5·12汶川Ms8.0级地震极重灾区.地震发生后的3个汛期内,文家沟曾先后发生5次典型泥石流灾害,其中以2010年8月13日泥石流灾害最为严重,规模与灾情巨大,社会影响深远.在对文家沟泥石流跟踪调查的基础上,探讨了泥石流的成灾机理和特征.研究表明:(1)文家沟泥石流是地震和强降雨共同作用的结...  相似文献   

5.
Bin Yu  Yu Ma  Yufu Wu 《Natural Hazards》2013,65(1):835-849
The debris flow, which was triggered in the Wenjia Gully on August 13, 2010, is an extreme example of mass movement events, which occurred after the Wenchuan earthquake of May 12, 2008. This Earthquake triggered in the Wenjia Gully the second largest co-seismic landslide, which can be classified as a rockslide-debris avalanche. A lot of loose sediments was deposited in the basin. In the main so called Deposition Area II of this landslide, with a volume of 30?×?106?m3, flash floods can easily trigger debris flows because of the steep bottom slope and the relative small grain sizes of the sediments. The largest debris flow of August 13, 2010 destroyed the most downstream dam in the catchment during a heavy rain storm. The debris flow with a peak discharge of 1,530?m3/s and a total volume of 3.1?×?106?m3 caused the death of 7 persons, 5 persons were missing, 39 persons were injured and 479 houses buried. After three rainy seasons, only 16?% of the landslide-debris deposition was taken away by 5 large-scale debris flow events. Since the threshold for rainfall triggered debris flows in the Wenjia Gully and other catchments drastically decreased after the Wenchuan Earthquake, new catastrophic events are expected in the future during the rainy season.  相似文献   

6.
赵家沟位于北川县擂鼓镇坪上村西北侧,属汶川地震极重灾区,在地震发生前为一般性清水沟或洪水沟。由于地震的影响,流域内发育了多处滑坡和崩塌,斜坡上和沟道中堆积了大量松散固体物质。在2008年9月24日暴雨的作用下,赵家沟流域发生了百年不遇的泥石流灾害,成为地震次生泥石流沟。通过现场实地调查和室内分析,对地震次生泥石流灾害形成的地质地貌条件、物源条件和水源条件进行了分析。表明地震次生泥石流灾害的发生频率和规模有可能加大,其危险性由于松散固体物质的增大而上升,这是地震次生泥石流灾害显著的特征。  相似文献   

7.
Several giant debris flows occurred in southwestern China after the Wenchuan earthquake, causing serious casualties and economic losses. Debris flows were frequently triggered after the earthquake. A relatively accurate prediction of these post-seismic debris flows can help to reduce the consequent damages. Existing debris flow prediction is almost based on the study of the relationship between post-earthquake debris flows and rainfall. The relationship between the occurrence of post-seismic debris flows and characteristic rainfall patterns was studied in this paper. Fourteen rainfall events related to debris flows that occurred in four watersheds in the Wenchuan earthquake area were collected. By analyzing the rainfall data, characteristics of rainfall events that triggered debris flows after the earthquake were obtained. Both the critical maximum rainfall intensity and average rainfall intensity increased with the time. To describe the critical conditions for debris flow initiation, intensity–duration curves were constructed, which shows how the threshold for triggering debris flows increased each year. The time that the critical rainfall intensities of debris flow occurrences return to the value prior to the earthquake could not be estimated due to the absent rainfall data before the earthquake. Rainfall-triggering response patterns could be distinguished for rainfall-induced debris flows. The critical rainfall patterns related to debris flows could be divided on the basis of antecedent rainfall duration and intensity into three categories: (1) a rapid triggering response pattern, (2) an intermediate triggering response pattern, and (3) a slow triggering response pattern. The triggering response patterns are closely related to the initiation mechanisms of post-earthquake debris flows. The main difference in initiation mechanisms and difference in triggering patterns by rainfall is regulated by the infiltration process and determined by a number of parameters, such as hydro-mechanical soil characteristics, the thickness of the soil, and the slope gradient. In case of a rapid triggering response rainfall pattern, the hydraulic conductivity and initial moisture content are the main impact factors. Runoff erosion and rapid loading of solid material is the dominant process. In case of a rainfall pattern with a slow triggering response, the thickness and strength of the soil, high hydraulic conductivity, and rainfall intensity are the impact factors. Probably slope failure is the most dominant process initiating debris flows. In case of an intermediate triggering response pattern, both debris flow initiation mechanisms (runoff erosion and slope failure) can play a role.  相似文献   

8.
On 13 August 2010, significant debris flows were triggered by intense rainfall events in Wenchuan earthquake-affected areas, destroying numerous houses, bridges, and traffic facilities. To investigate the impact force of debris flows, a fluid–structure coupled numerical model based on smoothed particle hydrodynamics is established in this work. The debris flow material is modeled as a viscous fluid, and the check dams are simulated as elastic solid (note that only the maximum impact forces are evaluated in this work). The governing equations of both phases are solved respectively, and their interaction is calculated. We validate the model with the simulation of a sand flow model test and confirm its ability to calculate the impact force. The Wenjia gully and Hongchun gully debris flows are simulated as the application of the coupled smoothed particle hydrodynamic model. The propagation of the debris flows is then predicted, and we obtain the evolution of the impact forces on the check dams.  相似文献   

9.
On Monday, May 12, 2008, a devastating mega-earthquake of magnitude 8.0 struck the Wenchuan area, northwestern Sichuan Province, China. The focal mechanism of the earthquake was successive massive rock fracturing 15 km in depth at Yingxiu. Seismic analysis confirms that the major shock occurred on the Beichuan–Yingxiu Fault and that aftershocks rapidly extended in a straight northeast–southeast direction along the Longmenshan Fault zone. Fatalities approaching a total of 15,000 occurred, with a significant number resulting from four types of seismically triggered geohazards—rock avalanches and landslides, landslide-dammed lakes (“earthquake lakes”), and debris flows. China Geological Survey has identified 4,970 potentially risky sites, 1,701 landslides, 1,844 rock avalanches, 515 debris flows, and 1,093 unstable slopes. Rock avalanches and landslides caused many fatalities directly and disrupted the transportation system, extensively disrupting rescue efforts and thereby causing additional fatalities. Landslide-dammed lakes not only flooded human habitats in upstream areas but also posed threats to potentially inundated downstream areas with large populations. Debris flows become the most remarkable geohazards featured by increasing number, high frequency, and low triggering rainfall. Earthquake-triggered geohazards sequentially induced and transformed to additional hazards. For example, debris flows occurred on rock avalanches and landslides, followed by landslide-dammed lakes, and then by additional debris flows and breakouts of the landslide-dammed lakes and downstream flooding. Earthquake-induced geohazards occurred mainly along the fault zone and decreased sharply with distance from the fault. It can be anticipated that post-earthquake geohazards, particularly for debris flows, will continue for 5–10 years and even for as long as 20 years. An integrated strategy of continuing emergency response and economic reconstruction is required. The lesson from Wenchuan Earthquake is that the resulted geohazards may appear in large number in active fault regions. A plan for geohazard prevention in the earthquake-active mountainous areas is needed in advance.  相似文献   

10.
汶川地震后,流域内产生大量松散物源,使走马岭沟由一季节性冲沟演变为一条潜在泥石流沟,在地震后的3个汛期内发生多次泥石流,并造成灾害,其中以2008-9-24泥石流和2010-8-13泥石流最为严重。本文利用3期遥感影像并结合野外调查,对走马岭沟泥石流的形成条件进行了论述,对比分析了走马岭泥石流沟2008年、2009年、2010年3个汛期后流域的动态变化特征,主要表现为:(1)在不同降雨强度下,走马岭泥石流具有复合型物源区启动方式,并先从局部性支沟发生泥石流,进而演变为整个流域全面暴发泥石流。(2)经历了2008年、2009年、2010年3个雨季后,走马岭流域物源储量及物源供给形式发生变化,其中崩塌规模增加了1.87%; 滑坡增加了25.35%; 沟道及坡面松散堆积减少了67.47%,减少部分大部分转化为泥石流沟道堆积物。(3)不同降雨强度下,走马岭泥石流堆积区范围边界变化明显,且不同堆积扇间存在叠加关系; 结合走马岭"9·24"堆积扇范围和"8·13"堆积扇前缘堆积痕迹及影像特征,推测出走马岭"8·13"堆积扇堆积面积约8.76×104m2。最后对泥石流成因机理及发展趋势进行了初步分析。结果显示,走马岭为一高频泥石流沟,仍具备形成大规模泥石流的条件。  相似文献   

11.
余斌  杨凌崴  刘清华  常鸣 《地球科学》2020,45(4):1447-1456
泥石流形成区沟床宽度和颗粒粒径对沟床起动型泥石流的发生影响很大,在强烈地震影响区内显得尤为突出,但目前的泥石流预报中还没考虑到这两个因素,无法准确预测强震区泥石流的发生.在泥石流10 min和1 h精细化预报模型基础上,通过现场调查群发泥石流事件,结合汶川地震强烈影响区泥石流的演化特点,引入了泥石流形成区沟道宽度和颗粒粒径的影响,建立了改进的精细化泥石流10 min和1 h预报模型,并在贵州望谟打易和四川德昌群发泥石流、汶川地震强烈影响区的文家沟多次泥石流事件中获得了很好的验证结果,得出泥石流形成区的颗粒粒径代表泥石流的地质因子,泥石流形成区沟床宽度代表泥石流的地形因子之一,这2个因子在泥石流发生中的作用都非常重要;改进的精细化10 min和1 h预报模型以及临界值,可以用于强烈地震区和一般的泥石流预报.   相似文献   

12.
震后泥石流松散物质显著增多,临界雨量降低,导致泥石流暴发频率增加、规模增大,从而使震后灾区泥石流堵江事件频繁发生,给灾区带来严重的二次灾害。为了评价震后泥石流堵江概率大小,本文在野外考察基础上,获得研究区泥石流沟基础数据,并根据水文模型计算不同频率下的泥石流规模; 在此基础上利用泥石流堵江公式,获取研究区域泥石流堵江危险程度(数值),并结合研究区域已发生的泥石流堵江事件,界定了泥石流堵江公式的临界值,使之能够更加准确用来判定泥石流堵江概率,并对 5·12 地震极震区都汶公路沿线的7条泥石流在不同频率下的泥石流堵江概率进行评价。评价结果显示:牛眠沟和关山沟在暴发50a及其以上泥石流时,会发生堵江; 烧房沟、红椿沟和磨子沟在暴发10a及其以上泥石流时,会发生堵江事件; 洱沟和太平沟在暴发5a及其以上泥石流时便可能发生堵江; 上述泥石流沟一旦发生堵江,便会给映秀镇和都汶公路带来严重灾难。通过本文获取的堵江临界值可以作为判定泥石流堵江的参考标准,为泥石流防治、预报提供参考,同时可以为灾后重建和预防二次灾害提供科学借鉴。  相似文献   

13.
四川汶川地震-滑坡-泥石流灾害链形成演化过程   总被引:3,自引:0,他引:3  
张永双  成余粮  姚鑫  王军  吴树仁  王猛 《地质通报》2013,32(12):1900-1910
2008年“5·12”汶川Ms 8.0级地震之后,地震灾区表现出显著的强震地质灾害后效应。地震造成山体分水岭及山脊部位产生大量的崩塌和滑坡,崩滑体大多散落在山体的中上部,在强降雨作用下大量松散堆积物沿陡峻的沟道汇聚、加速,形成破坏性极大的高位泥石流,从而构成典型的地震-滑坡-泥石流灾害链。在回顾汶川地震灾区同震地质灾害的基础上,调查分析了震后汛期地质灾害的主要类型及其6种表现形式,将地震-滑坡-泥石流灾害链形成、演化过程划分为4个阶段:孕育阶段、地震同震滑坡阶段、震后滑坡-泥石流发育阶段、高位泥石流的动态演化阶段,提出高位泥石流的判识指标,并探讨其分布特征、动态变化趋势及其防治对策。  相似文献   

14.
Large-volume debris flow events are defined when the volume of solid materials exceeds 1 million m3. Traditional engineering measures, such as check dams, diversion channels, and flumes, are effective for normal debris flow control but are not sufficient to control large-volume debris flows. Experiments were conducted with an artificial step-pool system on the new Wenjiagou Gully to mitigate large-volume debris flows. The old Wenjiagou Gully was buried by 81.6 million m3 of loose solid material created by a landslide that was triggered by the Wenchuan earthquake on May 12, 2008. The new gully was formed during the scouring process caused by debris flows in 2008. Large-volume debris flows were initiated by rainstorm flood with high kinetic energy. The artificial step-pool system was constructed with huge and big boulders on the new Wenjiagou Gully in 2009. The step-pool system dissipated flow energy in steps and hydraulic jumps. Analysis proved that the step-pool system dissipated two-third of the kinetic energy of flow; thus, the critical discharge for triggering debris flow increased threefold. Due to the step-pool system maximized the flow resistance and protected the bed sediment and banks from erosion, the rainstorm floods in 2009 did not trigger debris flows. In 2010, the step-pool system was replaced with 20 check dams. Huge boulders were broken into small pieces of diameter less than 0.5 m and were used as building materials for the 20 dams. Without the protection of the step-pool system, a rainstorm flood scoured the base of the dams and caused failures for all of the 20 check dams in August 2010. The flow incised the gully bed by 50 m. The loose bank materials slid into the flow mixed with water and formed a large-volume debris flow with a volume of 4.5 million m3. Many houses were buried by the debris flow, and 12 people were killed. Comparison of the two strategies proved that energy dissipation structures are necessary for controlling large-volume debris flows. Check dams, if they are stable, may reduce the potential of bank failures and control debris flows. The step-pool system dissipates flow energy and control gully bed incision and bank failure. A combination of check dams and step-pool systems may be the most effective for mitigating debris flows.  相似文献   

15.
A dramatic increase in debris flows occurred in the years after the 2008 Wenchuan earthquake in SW China due to the deposition of loose co-seismic landslide material. This paper proposes a preliminary integrated model, which describes the relationship between rain input and debris flow run-out in order to establish critical rain thresholds for mobilizing enough debris volume to reach the basin outlet. The model integrates in a simple way rainfall, surface runoff, and concentrated erosion of the loose material deposited in channels, propagation, and deposition of flow material. The model could be calibrated on total volumes of debris flow materials deposited at the outlet of the Shuida catchment during two successive rain events which occurred in August 2011. The calibrated model was used to construct critical rainfall intensity-duration graphs defining thresholds for a run-out distance until the outlet of the catchment. Model simulations show that threshold values increase after successive rain events due to a decrease in erodible material. The constructed rainfall intensity-duration threshold graphs for the Shuida catchment based on the current situation appeared to have basically the same exponential value as a threshold graph for debris flow occurrences, constructed for the Wenjia catchment on the basis of 5 observed triggering rain events. This may indicate that the triggering mechanism by intensive run-off erosion in channels in this catchment is the same. The model did not account for a supply of extra loose material by landslips transforming into debris flow or reaching the channels for transportation by run-off. In August 2012, two severe rain events were measured in the Shuida catchment, which did not produce debris flows. This could be confirmed by the threshold diagram constructed by the model.  相似文献   

16.
都江堰市龙池镇麻柳沟泥石流特征及形成条件分析   总被引:1,自引:0,他引:1  
通过对都江堰市龙池镇麻柳沟泥石流灾害现场调查,分析了泥石流的特征及形成条件,并对沟道内松散固体物质储量进行了计算,分析了危险区范围。结果表明:麻柳沟流域的地形特征为泥石流形成提供了有利的地形条件,"5.12"汶川地震和"4.20"芦山地震为泥石流的形成提供了丰富的物源条件,多次强降雨为泥石流的启动提供了充足的水源条件。通过计算得出,麻柳沟沟道内的松散固体物质储量约为29.21×104 m3,其中形成区13.19×104 m3,流通区3.27×104 m3,堆积区12.75×104 m3,泥石流最大危险范围为0.247 1km2。  相似文献   

17.
在汶川震区沟道型泥石流中,普遍存在一种窄陡沟道类型,窄陡沟道型泥石流具有沟道纵坡陡、平均宽度窄、流域面积小的地形特点,在震区容易瞬间汇流形成大规模突发性泥石流灾害。结合四川省都汶高速沿线2013年“7·10”特大群发性泥石流,重点以窄陡沟道型的磨子沟泥石流为实例,针对该泥石流对都汶高速、岷江等造成的冲击淤埋及堵塞问题,通过现场调查泥石流形成条件和发育特征,采用大型流体动力学计算软件CFX模拟再现50年一遇暴雨频率下此类窄陡型泥石流的动力学过程,分析其危险范围、评价其冲击都汶高速桥梁,堵塞岷江,淹没岷江两岸居民安置点的破坏性影响,为提出针对性的泥石流防治工程措施提供依据。  相似文献   

18.
Wei Zhou  Chuan Tang 《Landslides》2014,11(5):877-887
The Wenchuan earthquake-stricken area is frequently hit by heavy rainfall, which often triggers sediment-related disasters, such as shallow landslides, debris flows, and related natural events, sometimes causing tremendous damage to lives, property, infrastructure, and environment. The assessment of the rainfall thresholds for debris flow occurrence is very important in order to improve forecasting and for risk management. In the context of the Wenchuan earthquake-stricken area, however, the rainfall thresholds for triggering debris flows are not well understood. With the aim of defining the critical rainfall thresholds for this area, a detailed analysis of the main rainstorm events was carried out. This paper presents 11 rainfall events that induced debris flows which occurred between 2008 and 2012 after the Wenchuan earthquake. The rainfall thresholds were defined in terms of mean rainfall intensity I, rainfall duration D, and normalized using the mean annual precipitation (MAP). An ID threshold and a normalized I MAP D threshold graph could be set up for the Wenchuan earthquake-stricken area which forms the lower boundary of the domain with debris flow-triggering rainfall events. The rainfall threshold curves obtained for the study area were compared with the local, regional, and global curves proposed by various authors. The results suggest that debris flow initiation in the study area almost requires a higher amount of rainfall and greater intensity than elsewhere. The comparison of rainfall intensity prior to and after the earthquake clearly indicates that the critical rainfall intensity necessary to trigger debris flows decreased after the earthquake. Rainfall thresholds presented in this paper are generalized, so that they can be used in debris flow warning systems in areas with the same geology as the Wenchuan earthquake-stricken area.  相似文献   

19.
汶川地震后,地震灾区泥石流具有暴发临界雨量小,规模大,危险性高的特点。在考虑降雨和地震作用下,采用灰色关联法分析北川县72条泥石流沟的泥石流规模、流域面积、主沟长度、流域相对高差、流域切割密度、不稳定沟床比、年均降雨量和地震烈度8个影响因子的权重,在此基础上建立震区泥石流危险性评价模型并进一步对其进行危险性评价。结果表明:影响因子中,年均降雨量和地震烈度所占权重最大; 运用本文模型得到的评价结果与刘希林模型基本一致,但危险度值相对提高,其中有7条泥石流沟危险度提高一个等级。  相似文献   

20.
This study investigates the variations in the critical conditions for debris-flow occurrence before and after the Chi-Chi earthquake in the Chen-Yu-Lan watershed, Taiwan. Topographical and rainfall parameters such as the gully gradient, drainage area, rainfall intensity, cumulative rainfall, and rainfall duration in the Chen-Yu-Lan watershed were used to analyze the conditions of debris-flow occurrence over the past 25 years. A recovery equation was proposed on the basis of rainfall parameters and used to determine the variations in the critical line of rainfall that trigger debris flow after the earthquake and to evaluate the recovery period required for the rainfall threshold of debris-flow occurrence after the earthquake to return to that before the earthquake in the watershed. The critical line for the runoff parameter versus gully gradient in the watershed was also presented.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号